HomeMy WebLinkAboutUntitled (2) AGREEMENT DATE -July 29th, 2011 AGREEMENT TO PERFORM SANITARY SEWER CLEANING AND CCTV IN OPH. THIS DOCUMENT SERVES AS A FINAL AGREEMENT BETWEEN THE CITY OF OAK PARK HEIGHTS AND PIPE SERVICES CORPORATION.(THE CONTRACTOR). • The Contractor shall provide all services as delineated in the May 18th,2011 Request for Quotes(RFQ)and as returned to the City in an amount not to exceed$0.45 per linear feet for cleaning,$0.45 per linear feet for televising an estimated 27,000 linear feet per year,$210 per hour for additional root cutting,$210 per hour for additional cleaning and$210 per hour for additional televising from 2011 to 2015.The Contractor's Bid Submittal sheet and related RFQ information is attached and incorporated into this Agreement as "Exhibit A".No additional items provided by the Contractor are part of any agreements. • This Agreement once fully executed shall serve as a notice of acceptance by the City of the Contractor's quote and also acts as a notice to proceed by the City for the submitted price quote. • The Contractor shall complete all work as outlined in Request for Quotes and as quoted on the Bid Submittal Sheet and shall provide all final reporting and closing documents to the City not later than November 1St of each contract year.Failure to complete by this date will entitle the City to withhold 5%of the contracted amount for each day thereafter.The City shall provide timely access to infrastructure. • The City may terminate this Agreement at anytime with fourteen days written notice and for any reason. Any amounts being actually due and payable for satisfactorily completed work will be paid by the City. • Except for intentional or willful acts by the City,the Contractor does hereby release the City from any loss or liability incurred by the Contractor related to the disposition of the work at the site or on this project.The Contractor shall implement best management practices to complete this project and will utilize appropriate caution to complete the work in a safe and efficient manner.The Contractor shall provide proof of insurance,in an amount not less than$1,000,000 to the City,also naming the City as an additionally insured party prior to Oct 11`,2011 or prior to commencing any activities. • The Contractor shall follow all federal,state,county or other laws that may be in effect related to the performance of this project. / f ACCEPTED: A r " =.r date 9/5— .A)// " a d ; ��•`r perry :l eli, President .;;��' ,- SANDRA K �N 6 NOTARY PUBLIC< 1'Cammbsion EaPire$Jen 31.1015((` • Notary date 57i/ .,- •ndy Kegley, Public Works Directo ` :; ,; SANDRA K.KRUSE•ROSL7 IN ! + NOTARY PUBLIC•MINSOTA 5 'CaMMISSIOnExpires Jea31.2015 k) "Exhibit A" To the agreement of quotation from "2011 Request for quotes-Sanitary Sewer cleaning/CCTV Includes: Submitted Quote May 4,2011 2011 Request for Bids-Sanitary Sewer Cleaning and CCTV Bid Submittal Sheet 2011 Request for Bids- Sanitary Sewer Cleaning and CCTV Before submitting a bid, the bidder shall carefully examine the entire contents of the specifications to be thoroughly familiar with all the requirements. The successful bidder shall not be ailowed any extra compensation by reason of any unforeseen difficulties, of which the bidder could have discovered, by reasonable anticipation prior to the bidding. Before submitting a bid, all bidders must examine existing field conditions, and/or specifications to judge for themselves the difficulties with which may arise in the execution of the work. COMPLETE THE FOLLOWING AND RETURN TO ANDY KEGLEY AT THE OAK PARK HEIGHTS CITY HALL NO LATER THAN MAY 18, 2011 Company Name: Pipe Services Corp. Your Name &Title: Kerry Blaisdell, President Contact Information: 16281 Baseline Ave. Shakopee, MN 55379 952-445-3173 Signature: Notary Public: • Year Cleaning Price/ft. CCTV Price/ft. 2011 .45 .45 2012 .45 .45 2013 .45 .45 2014 .45 .45 2015 .45 .45 2011 Request for Quotes—Sanitary Sewer Cleaning/CCTV Summary: The City of Oak Park Heights is seeking quotes from qualiilied contractors to perform sewer cleaning and certified PACP CCTV work over a five year contract period on the sanitary sewer system. Oak Park Heights owns roughly 135,000 linear feet of sewer pipe ranging in diameter from four inches to thirty-six inches, most'of which are between six inches and eight inches in diameter. Physical Address: 14168 Oak Park Blvd N I Oak Park Heights,MN 55082 I 651.439.4439 SCOPE OF WORK: CLEANING SPECIFICATIONS Intent of Jet Cleaning: The intent of line cleaning