Loading...
HomeMy WebLinkAbout2015-09-09 OPH Ltr returning permit application for work - CUP Required #N r CITY OF OAK PARK HEIGHTS 14168 Oak Park Boulevard No. • P.O.Box 2007 • Oak Park Heights,MN 55082-2007 • Phone:651/439-4439 • Fax:651/439-0574 September 9, 2015 Jim Barton Barton Construction Services 125 Martha St. N. Stillwater, MN 55082 Re: 6163 St. Croix Trail N. —St. Croix Valley Wastewater Treatment Plant Dear Mr. Barton: Enclosed please find the permit application and materials you dropped off on September 25, 2015 related to a demolition and expanded reconstruction of a garage addition to the St. Croix Valley Wastewater Treatment Plant. As per our conversation, a conditional use permit is required for Metropolitan Council to modify the structure. They are in the process of seeking this and likely have been in contact with you as well. At such time they receive approval for this work,please resubmit your work application, along with a local contractor license application for Commercial General Contractor. Please feel free to call, if you have any questions. Sincerely, Jul Hultman Building Official Enclosure Tree City U.S.A. . I 41CITY OF 0 OAK PARK HEIGHTS MI6$Oak Pak Btod, N•Boot 20070 Oak Park Heights.MN 55082•Phone(851)439,4439•Fax(051)439-0574 BUILDING PERMIT APPLICATION Contractor: ew1rG�. ®nsir,,c41w. t.-kec� Applicants Name: iiZ ( inti( Address: rZ- . 4/. City/State/Zip: S1 h'...J �e� wt 56a 8Z Phone#: Gs I. 3 S'-( IC 3 o Fax# State License#: Z 2 Ss--I r3 City License# Lead Certification# E-Mail //4F°e (D 3IZToNCS Project Supervisor: Jrivk f-tt'c3i-i Phone#: (�{• 33c(•`IS3c." E-Mail (A/F(9 iZ roNcS•C0� Owner:SL (c.' lis 16<7 i.1r r,h c.,Oa r--fr-e'4 I- 1 -- f Address: 6(63 S� Cto;K r ., t Al City/State/Zip: nJ S60 Phone Number: "�/ E-Mail CLASS OF WORK: New cV Addition Remodel Repair Deck Demolition Brief Description of work: ( , e- - ,5"; Air p')(C baf�.• BUILDING INFORMATION: Type of Construction Occupancy Number of Stories Square Footage Calculations: 15t Story 2nd Story Basement o Other Max. Occupant Load Fire Sprinklers Required?Yes/No Sprinkled yes/no Separate permits are required for electrical,plumbing,and heating. This permit becomes null and void if work or construction authorized has not commenced within 180 days,or if work is suspended or abandoned for a period of 180 days. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law re onstruction or the performance of construction. Date: 2 5 . (5_ Appli ignature Project Address � �>< `'' ' " Valuatior C S4-7i v FOR OFFICIAL USE ONLY Building Permit$ Plan Review$ Surcharge$ SAC$ Meter$ Utility Inspections$ Investigation Fee$ Other Fees$ TOTAL PERMIT FEE $