Subject: Weekend Update Stillwater Motors Sewer and Water Installation
Browns Creek Watershed District has stopped the sewer and water
installation at Stillwater Motors. The needed a permit from Browns Creek
since the opened more than 5000 s feet of land and excavated more
than 5 cubic y ards of dirt. I must admit that I did not know that the BCWD
rules were so strin
Also Miller Excavating had cleared more than the minimum needed for the
installation of the sewer and water. Thevalso o�eredthe en�rearea of
the eap�o�e|daand beyond. C)urpenn� 'is only for installation ofsewer
and water. The removal of the septic fields was not requested. BCVVOalso
noted that the silt fence was not properly installed and that the
stormwater had a blow out into the MNDOT ri of wa
The will need to g et a permit from MNDOT to clean-up the ri of wa
Properl install the silt fence and create a construction sedimention /
infiltration pond of the approximate size and location as shown on the
parkin lot pro which has been submitted to BCWD for review. BCWD is
not impl that the pond is properl desi or properl located but for
the future uses of the propert but that as an emer measure to prevent
future erosion problems to the MNDOT ROW that a temporar construction pond
be built.
Ear in the day Friday Pete miller had been inbo determine ifhehad
the proper permits todo the construction. Depay of Foltz, F reeman,
&Asmooia�shad . ondooidhadidn h/ opemn�toin U 'o'
sewer and water. At that time no one had mentions BCWD.|told him that
the permit was for sewer and water only and / was concerned that hewas
opening up more ground than necessary for the project. He told ma that it
was open for storage of dirt and for his equipment kz drive around the
site. We did discuss that there is not a permit for parking lot
Friday evening | had o chance bo inspect the silt fence and the blowout
area. The silt fence is not properl installed and there is si
delta of sediment in MNDOTS ditch. I called Pete Frida ni and left a
messa that the silt fence needs to be properl installed and the need to
contact MNDOT for a permit to work in their ROW to repair the dama done.