HomeMy WebLinkAbout2015-12-14 City Engineer Plan Review Stantec Consulting Services Inc.
2335 Highway 36 West
St.Paul MN 55113
Tel: (651) 636-4600
Stantec Fax: (651) 636-1311
December 14,2015
Mr. Eric Johnson,Administrator
City of Oak Park Heights
14168 Oak Park Blvd.N.,P.O.Box 2007
Oak Park Heights,MN 5508 2-2007
Reference: Range 082—Revised•Plan Review
Dear Eric,
We have reviewed the resubmittal regarding the proposed Range 082 Indoor Shooting Project,
received 12/8/2015 via email.Following are the remaining items to be addressed:
Sheet C3.1,C3.2-Grading and Erosion Control
1. Please confirm that the erosion control blanket utilized for the ditch in the existing
drainage and utility easement is category 3 erosion control blanket. Extend the blanket
along all disturbed areas of the ditch. Also,add erosion control blanket to the area being
re-established just downstream of the extended culverts.
2. The Trail Section detail shows an 8-foot wide trail,revise to show 1.0-foot wide trail as
shown on Sheet C2.1.
Sheet C4.1 -Utility Plan
1. Revise the note for the culvert extension to indicate: Extend 3-27-inch(insert material)
culverts, 15-feet each. Salvage and reuse 27-inch concrete flared end sections. City will
confirm condition of salvaged flared end sections prior to re-installation.
2. Revise"Minimum RipRap Required Table"to be consistent with City Standard Detail Plate
S TO-13.
Storm Sewer/Storm Water Management
1. The project is subject to review by the Brown's Creek Watershed District.The City shall be
provided a copy of the permit approval letter from the BCWD.
General Comments
1. The City reserves the right to inspect the construction of the project. The City or its
designee shall be present for water and sanitary sewer service connections at the right-of-
way.
l:ir't t =with ccmIrnunity in mind
Mr.Eric Johnson
Page 2 of 2
Reference: Range 082—Plan Review'
2. The Owner will need to comply with all requirements of the NPDES Construction
Stormwater Permit and the Brown's Creek Watershed District. The City reserves the right
to require additional erosion control measures as determined/necessary during the
construction of the project.
3. The Owner shall be responsible for obtaining all required permits.
If you have any questions or require further information,please do not hesitate to contact me.
Regards,
STANTEC CONSULTING SERVICES INC.
.--
. . 1'4 24.41"--,-------
Lee M. Mann,P.E.
City Engineer .
Phone: 651-604-4850 ,
lee.mann@stantec.com
cc: Andy Kegley, Public Works Director
Julie Huliman, Building Official
Scott Richards,City Planner
Mark Vierling,City Attorney
Lisa Danielson,City Arborist
f.)ni.gn,,, h c. rnmur0,,,ii rc,i .'t
Julie Hultman
From: Mann, Lee <Lee.Mann@stantec.com>
Sent: Monday, December 14, 2015 10:09 AM
To: Eric Johnson
Cc: Andrew Kegley; Mark Vierling (MVierling@eckberglammers.com); Scott Richards
(Scott@PlanningCo.com);Julie Hultman; Lisa Danielson
Subject: Range 082 - Review of resubmitted plans
Attachments: Johnson_Mann^2015-12-14_Range082_Review.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
Hi Eric,
Attached is our review of the latest plans for Range 082. Let me know if you have any questions.
Lee
M. Mann, P.E.
Principal
•
Stantec
2335 Highway 36 West St. Paul MN 55113-3819
Phone: (651) 604-4850
Cell: (651) 775-5956
Lee.Mann@stantec.com
Stantec
b ."<ng.6, years of community.creativity.or .. r 'at :,£ shi ll.
The content of this email is the confidential property of Stantec and should not be copied,modified,retransmitted,or used for any purpose except with
Stantec's written authorization.If you are not the intended recipient,please delete all copies and notify us immediately.
Please consider the environment er t before printing this email.
1