Loading...
HomeSearchMy WebLinkAbout2007-12-10 OPH Right of Way Permit2007-12-27 Metropolitan Council SAC Determination Letter2008-00106 Fire Protection2008-02-19 MN DOLI Plan Review Letter2008-02-26 OPH Ltr to Kirk Velett Re Stee Fabrication at Care Center Addition2008-02-28 Structural Engineer Ltr to OPH Re Steel Fabrication2008-03-20 OPH Ltr to Boutwells Campus Administrator Re Exit Corridor2009-03-23 MN DHS Interagency Request for Building Inspection - Warm World Child Care2009-04-29 Special Event Permit2010-07-02 OPH Ltr to VSSA Re Agreement for Payment of City Services2010-07-02 OPH Ltr to VSSA Re Agreement for Payment of City Services (2)2010-08-19 Backflow Preventor (RPZ) Test Report - Fountain Room2010-08-19 Backflow Preventor (RPZ) Test Report - LL Mech Room - Boiler Feed2010-08-19 Backflow Preventor (RPZ) Test Report - Main Floor Garbage Room2010-08-19 Backflow Preventor (RPZ) Test Report - Upper Mech Room - Irrigation2010-08-28 Special Event Permit2012-01-27 Backflow Preventor (RPZ) Test Report - Trash Room2012-08-22 Backflow Preventor (RPZ) Test Report - Fountain Room2012-08-22 Backflow Preventor (RPZ) Test Report - LL Mech Room - Boiler Feed2012-08-22 Backflow Preventor (RPZ) Test Report - LL Mech Room - Irrigation2012-08-22 Backflow Preventor (RPZ) Test Report - LL Soiled Laundry Room2012-08-22 Backflow Preventor (RPZ) Test Report - Main Floor Garbage Area2013-08-29 Backflow Preventor (RPZ) Test Report - Fountain Room2013-08-29 Backflow Preventor (RPZ) Test Report - LL Mech Room - Boiler Feed2013-08-29 Backflow Preventor (RPZ) Test Report - LL Mech Room - Irrigation2013-08-29 Backflow Preventor (RPZ) Test Report - LL Soiled Laundry Room2013-08-29 Backflow Preventor (RPZ) Test Report - Main Floor Garbage Area2014-08-26 Backflow Preventor (RPZ) Test Report - Fountain Room2014-08-26 Backflow Preventor (RPZ) Test Report - LL Mech Room - Boiler Feed2014-08-26 Backflow Preventor (RPZ) Test Report - LL Mech Room - Irrigation2014-08-26 Backflow Preventor (RPZ) Test Report - LL Soiled Laundry Room2014-08-26 Backflow Preventor (RPZ) Test Report - Main Floor Garbage Area2015-08-27 Cross Connection Control Device Performance Test Reports - Interstate Testing2017-08-16 Interstate Testing Cross Connection Control Device Performance Test Reports2018-08-16 Interstate Testing Cross Connection Control Device Performance Test Reports2019 Interstate Testing RBA Reports2021 Interstate Testing RBA Reports2021-09-20 to 11-08 SE Permit - Now Hiring Sign @ 58th St. N.2022 Interstate Testing Reports2022-05-17 to 07-05 SE Permit - Now Hiring Sign @ 58th St. N.2023 Interstate Testing Reports2023-05-11 to 06-29 SE Permit - Now Hiring - Wed Walk In Sign @ 58th St. N.2024 Interstate Testing Reports2024-10-30 DLI Elevator Approval - Car 3BP 2007-00334 Pre Permit Plan Review - Voided & RefundedBP 2007-00339 GradingBP 2007-00356 New Care Center Buiding FoundationBP 2008-00035 Care Center Bldg. Certificate of Occupancy (02-12-2009)BP 2008-00035 New Care Center BuildingBP 2008-00157 New Construction - SAC ChargesBP 2008-00158 New Construction - 58th St. Tunnel StructureBP 2014 State Permit - Door Add to Gables Trolley Area - Sensory StationBP 2017-00137 Re-RoofFP 2008-00164 Fire Alarm Monitoring SystemFP 2008-00245 Fire Protection - Kitchen Hood ProtectionFP 2009-00011 Fire Protection - Clean Agent Suppression Systemto LL Tech RoomFP 2012-00002 Fire Protection - Wet Trash Chute Modification to Anti-Freeze SystemME 2008-00018 New Care Center BuildingOT 2016-00102 Walking Path & Bench PadsPL 2007-00338 Sewer & WaterPL 2008-00019 New Care Center BuildingPL 2008-00206 Water MeterPL PB-P2407-0107 - RPZ Assembly Minor RemodelSI 2009-00093 Sign - Multiple