is to remove foreign materials from the lines • and restore the pipe segment to a minimum of 95%of the original carrying capacity. It is recognized that there are some conditions such as a broken pipe section and/or other major blockage that prevents cleaning from being accomplished or where additional damage would result if cleaning were attempted. Such Instances will be reviewed on a case by case basis. Cleaning Equipment: High-Velocity Jet Equipment shall be used as the primary cleaning method on this project. All high-velocity pipe cleaning equipment shall be constructed for ease and safety of operation. The equipment shall have a multiple selection of two or more high-velocity nozzles.The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all pipe sizes to be cleaned. Jet washing equipment will not exceed a maximum pressure of 1800 psi.The equipment shall carry its own water tank. Water for re-filling the tank will be made accessible through existing City owned fire hydrants. U:1Sewer\2011 Sanitary Sewer cleaning RFP-final.docx Gleaning Operation: The equipment shall be capable of removing dirt,grease, rocks, sand, and other materials and obstructions from the sanitary sewer lines and manholes. If cleaning of an entire section cannot be successfully performed from one manhole, the equipment shall be setup on the other manhole and cleaning again attempted. If, again, successful cleaning cannot be performed or the equipment fails to traverse the entire manhole section, it will be assumed that a major blockage exists and the cleaning effort shall be abandoned. Root Removal: Roots shall be removed in the designated sections where root intrusion is a problem at the discretion of the public works director. Any work done to remove roots in a section shall be documented in the report. Discing and rodding equipment may be used for root removal. Documentation shall include the locations in the pipe segment where roots were removed and the procedure that was used. Material Removal: All sludge, dirt, sand,rock, grease, and other solid or semisolid material resulting from the cleaning operation shall be removed at the downstream manhole of the section being cleaned.Passing material from manhole section to manhole section,which could cause line stoppages, accumulations of sand in wet wells, or damage pumping equipment, shall not be permitted. ` 2 11:\Sewer\201 I Sanitary Sewer cleaning RFP-final.doex Disposal of Materials: All solids or semi-solids,debris resulting from the cleaning operations shall be removed from the work area and disposed of properly and is the sole responsibility of the contractor. All materials shall be-removed from the work area no less often than at the end of each workday. Under No circumstances will the Contractor be allowed to accumulate debris, etc.,on the site of work beyond the stated time, except in totally enclosed containers and as approved by the Owner. Water Use: If the Contractor requires water for cleaning operations from hydrants, the Contractor shall make arrangements with the City of Oak Park Heights Public Works Department and shall use only fire hydrants designated by the City. The City shall provide a reasonable amount of water free of charge to the contractor. Final Acceptance: Acceptance of sanitary sewer cleaning shall be made upon the successful completion of the television inspection and shall be to the satisfaction of the Owner. If TV inspection shows the cleaning to be unsatisfactory, the Contractor shall be required to re-clean and re-inspect the sanitary sewer line until the cleaning is shown to be satisfactory. • 3 U:\Sewer\2011 Sanitary Sewer cleaning RFP-final.docx TELEVISING SPECIFICATIONS Intent: All designated pipe sections shall be visually inspected by means of closed-circuit color television (CCTV). All CCTV work shall be conducted in accordance with NASSCO Pipeline Assessment. All inspections shall be done in certified PACP format. Equipment: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. The camera shall be capable of radial view for inspection of the top,bottom, and sides of pipe and for looking up lateral connections. The camera shall be mounted on adjustable skids, or self-propelled, to keep it in the center of the pie. Lighting of the camera shall be supplied by a lamp on the camera, capable of being dimmed or brightened remotely from the control panel. The lighting system shall be capable of lighting the entire periphery of the pipe. The camera,television monitor,and other components of the video