Loading...
HomeMy WebLinkAbout2015-12-14 City Engineer Plan Review Stantec Consulting Services Inc. 2335 Highway 36 West St.Paul MN 55113 Tel: (651) 636-4600 Stantec Fax: (651) 636-1311 December 14,2015 Mr. Eric Johnson,Administrator City of Oak Park Heights 14168 Oak Park Blvd.N.,P.O.Box 2007 Oak Park Heights,MN 5508 2-2007 Reference: Range 082—Revised•Plan Review Dear Eric, We have reviewed the resubmittal regarding the proposed Range 082 Indoor Shooting Project, received 12/8/2015 via email.Following are the remaining items to be addressed: Sheet C3.1,C3.2-Grading and Erosion Control 1. Please confirm that the erosion control blanket utilized for the ditch in the existing drainage and utility easement is category 3 erosion control blanket. Extend the blanket along all disturbed areas of the ditch. Also,add erosion control blanket to the area being re-established just downstream of the extended culverts. 2. The Trail Section detail shows an 8-foot wide trail,revise to show 1.0-foot wide trail as shown on Sheet C2.1. Sheet C4.1 -Utility Plan 1. Revise the note for the culvert extension to indicate: Extend 3-27-inch(insert material) culverts, 15-feet each. Salvage and reuse 27-inch concrete flared end sections. City will confirm condition of salvaged flared end sections prior to re-installation. 2. Revise"Minimum RipRap Required Table"to be consistent with City Standard Detail Plate S TO-13. Storm Sewer/Storm Water Management 1. The project is subject to review by the Brown's Creek Watershed District.The City shall be provided a copy of the permit approval letter from the BCWD. General Comments 1. The City reserves the right to inspect the construction of the project. The City or its designee shall be present for water and sanitary sewer service connections at the right-of- way. l:ir't t =with ccmIrnunity in mind Mr.Eric Johnson Page 2 of 2 Reference: Range 082—Plan Review' 2. The Owner will need to comply with all requirements of the NPDES Construction Stormwater Permit and the Brown's Creek Watershed District. The City reserves the right to require additional erosion control measures as determined/necessary during the construction of the project. 3. The Owner shall be responsible for obtaining all required permits. If you have any questions or require further information,please do not hesitate to contact me. Regards, STANTEC CONSULTING SERVICES INC. .-- . . 1'4 24.41"--,------- Lee M. Mann,P.E. City Engineer . Phone: 651-604-4850 , lee.mann@stantec.com cc: Andy Kegley, Public Works Director Julie Huliman, Building Official Scott Richards,City Planner Mark Vierling,City Attorney Lisa Danielson,City Arborist f.)ni.gn,,, h c. rnmur0,,,ii rc,i .'t Julie Hultman From: Mann, Lee <Lee.Mann@stantec.com> Sent: Monday, December 14, 2015 10:09 AM To: Eric Johnson Cc: Andrew Kegley; Mark Vierling (MVierling@eckberglammers.com); Scott Richards (Scott@PlanningCo.com);Julie Hultman; Lisa Danielson Subject: Range 082 - Review of resubmitted plans Attachments: Johnson_Mann^2015-12-14_Range082_Review.pdf Follow Up Flag: Follow up Flag Status: Flagged Hi Eric, Attached is our review of the latest plans for Range 082. Let me know if you have any questions. Lee M. Mann, P.E. Principal • Stantec 2335 Highway 36 West St. Paul MN 55113-3819 Phone: (651) 604-4850 Cell: (651) 775-5956 Lee.Mann@stantec.com Stantec b ."<ng.6, years of community.creativity.or .. r 'at :,£ shi ll. The content of this email is the confidential property of Stantec and should not be copied,modified,retransmitted,or used for any purpose except with Stantec's written authorization.If you are not the intended recipient,please delete all copies and notify us immediately. Please consider the environment er t before printing this email. 1