HomeMy WebLinkAboutME 1995-00299 New Single Family 'W .54 . .._. _ PA.- ..--71'-VONAPV#ANNorter ���`.=" i"a`"Y�'7�:fi ,..� ....,� a ' �'`1 Y ... g'
JILDING
CITY PLUMBING
CITY OF OAK PARK HEIGHTS CITY MECHANICAL 5 .00
PLAN REVIEW FEE
14168 57th Street North .50
STATE SURCHARGE
P.O.Box 2007
SIGN PERMIT
Oak Park Heights, 55082-2007
(612)439-4439
CITY UTILITY(METER)
C�
UTILITY CONNECTION PEE
UTILITY INSPECTION FEE
ME-95-00299 R1A METROS.A.C.
PERMIT NO. Use Zone
INVESTIGATION FEE
Permit Issued For HEATING INSTALLATION PARKS CHARGE
OTHER
PERMISSION IS HEREBY GRANTED TOTAL " 75 . 50
Owner WOODDALE BUILDERS Contractor R I CCAR HTG & A/C
422 W CO RD D 2387 136TH AVE NW
NEWBRIGHTON MN ANDOVER MN 55304
636-2355 754,4000
To carry out the work specified on the following described property,upon the express condition that said persons and their agents,employees
and workmen,in such work done,shall conform in all respects to the provisions of the Building Code.This permit may be revoked at any time upon
the violation of the provisions of said code.
JOB ADDRESS 1:- CLASS OF WORK
NUMBER STREET NEW ADO SIGN ALTER REPAIR MOVE DEMOUSH
571511 NEWBERRY AVE N X
•
FRONT or SIDE or LENGTH HEIGHT NO. AREA OF TYPE OF MAX OCC;
WIDTH LOT OCCUPANCY VALUATION
IN FEET IN FEET STORIES CONST. LOAD
IN FEET ( OCCUPIED
V—N R-3
PROPERTY DESCRIPTION: LOT 7 BLOCK 2 AUTUMN RIDGE 1ST ADDITION
AUTHORIZED WORK/SPECIAL CONDITIONS:
INSTALL PER MANUFACTURER SPECIFICATIONS. WORK MUST COMPLY WITH MN STATE
BUILDING AND MECHANICAL CODE.
ISSUE DATE: 12/22/95 EXPIRATION DATE: 12/22/96
The applicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the
requirements enforced by the City of Oak Park Heights Building"Department. I further agree to notify the Building Official of each of
the required inspections 24 hours in advance as noted on Inspection Record Card.
A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY.'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE
WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR
APE OD OF 120 .TERM 0 THE PERMIT IS 12 MONTHS FROM DATE OF ISSUE.
BUILDING OFFICIAL/AUTHORIZED AGENT Owner or Contractor
PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE.FINE NOT TO EXCEED FIVE HUNDRED DOLLARS(S500.00)OR IMPRISONMENT FOR NOT
MORE THAN NINETY(90)DAYS,OR BOTH.