system shall be capable of producing a picture quality satisfactory to the City; and if unsatisfactory,the equipment shall be removed and no payment will be made for an unsatisfactory inspection. Televising: The television camera shall be moved through the line in either direction at a uniform rate, stopping when necessary to insure proper documentation of the sanitary sewer pipe condition but in no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches,TV cable, and powered rewinds(or other devices that do not obstruct the camera view or interfere with proper documentation of the sanitary sewer conditions) shall be used to move the camera through the sanitary sewer. If, during the inspection operation the television camera will not pass through the entire sanitary sewer section, 4 UlSewcr120I I Sanitary Sewer cleaning RFP-tiina).doex the Contractor shall re-setup his equipment in a manner so that the inspection can be performed from the opposite manhole. If, again,the camera fails to pass through the entire sanitary sewer section,the inspection shall be considered complete and no additional inspection work will be required. All costs for re-setup due to an obstruction in the sanitary sewer that will not allow the camera to pass shall be considered incidental. If the camera becomes submerged due to a sag in the pipe, a high velocity jet will be utilized to pull water away from the camera lens. Measuring: The location meter, for accurately recording the location of the television camera with respect to the reference manhole, shall be a direct reading, above ground, friction clamp device or other suitable equipment. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. The meter shall be capable of reducing readings for reverse movement of the camera and shall be capable of being manually re-zeroed for each new setup. Footage shall be shown on the video data. Television Inspection Logs: The logs shall be typed or computer printed and acceptable to the Owner. Printed location records shall be kept by the contractor and will clearly show the location, in relation to adjacent manholes, of each infiltration point discovered by the television camera. An estimate of the flow rate of observed infiltration points shall be made and recorded. In addition, other points of significance such as locations of building sanitary sewer laterals, joints,unusual conditions,roots,'sanitary sewer connections, collapsed sections, presence of scale and corrosion, and other discernible features will be recorded and no less than two(2) copies of such records shall be supplied to the Owner. A summary report of all significant findings shall be attached to the typed or computer printed log report. 5 U:1Sewer\2011 Sanitary Sewer cleaning RFP-final.docx Video Recordings: The purpose of recording shall be to supply a visual and audio record of the condition of the lines that may be replayed both daily and at future presentations. DVD recording playback shall be at the same speed that it was recorded. Upon completion of the work, all DVDs recorded during the television inspection shall become the property of the owner. Cost of DVDs shall be included in the unit price bid. A complete recording shall be made of each line televised. A voice recording on DVD shall make brief and informative comments on the sanitary sewer conditions. DVDs shall include the following information: A. Visual (on screen in corner): 1. Report number. 2. Date of television inspection. 3. Sanitary sewer section and number. 4. Current distance along reach (tape counter footage). 5. Printed labels on DVD and case with location information, date, format information, and other descriptive information. 6 U:\Sewer12(111 Sanitary Sewer cleaning RFP-final.docx 1 B. Audio Recording 1. Audio date and time of television inspection, operator name, name of overlying or adjacent street,and manhole numbers. 2. Confirmation of pipe section and television direction in relation to flow. 3. Description of pipe size, type, and pipe joint length. 4. Description and location of each service connection and defect. 