Loading...
HomeMy WebLinkAboutPL 2016-00005 Remodel CITY OF OAK PARK HEIGHTS PERMIT NO.: 2016-00005 14168 OAK PARK BLVD. N. #2007 OAK PARK HEIGHTS,MN 55082-2007 DATE ISSUED: 01/25/2016 (651)351-1661 FAX: (651)439-0574 ADDRESS : 5805 NEAL AVE N PIN : T000028 LEGAL DESC : OAK PARK PONDS ADDITION : LOT - BLOCK - PERMIT TYPE : PLUMBING PROPERTY TYPE : COMMERCIAL CONSTRUCTION TYPE : REMODEL VALUATION : $ 22,050.00 NOTE: WORK SHALL BE PER APPROVED PLANS& COMPLY WITH ALL MN STATE BUILDING AND PLUMBING CODE&LOCAL ORDINANCE REQUIREMENTS.PERMIT ISSUED FOR PLUMBING WORK TO TWIN CITY ORTHO TENANT SPACE REMODEL. VALUE OF PLUMBING 22050 APPLICANT PLUMBING-COMMERCIAL 220.50 PLUMBING STATE SURCHARGE COMMERCIA] 11.03 G.R. MECHANICAL PLBG&HTG. - TOTAL 231.53 12401 IRONWOOD CIRCLE Payment(s) STE 500 CHECK 41186 231.53 ROGERS,MN 55374- (763)428-2663 Minnesota State License#: PLUM-PM061337 OWNER KTJ LIMITED PARTNERSHIP ELEVEN 900 2ND AVE S STE 420 MINNEAPOLIS,MN 55402- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to: (1)the conditions of this permit;(2)the approval plans and specifications;(3)the applicable city approvals,Ordinances,and Codes;and,(4)the State Building Code.This permit is for only the work described,and does not grant permission for additional or related work which requires separate permits.This permit will expire and become null and void if work is not started within 180 days,or if work is suspended or abandoned for a period of 180 days any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the Minnesota State Building Code. SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. 443 Lafayette Road N. MINNESOTA DEPARTMENT OF (651)284-5005 St. Paul,Minnesota 55155 ��QQINDUSTRY www.dli.mn.gov LABOR err ii INDU + i RY Division of Construction Codes and Licensing REPORT ON PLANS Plans and specifications on plumbing: TCO Stillwater Physical Therapy, 5802 Neal Avenue N,Oak Park Heights, Washington County,Minnesota, Plan No. PLB1512-001.54 OWNERSHIP: Twin City Orthopedics,58{2 Neal Avenue N,Oak Park Heights, MN 55082 SUBMITTER: GR Mechanical Plumbing&Heating Inc., 12401 ironwood Circle, Suite 500, Rogers,MN 55374 Plans Dated: December 14,2015 Date Received: December 21,2015 Date Approved: January 8,2016 SCOPE: This review is limited to the provisions of the Minnesota Plumbing Code,as amended.The review is based upon the supposition that the data on which the design is based is correct. Approval is contingent upon requirements included in this report. A copy of the approved plans,specifications,and this Report on Plans must be retained at the project location for future reference. INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of the Minnesota Plumbing Code. No plumbing work may be covered prior to completing the required tests and inspections. The contractor/installer must obtain an inspection permit from the Minnesota Department of Labor and Industry when an installation is tier a state owned facility, Minnesota Department of Health licensed healthcare facility,or a project in an area where there is no local administrative authority. To schedule inspections,contact the state plumbing standards representative for your region. For your regional inspector's contact information,visit our website at http:/:-www.dli.mn.gov/COLD/CCLDContactus.asp REQUIREMENTS: 1. Verify that the existing water supply and waste systems are sized to accommodate the added fixtures(see Minnesota Rules,part 4715.3800 and part 4715.2310). 2. Water supply connections to fixtures or equipment which have inlets below the spill line must be provided with an air gap or approved backflow preventer(see Minnesota Rules, part 4715.2000). This shall include • all potable water connections to equipment not shown such as an ice machine. 3. A water heater with a tank capacity up to 6 gallons may be concealed in a ceiling if the water heater has a corrosion resistant overflow pan with 4-inch minimum side walls. The outlet may not be smaller than the water heater supply line and must continue full-size to a point of safe disposal below the ceiling. Access to the water heater must not require tools(see Minnesota Rules, part 4715.2240). The relief valve pipe should be routed independently to a point of safe disposal below the ceiling. 4. Water heaters,including their controls and valves,must be installed so that they are capable of being reached safely and quickly for inspection,repair,or replacement without requiring the use of tools or the removal of obstacles, panels,or similar obstructions(see Minnesota Rules, part 4715.2240). Water heaters with tank capacities larger than 6 gallons may not be installed above ceiling panels(see Minnesota Rules, part 4715.2240). This information can be provided to you in alternative formats(Braille,large print or audio). An Equal Opportunity Employer - R TCO Stillwater Physical Therapy Plumbing Plan No. PL,B 1512-00154 Page 2 January 8,2016 5. The plumbing fixture schedule shows a 1-inch water supply to the tank-type water closet(WI,American Standard,Model No. 2002.014.020). The water riser diagram shows a 1/2-inch water supply to the water closet. Please verify the size of the water supply to this fixture. 6. A 3-inch minimum vent stack,continuous in size from base to terminal,must be provided for every sanitary building sewer(see Minnesota Rules, part 4715.2520,subpart 1). This stack should be the most remote from the location where the building drain leaves the building. Verify that the required full-size vent stack exists in the building. 7. Above-grade horizontal plumbing piping must be supported as follows(see Minnesota Rules, part 4715.1430, subpart 4): a. Plastic pipe:at least every 32 inches. b. Cast iron:at least every 5 feet;or 10 feet when ten foot lengths of pipe are used. c. Copper tubing(11/4-inch or less): at least every 6 feet. 8. The water distribution system shall be disinfected per Minnesota Rules,part 4715.2250. NOTES: 1. The scope of this project consists of a tenant space remodel in an existing building. The plumbing installation includes tank-type water closets, lavatories,an electric water cooler,exam room sinks,a mop sink, floor drains,and water heaters. 2. This facility is served by existing municipal sewer and water service connections. 3. The plans and specifications were prepared by a licensed plumber. Only the plumber who has prepared the plans may use the plans for construction. If another plumber is contracted to install the plumbing,they must submit their own plans and specifications for the project. 4. The 2012 Minnesota Plumbing Code is available on our website at: www.dli.mn.uov/CCLD/Plumbigs,A5p.... Authorization for construction in accordance with the approved plans may be withdrawn if the plumbing installation is not undertaken within a period of two years. Plan approval does not necessarily mean that recommendations or requirements for change will not be made at some later time when changed conditions, additional information,or advanced knowledge make improvements necessary. Approved: • Manse A. Widmer,Public Health Engineer Plumbing Plan Review and Inspections Unit 651/284-5887, marise.widmer@state.mn.us cc: Twin City Orthopedics GR Mechanical Plumbing&Heating Inc. City of Oak Park Heights Building Official File