Loading...
HomeMy WebLinkAbout2015-08-06 Supplemental Application Infomation Response PLAN REVIEW INFORMATION CITY OF OAK PARK HEIGHTS MEETING AUGUST 5, 2015 RANGE 082 INDOOR SHOOTING INFORMATION REQUESTED FOR REVIEW MEETING 8-5-2015 1. Submit original application with signatures in ink. Will be provided at meeting August 5th 2. Provide a survey of the property with a preliminary plat. See attached survey dated July 27, 2015 prepared by Westwood. 3. Provide an environmental waste recovery and removal plan for the site. See attached letter from Action Target dated July 27, 2015. 4. Provide pictures of the site including a view from Highway 5. See attached site photos (4). 5. Identify materials and plans for the eight foot fence proposed on the Memorial avenue side of the building. See Revised Elevation Sheet A-3 dated Aragttst 5 . 9( -- 6. Provide a building material board with colors for the Planning Commission meeting. Will be provided at Planning Commission meeting. 7. Provide the percentage of glass on the Highway 5 facade. Thirty-six percent. (36%) as seen on Revised Elevation Sheet A-3 dated Attgtlst-3`d. 8f 4 8. Revise the plans so that the trail will extend the length of the property on Memorial Avenue. Present drainage ditch engineering is not conducive to any kind of path. Trail should be included in a comprehensive plan. Further discussion at meeting. 9. Provide fixture specifications for all building wall and site lighting. See Revised Site Lighting Sheet A-1 dated August 3rd and attached Specifications (2) for Fixtures A, W and S. 10. Indicate on the plans the location of the trash/recycling area for the building. See Revised Floor Plan A-2 dated August 3rd. 11. Provide sign dimensions and plans for how the signs will be lit. See Sign Plan A-4 dated Aagnst8rd Q)/'4" 12. Landscape plan should be revised so that Skyline Honeylocust are removed from parking lot�i'slla�nds and replaced with Japanese Tree Lilac. See Revised Landscape Plan Sheet 13. Provide locations for mechanical equipment, whether it is mounted on the rooftop or ground, and indicate how it will be screened from Highway 5 and Memorial Avenue North. See Revised Elevation Sheet A-3 dated 3rd Q ` 4. 14. City Staff raised concerns regarding,culverts and the drainage swale in the City easement area. To be discussed at meeting August 5th 15. City Staff also discussed the facades on the Northeast, Southwest and Northwest sides. We should discuss whether the elevations could be provided with more detailing to break up the blank appearance of the building. See Revised Elevation Sheet A-3 dated August-3'd. Addition of large metal scuppers and diffusion rock system will address the concern of blank wall. %I4.. . „ ° ,. „,,.,,_, arc mad-61v 11200 Stillwater Blvd Suite 103 Lake Elmo, Minnesota 55042 651 748 1078 steve @architectse.com