5. Type of weather during inspection. • 7 U:1Sewerl201 I Sanitary Sewer cleaning RPP-final.docx Television inspection logs shall include, but are not limited to, the following: • Date, time, city, street, basin, sanitary sewer section,reference manhole number, name of operator, inspector,and weather conditions. • Pipe diameter, pipe material, section length,depth of pipe, length between joints, and corresponding DVD identification. • Location of each point of leakage. • Location of each service connection. • Location of any damaged sections, nature of damage, and location with respect to pipe axis. • Deflection in alignment of grade of pipe. a GIS integration with the City's sanitary sewer shapefile/geodatabase data. Should the DVD's show the inspection to be unsatisfactory; the Contractor shall be required to re-inspect/re-televise the sanitary sewer line at no additional charge. Traffic Control: Contractor is responsible for all traffic control devices, signage and warning lights. In all cases the work shall be conduct so as to minimize, as best as practical, all types of traffic disruption. 8 U:1Sewer12011 Sanitary Sewer cleaning RFA-final.docx Bidder Qualifications:No bids will be accepted other than those submitted by experienced Sewer Televising, Inspection and Cleaning Contractors. Contractors must demonstrate that they, and/or their employees, have been in the business of televising, inspecting and cleaning of sanitary sewers for at least 5 years. Bidder qualifications must accompany bid submittal and will be used to evaluate the bidder's ability to perform the work as required. Laws and Regulations: The contractor shall comply with all Federal,State,County and City laws, ordinances, and regulations affecting the work under this specification. Unless otherwise instructed it shall be the responsibility of the contractor to obtain and preserve all the necessary permits, licenses,or outside agency approvals throughout the duration of the job. Indemnification: The contractor shall defend, indemnify and hold harmless the City of Oak Park Heights, its officers and employees from all suits, actions and claims of any character brought because of injuries or damages received or sustained by any person,persons or property as a result of the operations of the contractor; or on account of or in consequence of any neglect in performing the work; or through the use of unacceptable materials in constructing the work; or because of any act or omission, neglect, or misconduct of the contractor or its subcontractor;or because of any claims arising or amounts recovered from infringements of patents, trademarks, copyrights, or because of any claims arising or amounts recovered under the Workers' Compensation Act, or under any other law, ordinance,order or decree. 9 U;tSewer\2011 Sanitary Sewer cleaning RFP-final.docx T -I Plans and Specifications: Before. B fore submlttmg its bid, the bidder shall carefully examine the entire contents of the specifications so as to be thoroughly familiar with all the requirements. Bidders are instructed to acquaint themselves with all the conditions affecting the work, such as obstacles, right-of-way encroachments and of surface and subsurface geological formations. The successful bidder shall not be allowed any extra compensation by reason of any unforeseen difficulties, of which the bidder could have discovered, by reasonable anticipation prior to the bidding. Before submitting a bid, all bidders must examine existing field conditions, and/or specifications to judge for themselves the difficulties with which may arise in the execution of the work. Inspections: All workmanship and materials are subject to the inspection and approval of the City of Oak Park Heights. If, in the opinion of the City, it is not expedient to correct inadequate workmanship not in compliance with the specifications, the City shall have the right to deduct the difference in value between the workmanship or ans materials supplied and that called for under ppp the specifications. The value shall be determined in accordance with competent cost estimates. Any deductions shall not be construed as a waiver, release or compromise of any other losses, costs, damages or causes of action of the City arising out of such non-complying workmanship. t0 U:1Sewer1201 l Sanitary Sewer cleaning RFP-final.docx Payment: Payment for the work is dependent upon the approval of the Public Works Director. Payments shall be based on the bid unit price per linear foot for the corresponding linear foot of work performed. Measurement of the actual number of feet cleaned and/or televised shall be made from the center of the manhole. Payment will be made upon final completion of yearly work. Quantity: The estimated quantities are given below; however bidders are to note that this may vary to meet actual department demands throughout the contract. For bidding purposes the following estimates are given for a five(5)year period. Sanitary