Loading...
HomeMy WebLinkAbout2004-06-21 Certificate of Grading & Placement of Corner Irons & Related Informatin . E'_ .. -w City of Oak Park Heights y t STJ�" v, COPY CERTIFICATION OF GRADING AND • PLACEMENT OF CORNER IRONS DATE: Z'f/ 7-a)(71 • THIS DOCUMENT MUST BE SUBMITTED TO THE CITY BUILDING DIVISION PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY LO/It 7 ' BLOCK , 2 SUBDIVISION NAME: Autumn Ridge 1st Addition • ADDRESS 5715 Newberry Avenue N. , Oak Park Heights I hereby certify that on L Z°¢' I conducted an on-site field survey and inspection at the above referenced ocation. ' I further verify that the as-built grades and elevations of the site and building are in accordance with the Development Grading Plan or amendments as approved by the City Engineer as well as the approved certificate of survey. Any discrepancies from the original certificate of survey are shown and labeled on the as-built certificate of survey. In addition, all corner irons are in place as of this date. . t aivi+��raeeu�uurr,rs�rxrp Mark D. Kemper 14 :.1.AND-941f03VEYOR i al Printed/Typed Name (Registered Land Surveyor) f�,,, 107 ' .z 1 407 -3,-ix...•.........•••450,.: Minnesota State Registration No. /,''��iOF„i;;l,4 `,�� NOTE: Attach a copy of the Certificate of Survey showing all approved elevations and all revised as-built 14168 Oak Park Blvd. N. , P.O. Box 2007, Oak Park Heights, MN 55082 Phone: (651) 439-4439 - Fax: (651) 439-0574 X04" CITY Or OAK PARK HEIGHTS 14168 Oak Park Boulevard No. • P.O.Box 2007 • Oak Park Heights,MN 55082-2007 • Phone:651/439-4439 • Fax:651/439-0574 April 21, 2004 Homeowner/Resident 5715 Newberry Circle N. Oak Park Heights, MN 55082 Re: "As Built"Certificate of Survey Dear Homeowner/Resident: Please be advised that our files do not indicate that a final "as built"certificate of survey was provided to the City upon the completion of your home construction. At the time of permit issuance, the contractor who built your home was assessed an escrow fee to guarantee this survey provision. I am writing to inform you that the City has engaged Kemper and Associates to verify your survey and prepare"as built"documents for finalization. Kemper &Associates will also be placing or locating existing property pins, for my inspection. You will receive an as built certificate of survey for your property upon his completion. There is no charge to you for this service or the as built certificate of survey. Mr. Kemper or one of his associates should be attending to this service within the next 10 to 15 days. This letter is to advise you of their impending visit to your home and to ask that you provide them with access in order to complete the needed survey for your home. Sincerely, &t / Jim Butler Building Official Tree City U.S.A. • CITY OF OAK PARK HEIGHTS BUILDING DEPARTMENT CERTIFICATE OF OCCUPANCY AND ORDINANCE COMPLIANCE ESCROW Lot : /2 Block : a Plat : i � C c, 40 Address : � �� Developer/Owner: Upp © ,/� (p v ( lcvejz 5 2,(2 , Pending compliance with Ordinance 402 . 07 Subd. H of the Code of Ordinances of the City of Oak Park Heights, the undersigned does hereby escrow $1, 000 . 00 with the City of Oak Park Heights as security for compliance with the following items that are pending completion on the lot above identified., CLAIMS ENDORSEMENT I CITY OF OAK PARK HEIGHTS ALLOWED IN THE AMT.OF$ U DISALLOWED IN THE AMT.OF$ DATE /Q- Za°O7 SIGNATURE City Oak Pa eights 14168 O Park Blvd.N..P.O.Box 2007 Oak Park Heights,MN 55082-2007 Satisfactory completion and inspection of the above items are to be made within thirty days of the issuance of the Certificate of Occupancy. With this, the Building Department will release escrow back to the Developer/Owner. Should the Developer/Owner fail to complete the above items, the City of Oak Park Heights is authorized to