HomeMy WebLinkAbout2015-12-16 RPZ Rebuild & Test Report (5901 - 5945) - Metro Testing 12-18-15;02: 56PM; # 2/ 2 1
METR OTESTiNG ,
`'*2
Reduced Pressure Zone Backflow Preventer Valve & Double Check (DC) Assembly Valve
Rebuild &Test Report I d•li(PIJS�
(5Yrn
_40-lt_ -tQn"isc.,9Tf'S Rids. 8 -
,frr.. . ,,,ii,
X01- X345 11oia icn rt-e Octic-Piza 4eivrt-5 S` OZ2
1411 1ICLV1 S Rt.- 1 `,d- 2.37(672
lertth morn' (Ac/ c:.c6ielc Jr20, I,41cf h t -1
i f.,,ii . , . ;.tarn iri ik,tr:
ai Pal,)- J
Test ... Check Valve#1 Check Valve#2 Differential Pressure Relief j
1 2 3 4 Leaked ( ) Closed (><1 Leaked ( ) Closed (X Did Not Open( )
Overhau ed ( )
Install ( ) Pressure : I f ,, a ' L 3
�t Pressure : Opened A.t:
R Cleaned Cleaned Cleaned
E Replaced Replaced Replaced
Poppet Poppet Poppet
P Spring Spring Spring
A 0 Ring 0 Ring 0 Ring
Rubber Seat Rubber Seat Rubber Seat
Other Repairs Other Repairs Other Repairs
R
S
Certification # 2 Shutoff Valve:
I hereby certify the foregoing data to be correct and that the device tested is Pass
functioning within e limits •f the standards. Fail D
,iii
Signature: 44111
Date: i lc Assembly Final Test
Performance:
COLE FORD 8F066445 I GARY FORD BFOS8476 1 ALAN FARR BF0664S1
Metro Testing/Metro Mechanical Consultants,LLC 31222 Cedar Creek Rd,Hinckley,MN 55037 612-221-5858 Pass
Plumbing Bond License:PC646918 Mechanical Bond Certificate ID:5054-MB Fail 11110
1
This report is for the purposes of recording only;Owner is responsible for safe operation and upkeep of scheduled maintenance.
kt x uri - q:39 05--7e/