Sewer Cleaning 25,000 linear feet Sanitary Sewer Televising 25,000 linear feet • 11 U:1Sewer\2011 Sanitary Sewer cleaning RFP-final.docx F Bid submittal: Bids will be accepted for furnishing all necessary equipment, materials and labor to perform the televising and cleaning work specified, for a period of five(5)years. Bids shall include: • Linear foot price for performing the sanitary sewer televising work, including GIS integration of reports. • Linear foot price for performing root cutting work • Per hour rate for a complete televising crew, materials and equipment to perform extra assigned work as needed. • Per hour rate for a complete sewer cleaningcrew, materials and equipment to perform extra assigned work as needed. • Including the name and phone number of the owner(s) • Description of equipment to be used and • Resumes not more than one page of key personnel assigned to the work. The City reserves the right to award a contract based on the most advantageous offer,or to the bidder whose bid is deemed in the best interest of the City. 12 U:VSewer\2011 Sanitary Sewer cleaning RFP-6nal.docx Insurance: Prior to any work performed by the contractor or its subcontractors,the contractor shall furnish to the City a certificate of insurance for not less than $1,000,000.00 naming the City as an additional insured party. The City may also direct that copies of the actual insurance policies, or renewals or replacements thereof, be submitted. All premiums for the insurance as specified above to be obtained by the contractor or its subcontractors shall be paid for by the contractor or its subcontractors. Except for intentional or willful acts by the City, the contractor does hereby release the City from any loss or liability incurred by the contractor related to the disposition of the work in the field. 13 U:1Sewer120I I Sanitary Sewer cleaning RFP-final.docx { r Bid Submittal Sheet 2011 Request for Bids- Sanitary Sewer Cleaning and CCTV Before submitting a bid, the bidder shall carefully examine the entire contents of the specifications to be thoroughly familiar with all the requirements. The successful bidder shall not be allowed any extra compensation by reason of any unforeseen difficulties, of which the bidder could have discovered, by reasonable anticipation prior to the bidding. Before submitting a bid, all bidders must examine existing field conditions,and/or specifications to judge for themselves the difficulties with which may arise in the execution of the work. COMPLETE THE FOLLOWING AND RETURN TO ANDY KEGLEY AT THE OAK PARK HEIGHTS CITY HALL NO LATER THAN MAY 18, 2011 Company Name: Your Name &Title: Contact Information: Signature: Notary Public: Year Cleaning Price/ft. CCTV Price/ft. 2011 2012 2013 2014 2015 14 U:1Sewer12011 Sanitary Sewer cleaning RFP-final.docx PIPE SERVICES 16281 Baseline Ave.Shakopee,MN 55379 Phone:952.445.3173 Fax:952.496.9117 QUOTATION May 4,2011 Andy Kegley Public Works Director City of Oak Park Heights • 14168 Oak Park Blvd. Oak Park Heights,MN 55082 Dear Andy; As requested,we have prepared a quote for cleaning and television inspection for approximately 135,000 linear feet of 4"—36"sanitary sewer in the City of Oak Park Heights,Minnesota. The bid is based on approximately 27,000 linear feet per year over 5 years. Our bid includes mobilization. li (See Attached bidform) Additional price schedule is as follows: Jet/ Vacuum cleaning of approximately 27,000 linear feet of sanitary sewer @ .45 per linear foot. $12,150.00 Root cutting 8"— 18"® 210.00 per hour as needed TBD . Color Pan&Tilt TV Inspection&Report of approximately 27,000 linear feet @ .45 per foot. (Includes GIS data base for import) $12,150.00 ' Additional cleaning as required $210. Per hour TBD Additional televising as required @ $210. Per hour TBD Total $24,300.00 Our bid is based on the following provisions and understandings: 1. CONTRACTOR to provide 2 typed reports and DVD's for televised services.All inspections will be done in certified PACP format with an importable data base. Our new reporting system has the ability to provide 4 color stills of major incidents plus a summary report of all"significant findings". 2. CITY understands that if there is any root blockage in lines requiring a reverse set-up during televisingthat the setuPwieconst considered"incidental". Wewill notifyCITY of the problems as they occur. 3. CONTRACTOR to be allowed to draw water from CITY fire hydrants at no additional charge. 