HomeMy WebLinkAboutFP 2007-00039 Materials & Test Certificate CONTRACTOR'S MATERIAL&TEST CERTIFICATE FOR ABOVEGROUND PIPING
PROCEDURE
Upon Completlon of work,Inspection and tests shall be made by the contractor's representative and witnessed by en owner's representative. All
defects shell be corrected end system left In service before contractor's personnel finally leave the job,
A certifloate shall be filled out end signed by both representatives. Copies shall be prepared for approving authorities,owners and contractor.
It Is understood the owner's representative's signature In no way prejudices any claim against contractor for faulty material,poor workmanship,
or failure to comply with approving authority's requirements or local ordinances.
PROP YNAME DAT
/alt 6040 6-"P/Al S - 22-O
7---
PROP T5 R o'AL 7- it,d Cr. e /?ft4 tin
ACCEPTED SY APPROVIN UTHOR T ('S►NAMES
'j r v`
ADDRESS
PLANS
INSTALLATION CONFORMS TO ACCEPTED PLANS 9'rES 0 NO
EQUIPMENT USED IS APPROVED 9-YES 0 NO
IP NO,EXPLAIN DEVIATIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT SEEN INSTRUCTED AS TO LOCATION ErES 0 NO
OF CONTROL VALVES AND CARE ANO MAINTENANCE OF THIS NEW EQUIPMENT
IF NO,EXPLAIN
INSTRUCTIONS ccOPIEss OFAPRpPR APPROPRIATE
TIONS ANO CARE AND MAINTENANCE CHARTS YES 0 NO
AND HAVE SEENPREMISESIF NO,EXPLAIN
LOFSYS EM ATION surPLl J! }1� /� y� `” 4� �i'�� C
��(`MAKE MODEL YEAR OF ORIFICE QUANTITY TEMPERATURE
MANUFACTURE 8 RATING
SPRINKLERS -rif gfS r 223, , l j� LSz�
`To! itis I 3 3 7oflz(' ( 7. j5, '
PIPE CONFORMS TO ip,C44PArSTANDARD YES ONO
f2�PIPE AND FITTINGS CONFORM TO /jSTANDARD -EVES ONO
PITTINGS IF NO,EXPLAIN
ALARM DEVICE MAXIMUM TIME'IL/OPERATE THROUGH TEST PIPE
AVALVE LARM r TYPE / M-rs� Mint
MIN. R�
OR FLOW ��/ S� I (LII .
INDICATORS re. IA,Slit'
DRY VALVE 00.0.
MAKE. MODEL SERIAL NO. MAKE MODEL SERIAL NO,
TIME TO TRIP WATER AIR TRIP POINT TI E WATER ALARM
THRU TEST PIPE' PRESSURE PRESSURE Al"PRESSURE REACHED OPERATED
TEST OUTLET' PROPERLY
DRY PIPE MIN. SEC. PSI PSI PSI MIN. SEC. YES NO
OPERATING
EST Without
O.O.D.
With
Ay O.O.D.
IF NO,EXPLAIN
•MEASURED FROM TIME INSPECTOR'S TEST PIPE IS OPENED.
SSA IMO) PRINTED IN USA (OVER)
Contractor's Material&Teat Certificate for Aboveground Piping
13-10 SPRINKLER SYSTFMS
OPERATION
❑PNEUMATIC 0 ELECTRIC ❑HYDRAULIC
PIPING SUPERVISED OYES ONO 'DETECTING MEDIA SUPERVISED OYES ONO
DOES VALVE OPERATE FROM THE MANUAL TRIP AND/OR REMOTE CONTROL STATIONS ❑YES ONO
DELUGE 8 IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING IF NO,EXPLAIN
PREACTION ❑YES ❑NO
V L ES
DOES EACH CIRCUIT OPERATE DOES EACHCIRCUIT MAXIMUM TIME TO
MAKE MODEL SUPERVISION ALARM OPERATE VALVE RELEASE OPERATE RELEASE
YES 1 NO YES NO MIN. SEC.
HYDROtSTATIC: Hydrostatic tests shall be mode et not less than 200 psi 113.6 bars)for two hours or 50 psi(3.4 bars)above statie
pressure in excess of 150 psi(10.2 Bert)for two hours. Differential dry.pipe valve clappers shall be left open during test to prevent damage.
All aboveground piping leakage shall be stopped.
TEST FLUSHING: Flow the required rate until water is clear as Indicated by no collection of foreign materiel in burlap bags at outlets such as
DESCRIPTION hydrants and blow-offs. Flush at flows not less then 400 GPM(1514 L/min)for 4•inch pipe 600 GPM(2271 L/min)for 5-Inch pipe,
750 GPM(2839 L/min)for 6-inch pipe,1000 GPM 13785 L/min)for 8-inch pipe,1500 GPM(5678 L/min)for 10-Inch pipe and 2000
GPM(7570 L/min)for 12-Inch pipe. When supply cannot produce stipulated flow rates,obtain maximum available.
PNEUMATIC:Establish 40 psi(2.7 bars)air pressure and measure drop which shall not exceed 1.B psi(0.1 bars)in 24 hours. Test
pressure tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 1.51 psi(0.1 bars)in 24 hours.
ALL PIPING HYDROSTATICALLY TESTED A PSI FOR HRS. IF NO,STATE
DRY PIPING PNEUMATICALLY TESTED � YES 0 NO
EQUIPMENT OPERATES PROPERLY ❑YES 0N
GRAIN READING OF GAGE LOCATE ATER SUPPLY TEST PIPET RESIDUA - :,'„VE WITH VALVE IN TEST PIPE OPEN WIDE
TESTS TEST STATIC PRESSURE: PSI PSI
Underground mains and lead In connections to system risers flushed before connection made to sprinkler piping.
VERIFIED BY COPY OF THE U FORM NO,eSB DYES 0N OTHER EXPLAIN
ks
FLUSHED BY INSTALLER OF UNDER•
GROUND SPRINKLER PIPING OYES ONO
BLANK TESTIWCi
NUMBER USED LOCATIONS NUMBER REMOVED
GASKETS
WELDED PIPING ❑YES
IF YES...
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY
WITH THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR•3 ❑YES ONO
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN
WELDING COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS 010.9,LEVEL AR.3 ❑YES 0 NO
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE
RETRIEVED,THAT OPENINGS IN PIPING ARE SMOOTH.THAT SLAG AND OTHER
WELDING RESIDUE ARE REMOVED,AND THAT THE INTERNAL DIAMETERS OF ❑YES El NO
PIPING ARE NOT PENETRATED
HYDRAULIC NAMEPLATE PROVIDED IF NO,EXPLAIN
DATA ,�/�
NAMEPLATE l�YES 0 NO
DATE LEFT IN SERVICE WITH ALL CON OL VAl.MESDN:
REMARKS {J/L
NAME OF SPRINSOuTRAC� cr!" P -r y_c 11
�(' t tra
,,yy//t1ll TESTS WITNESSED BY //(�/
SIGNATURES FOR ROPERTY OWNER( GNED) TITLE DA E
FOR SPR 40
4S ,TRAC O•SIQNED)�o TITLE ou/LA4 Yfri / DATE ^Z2'0
ADDITIONAL EXPLANA ION AND NOTES ����C(JJ//rJ�J �Al��,�"/
ISA BACK
Contractor's Material&Test Certificate for Aboveground Piping
J