Loading...
HomeMy WebLinkAbout2015-09-21 BWBR Response to 09-16-2015 TPC Letter B W B R SAINT PAUL I MADISON 380 St.Peter Street,Suite 600 651.222.3701 Saint Paul,MN 55102 bwbr.com September 21,2015 Scott Richards TPC 3601 Thurston Ave. N.Suite 100 Anoka, Minnesota 55303 Re: Stillwater Area Public Schools High School - PAC BWBR Commission No.3.2014298.80 Dear Scott: Following are our responses to the 13 requests for additional information to complete our application for amended conditional use permit for Stillwater Area High School. Responses are noted in 'bold italics.' 1. Provide a calculation of the change in impervious area. Provide drainage and ponding calculations. Response: The impervious surface at the high school site will be increased by 235,984 square feet. The drainage and ponding calculations are attached. 2. Provide the anticipated change in SAC. Response: • 99 sinks will be removed,287 sinks added;net increase of 188 sinks. • 1 toilet will be removed, 71 toilets added,net increase of 70 toilets. • 1 Drinking fountain will be removed,26 added,net increase of 25 drinking fountains. • 2 dishwashers will be added. 3. Additional information is required related to parking, including an inventory of existing parking,what is to be removed,and the total upon project completion.Identify where parking for construction workers will be staged. Response: The Traffic Plan(Sheets 200.CT and 201.CT)has a summary of the parking counts.Existing parking is currently 950 stalls.147 of the existing stalls will be removed for the building addition and 421 parking stalls will be added with the expansion of the student lot,the new north lot and expansion of the southeast lot. The total stalls after construction will be 1224. The Phasing Plans identify how the work is planned to proceed and shows the existing tennis court area as the primary staging and parking during the most of the phases of construction. The new north lot will be constructed as part of the first phase(spring and summer of 2016)and then will be used for construction workers during the later phases G:\1429880\03-Data\Code-Regulatory\2015-09-21 Conditional Use Permit Response.docx Mr.Scott Richards Stillwater Area Public Schools High School - PAC September 21, 2015 Page 2 of 3 of work along with the existing tennis court area,until this area is constructed as part of the last phase of work(summer of 2017). 4. Identify if any of the new play fields will be lit or irrigated. Response: No new field lighting or field irrigation will be added as a result of the field improvements. 5. Provide fixture specifications for all building wall and site lighting Response: Light fixture catalog cuts provided. 6. Provide a building material board with colors for the Planning Commission meeting. Response: Proposed building materials for new additions will be presented at the Planning Commission meeting. 7. Provide color building elevations. Response: Colored building elevations and 3D images provided. 8. Provide pictures of the existing building where the additions will be added. Response: Pictures of existing conditions at proposed additions provided. 9. A detail list of the proposed planting is required for the landscape plan. Clearly identify the existing plantings versus the new plantings. Provide additional detailing on tree protection detail. Response: A detailed plant list and updated landscape plan identifying existing and new planting is attached.Additional tree protection detailing has also been provided. 10. Identify the status of the Valley Branch Watershed application. Response: The Valley Branch Watershed District submittal has been made on Tuesday September 22,2015 and is currently beginning their review process. 11. Identify if there will be additional signage added on the building. Response: Additional signage will only be added to identify new exterior doors with a letter and number consistent with the current convention.A sign consisting of individual letters that identifies "Stillwater Stadium"will be incorporated into the arched entry gate design. 12. Provide locations and screening for mechanical equipment, if any,that is not constructed into the building. Response: No new roof top equipment to screen. G:\1429880\03-Data\Code-Regulatory\2015-09-21 Conditional Use Permit Response.docx Mr.Scott Richards Stillwater Area Public Schools High School - PAC September 21, 2015 Page 3 of 3 13. Outline how public access shall be maintained to the existing and proposed facilities. Response: Public access to the proposed new facilities will be consistent with current practice. Community Education coordinates all after hours programming and access for the public to the High School.In addition,public access will be allowed to the Pony Activity Center on a limited basis during normal daytime school hours.Public access will be to the indoor running track,one basketball court and a designated cardio machine area. Sincerely, BWBR 'irk Steve Erickson AIA, LEED AP Attachments: Drainage and Ponding Calculations Detailed Plant List and Updated Landscape Plan c: Tony Willger, Stillwater ISD 834 Greg Buchal, Larson Engineering Ryan Lindahl, Hallberg Engineering G:\1429880\03-Data\Code-Regulatory\2015-09-21 Conditional Use Permit Response.docx