4. CONTRACTOR understands that pipe is to be cleaned to 95%per NASSC specifications.Any root cutting required would be billed on a flat hourly rate. CONTRACTOR to notify CITY if any problems occur. 5. CONTRACTOR will be responsible for dumping of debris at METRO. 6. CITY to provide sewer maps and manhole numbering system and to expose and to make accessible all manholes. Acceptance of Proposal The above prices,specifications and conditions are satisfactory and are hereby accepted. Pipe Services Corporation is authorized to do the work as specified. By: City of: Signature: Date: Thank you for the opportunity to work with The City of Oak Park Heights,MN. Please provide us with a bid tab upon completion of your bid review process. Sincerely, Pipe Services Corporation Y ' Kerry L.Blaisdell Pipe Services Corporation Background Keeping our environment safe and clean is a national goal.The infrastructure of a city large or small plays an important roll in achieving that goal.At Pipe Services we are proud of our 28 years of dedicated service to Municipalities, Consulting Engineers,Industry and Contractors.We provide Jet/Vacuum Cleaning,comprehensive Inspections and Rehabilitation services,all delivered to you with experience and a commitment to excellent results.We are headquartered in Shakopee, Minnesota and provide services throughout the entire state as well as Western Wisconsin,and Eastern North and South Dakota. Check out our web site at www.pipe-services.com. Cleaning Services; 2100 Jet/Vacuum Vactor with 2,500-psi water pressure at 90 gallons per minute.The truck has al, 500-gallon water capacity and 13-yard debris box.We have a second 2100 Vactor,which is operated by one of our previous employees,which is available to us on an as-needs basis. Combined Jet/Vacuuming of sanitary and storm sewer lines • Cleaning of clarifiers, lift stations,wet wells and other types of tanks • Root cutting and root treatment up to 18 inch diameter pipes • Large storm pipe cleaning- (36 inch to 108 inch) • Protruding tap cutting • Hydro-excavating • Televising Services; Aries camera truck with 2 pan and tilt single conductor cameras with pull skids for pipes from 6" to 72"and 2,500' of cable. Aries Badger Tractor Truck with pan and tilt camera,capable of televising pipes from 8" - 36"capable. The tractor is capable of driving up to 1,200 feet per set up. Aries Pathfinder Tractor Truck with pan and tilt plus zoom. Capable of televising 6"- 18" pipes and can tractor up to 800 feet per set up. All operators are PACP certified and we use PipeTech software.We also do manhole restoration using the PermaForm system. The combination of the newest in technology along with PACP Certified Operators provides the following; • Strict NASSCO regulated format • Importable database to interface with the Cities GIS software. • Precise data with 133 different incident coding options • Inclination (pipe slope) data • Pan&Tilt Color Cameras for 6" and larger pipes Key Employees Kerry Blaisdell- Owner,toke over business 5 years ago from founder Andy Martin. PACP certified television inspection operator. Joshua Blaisdell-Senior PACP certified television inspection operator as well as cross trained on the Vactor for all cleaning projects. Has been with the company for 5 years. John Wolters- Cleaning field supervisor and Vactor operator. Has been with the company 4 years. • Randy Mohrmann- Cross trained on both the cleaning side as well as the televising side. Has been with the company 28 years. 2010 Completed Sewer Cleaning and Televising Project (Partial list) • City Contact Cleaning Televising Footage Footage Minnetrista, MN Robin Bowman (952) 446-1312 45,061 45,061 Mahtomedi,MN Bob Goebel (651) 773-9730 50,867 50,867 Mendota Heights, MN Rich Burrows (651) 454-4059 571676 57,676 Newport, MN John Neska (651) 459-2475 48,420 Minnetonka, MN Jim Malone (952) 988-8400 98,777 Roseville, MN Tony Thury(651) 792-7053 86,462 Shakopee, MN Mike Hollander (952) 233-9554 75,000 New Brighton, MN Dave Olson (651) 638-2113 102,500 Elk Mound,WI Terry Stamm (715) 379-3728 10,142 10,142 2011 to be completed projects (Partial list) City Contact Cleaning Televising Completion Footage Footage Date Minnetrista,MN Rabin Bowman 50,000 50,000 6/31/11 (952) 446-1312 St. Paul, MN Girma Daka 120,000 120,000 11/30/11 (651) 266-6189 Minnetonka,MN Jim Malone 500,000 12/31/11 (952) 988-8400 Maple Plaine,MN Dennis Nelson 13,000 13,000 4/31/11 (763) 479-0525 Note: We typically do approximately 500,000 feet of annual cleaning projects and approximately 850,000- 1,000,000 feet of televising project.