HomeMy WebLinkAbout2015-09-09 OPH Ltr returning permit application for work - CUP Required #N r
CITY OF
OAK PARK HEIGHTS
14168 Oak Park Boulevard No. • P.O.Box 2007 • Oak Park Heights,MN 55082-2007 • Phone:651/439-4439 • Fax:651/439-0574
September 9, 2015
Jim Barton
Barton Construction Services
125 Martha St. N.
Stillwater, MN 55082
Re: 6163 St. Croix Trail N. —St. Croix Valley Wastewater Treatment Plant
Dear Mr. Barton:
Enclosed please find the permit application and materials you dropped off on September 25,
2015 related to a demolition and expanded reconstruction of a garage addition to the St. Croix
Valley Wastewater Treatment Plant.
As per our conversation, a conditional use permit is required for Metropolitan Council to modify
the structure. They are in the process of seeking this and likely have been in contact with you as
well.
At such time they receive approval for this work,please resubmit your work application, along
with a local contractor license application for Commercial General Contractor.
Please feel free to call, if you have any questions.
Sincerely,
Jul Hultman
Building Official
Enclosure
Tree City U.S.A.
. I
41CITY OF
0 OAK PARK HEIGHTS
MI6$Oak Pak Btod, N•Boot 20070 Oak Park Heights.MN 55082•Phone(851)439,4439•Fax(051)439-0574
BUILDING PERMIT APPLICATION
Contractor: ew1rG�. ®nsir,,c41w. t.-kec�
Applicants Name: iiZ ( inti(
Address: rZ- . 4/.
City/State/Zip: S1 h'...J �e� wt 56a 8Z
Phone#: Gs I. 3 S'-( IC 3 o Fax#
State License#: Z 2 Ss--I r3 City License#
Lead Certification# E-Mail //4F°e (D 3IZToNCS
Project Supervisor: Jrivk f-tt'c3i-i
Phone#: (�{• 33c(•`IS3c." E-Mail (A/F(9 iZ roNcS•C0�
Owner:SL (c.' lis 16<7 i.1r r,h c.,Oa r--fr-e'4 I- 1 --
f
Address: 6(63 S� Cto;K r ., t Al
City/State/Zip: nJ S60
Phone Number: "�/ E-Mail
CLASS OF WORK: New cV Addition Remodel Repair Deck Demolition
Brief Description of work: ( , e- - ,5";
Air
p')(C baf�.•
BUILDING INFORMATION: Type of Construction Occupancy Number of Stories
Square Footage Calculations: 15t Story 2nd Story Basement o Other
Max. Occupant Load Fire Sprinklers Required?Yes/No Sprinkled yes/no
Separate permits are required for electrical,plumbing,and heating. This permit becomes null and void if work or
construction authorized has not commenced within 180 days,or if work is suspended or abandoned for a period of
180 days. I hereby certify that I have read and examined this application and know the same to be true and
correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified
herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of
any other state or local law re onstruction or the performance of construction.
Date: 2 5 . (5_
Appli ignature
Project Address � �>< `'' ' " Valuatior C S4-7i v
FOR OFFICIAL USE ONLY
Building Permit$ Plan Review$ Surcharge$ SAC$
Meter$ Utility Inspections$ Investigation Fee$ Other Fees$
TOTAL PERMIT FEE $