complete such items at the Developer' s/Owner' s expense and charge the same against the escrow, refunding thereafter any unused portion. The escrow deposit shall not bear interest . Dated: ?Ay , 19 1-3/<,Zie As, Developer/Owner Phone # - 23 • ACCEPTANCE BY THE CITY On behalf of the City of Oak Park Heights, the escrow is accepted, subject to the provisions of the City Ordinance as provided. � III Dated: c c ? , 19 g Buil• ni g Official c4j2;___ . Dated i , 19; c� 1ty er /Finance Director • _ CITY OF OAK PARK HEIGHTS r 14168 North 57th Street• P.O.Box 2007. Oak Park.Heights,MN 55082"2007`• Phone:651/4394439 • Fax:651/439-0574 July 1•8,2000 Wooddale Builders Inc. CERTIFIED MAIL 422 W,Co.Rd..D RETURN RECEIPT REOUESTED New Brighton,MN 55112. Re: 5750 Newberry Circle N(L:2,B 1,Autumn Ridge 1st), 5715 Newberry,Ave,N.(L..-7,B.2, Autumn Ridge 1st),5685 Newell Circle N.(L.9,B: 1,Autumn Ridge 3`d),13105 56t-St:N..(L. 5, B.2;Autumn Ridge 3rd)and 13120 56t St,N.(L.4,B. 1,Autumn Ridge 3 .. Dear Wooddale Builders: In order for me to process the return of escrow monies for the above-referenced;:the following information must be submitted'to the Building Ofcial for review and approval: 1). :Completed.Certification of Grading-and Placement of Corner Irons-(form attached),and 2):_ As-Built Certificate of Survey noting all-required information(information requirement last:.`, • attached):. Upon-receipt,this information will be reviewed by the Building Official and:pip.locations inspected, You may wish to consider having wood;stakes placed at-tl e:pins for convenienc a of location':If pins-are not located or if they are found to be non-compliant with that of the notations on the-Survey,charges for.. expended staff time will be billed: Note:. All pins must have surveyor's number.on top.i . .I am requesting that you comply with•the above no later than 30 days from the date of this letter: Failure to do so will result in.forfeiture of your escrow money to the City.of"OakPark Heights. If you have any questions,please call me at(651)439-4439. _ Sincerely, - • Jim Butler, Building Official JB:JAH . Enclosures cc:. Kris Danielson,Community.Developinent. Director Judy Holst,Finance Director Mark Vierling,City Attorney . MN State Statue 505.32: Surveyor's Number On New Evidence; Old Evidence To Be Left "Any monuments or permanent evidence of the survey shall have inscribed thereon the registration number of the land surveyor making the survey and no previously existing survey or reference. monuments or landmarks evidencing property lines or corner posts shall be removed or destroyed by the surveyor or such new survey." - Tree City U.S.A. . U.S.Postal Service CER -IED MAIL RECEIPT (G7omt tib Mail Only; No Insurance Coverage Provided) Article Sent To: ru m Wooddale Builders Inc. l t, Postage $ ,33 rg rn Certified Fee 1.40 Postmark Return Receipt • •25. Here 1-4 (En ore eRaq re O , 1=1 Re:Striated beavelY Fee O (Endorsement Required) Total Postage& $ 2 .9 r" ru Name(Please Print Cie omp/eted by metier) Street Apt No.;or PO Box No. ir NCity,State,ZIP+4 PS Form 3800,July 1999 See Reverse for Instructions � $' r n PL 1 F T,iS SEC€ION OfV LEI IVrri' S�i:��t��l-�t� .., n8L11'. P LLa'D r -coml^lQtB. e I. w: emt l 11Ve l a d r d 3 re ant Itetrr t4 fl rt d addre t}he reverse ��.%iatu fa,A9 ee �'[°�ttllt year tth 4 �! Q stx a h thi tote ba f the madptece, • d,fter ,t ftdrr+tt m j ' Ptr on of ,guts Is. d ° . oP on file{roni 14`:41' i s{ Og f?t? enter delivery a idr. bel4vr • } If YES' �. prFlcle`�ddfe3sed'to �, - , t � 11� ' S Inc. 553:12- , rv�a T'IPe " C �erMRed Mail rn FteceiPt for Merchandise RQglster..ed C3 Red 1:1.1n$9 il ,.,0 Yes• • l 4. :Restncted:i�elrvery?:( ra ) to sr a4abel 14 t � S ,t S 2 grt Nt nitegr RtY ry 1Q25a5 99 M ;pie, t { 3 '1 S c Return Receipt Domes, 1999 PS Form���'� July - -__