Loading...
HomeMy WebLinkAboutBP 1975-918 Bank Tunnel System & Canopy /• 5995 v,l.."--- 0 6 �p 0, / i! , ,, (,� ap Atitil { 4..(2/ � Permit No. ` 12' $ 3ryoa (Building) VILLAGE OF OAK PARK HEIGHTS Plan No. (For Dept. use only) TOTAL FEE COLLECTED DOUBLE FEE COLLECTED ACCOUNT ORDINANCE VIOLATION (MARK X IN SQUARE) APPLICATION FOR PERMIT Date 2(5., 19 7S- To: STRUCTURE USED AS REFRG. HANG BUILD PLUMB. HEAT INSTALL ALTER REPAIR REROOF RESIDE MOVE WRECK SIGN MARK Li SQUARES BY X .e' ,-,114440,1 v- e. , Owner rliA.%..- . _ ;gym _' Address /3121., Gam. • ?e .4 r Architect r. t., 0,0 . Address General Contractor "- i Address Contractor Reg. No. --COY 0- "" kJ • NUMBER STREET SIDE BETWEEN WHAT CROSS STREETS _....1.4_, Ctoiti 671440_," LOT BLOCK ADDITION OR TRACT WIDTH DEPTH SIDE LOT CLEARANCE FRONT BUILDING LINE LOT WIDTH LENGTH HEIGHT NO.OF STORIES TYPE OF CONSTRUCTION ESTIMATED VALUE STRUCTURE Y--r CO'�e .-11-044f -1.,--- ,-1, i IDDo YES t:-.,r441174;:393140.6c, DETAILS OR REMARKS: BASEMENT ❑ NO I - 1721 i , V / 1• The derslgned here y m es app Icati# f ape It to do Building Work as herein specified, agreeing to do all work in strict accordance with all ordinances of the Village of Oak Park Il eights. Contractors must register with the village before rme issupsd. r SIGNED BY :0-11,16,16••••L. .4-40--