Loading...
HomeMy WebLinkAbout2002-06-24 Public Works Director Communication Re S & W Installation Status.,Aft Kris L L Y From: Sent: Monda June 24, 2002 3:02 PM To: 'Dennis Postler 'Jim Butler 'Judy Holst'; 'Kim Kamper 'Kris Danielson'; 'Mark J. Vier Subject: Weekend Update Stillwater Motors Sewer and Water Installation Browns Creek Watershed District has stopped the sewer and water installation at Stillwater Motors. The needed a permit from Browns Creek since the opened more than 5000 s feet of land and excavated more than 5 cubic y ards of dirt. I must admit that I did not know that the BCWD rules were so strin Also Miller Excavating had cleared more than the minimum needed for the installation of the sewer and water. Thevalso o�eredthe en�rearea of the eap�o�e|daand beyond. C)urpenn� 'is only for installation ofsewer and water. The removal of the septic fields was not requested. BCVVOalso noted that the silt fence was not properly installed and that the stormwater had a blow out into the MNDOT ri of wa The will need to g et a permit from MNDOT to clean-up the ri of wa Properl install the silt fence and create a construction sedimention / infiltration pond of the approximate size and location as shown on the parkin lot pro which has been submitted to BCWD for review. BCWD is not impl that the pond is properl desi or properl located but for the future uses of the propert but that as an emer measure to prevent future erosion problems to the MNDOT ROW that a temporar construction pond be built. Ear in the day Friday Pete miller had been inbo determine ifhehad the proper permits todo the construction. Depay of Foltz, F reeman, &Asmooia�shad . ondooidhadidn h/ opemn�toin U 'o' sewer and water. At that time no one had mentions BCWD.|told him that the permit was for sewer and water only and / was concerned that hewas opening up more ground than necessary for the project. He told ma that it was open for storage of dirt and for his equipment kz drive around the site. We did discuss that there is not a permit for parking lot Friday evening | had o chance bo inspect the silt fence and the blowout area. The silt fence is not properl installed and there is si delta of sediment in MNDOTS ditch. I called Pete Frida ni and left a messa that the silt fence needs to be properl installed and the need to contact MNDOT for a permit to work in their ROW to repair the dama done.