CONTRACTOR'S MATERIAL&TEST CERTIFICATE FOR ABOVEGROUND PIPING
PROCEDURE
Upon completion of work,inspection and tests shell be made by the contractor's representative and witnessed by an owner's representative. All
defects shall be corrected and system left In service before contractor's personnel finally leave the job.
A oertlfl..te shell be filled out and signed by both representatives. Copies shall be prepared for approving authorities,owners and contractor,
It Is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material,poor workmanship,
or failure to comply with approving authority's requirements or local ordinances.
PROP TY NAME DATE
/A/i 6-r-,eavf (7--/I-X-'' fn. s C- 2- O '
PROPERbs O /1 -laf Jo CT e- / i1 r-w #73-
l 3- /KW
ACCEPTED SV APPRza .,UTHORITY('S)NAMES
ADDRESS 7``+7/
PLANS
INSTALLATION CONFORMS TO ACCEPTED PLANS JES 0 NO
EQUIPMENT USED IS APPROVED AYES 0 NO
IF NO,EXPLAIN DEVIATIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT SEEN INSTRUCTED AS TO LOCATION tjLEg ONO
OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT
IF NO,EXPLAIN
INSTRUCTIONS COPIESAPPROPRIATEuu
ANDAVNOFEON INS IRU TIONS AND CARE ANO MAINTENANCE CHARTS GES"ONO
IF NO,EXPLAIN
LOCATION SUIPLI
OF SYSTEM 1ST ^CTA/ I//% frjl_
MAKE MODEL YEAR OF ORIFICE QUANTITY TEMPERATURErvee
RATING grit4 MANUFACT RE SJ[ rRATINGSPRINKLERS ^v 41 S -3 3� ` j� � �+
173 I ( ! S
PIPE CONFORMS TO v STANDARD 3'i' 0 NO
PIPE AND FITTINGS CONFORM TO STANDARDEr 0 NO
FITTINGS IF NO,EXPLAIN
ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST PIPE
ALARM
VALVE91-e
TYPE MAKE MODEL.. MIN, / S
nof___w OW LG�I/ �w!�C 5rt af Dr
INDICATOR
_ Sw "S.-
DRY VALVE O O.0
MAKE. MODEL , SERIAL NO. MAKE MODEL SERIAL NO.
figiniATER
TIME TO TRIP WATER AIR TRIP POINTALARM
REACHED
THRU TEST PIPE- PRESSURE PRESSURE AIR PRESSURE OPERATED
TEST OUTLET' PROPERLY
DRY PIPE MIN. SEC. PSI PSI PSI MIN. SEC. YES NO
OPERA INO
TO Without
�/� O.O.D.
�y 0.
i�+1 O.O.O.
IF NO,EXPLAIN
•MEASURED FROM TIME INSPECTOR'S TEST PIPE IS OPENED.
OSA EQgo) PRINTED IN USA (OVER)
Contractor's Material&Test Certificate for Aboveground Piping
13-10 SPRINKLER SYSTFMS
s_s---
OPERATION
0 PNEUMATIC 0 ELECTRIC 0 HYDRAULIC
PIPING SUPERVISED ❑YES ONO 'DETECTING MEDIA SUPERVISED ❑YES ONO
DOES VALVE OPERATE FROM THE MANUAL TRIP AND/OR REMOTE CONTROL STATIONS OYES ONO
DELUGE& IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING IF NO,EXPLAIN
PREACT N ❑YES ❑NO
VALV $ DOES EACH CIRCUIT OPERATE DOES EACH CIRCUIT MAXIMUM TIME TO
MAKE MODEL SUPERVISION IOSS ALARM OPERATE VALVE RELEASE OPERATE RELEASE
YES NO YES NO MIN. SEC.
HYDROISTATIQ: Hydrostatic tests shall be made at not less then 200 psi(13.6 bars)for two hours or 50 psi(3.4 bars)above static
pressure in excess of 150 psi(10.2 bars)for two hours. Differential dry-pipe valve clappers shall be left open during test to prevent damage.
All aboveground piping leakage shall be stopped.
TEST FLUSHING: Flow the required rate until water is clear as indicated by no collection of foreign materiel in burlap bags at outlets such as
DESCRIPTION hydrants and blow-offs. Flush at flows not less than 400 GPM(1514 L/min)for 4•Inch pipe 600 GPM(2271 L/min)for 5-inch pipe,
750 GPM(2839 L/min)for 6-inch pipe 1000 GPM(3785 L/min)for 8•Inch pipe,1500 GPM(5678 L/min)for 104nch pipe and 2000
GPM(7570 L/min)for 12-inch pipe. When supply cannot produce stipulated flow rates,obtain maximum available.
PNEUMATIC:Establish 40 psi(2.7 bars)air pressure and measure drop which shall not exceed 1-14,psi(0.1 bars)in 24 hours. Test
pressure tanks at normal water level and air pressure and measure air pressure drop which shall not exceed 1•B psi(0.1 bars)in 24 hours.
ALL PIPING HYDROSTATICALLY TESTED AT PSI FOR /RAS. IF NO,STATE REASON
DRY PIPING PNEUMATICALLY TESTED ❑YES ❑NO 1/ Qy'
(?...DEQUIPMENT OPERATES PROPERLY ❑YES ❑NO �1/ /'
DRAIN READING OF GAGE LOCATE R SUPPLY TEST PIPE, RFSIDU E WITH VALVE IN TEST PIPE OPEN WIDE
TESTS TEST STATIC PRESSURE: L ) PSI 1 PSI
Underground mains and lead in connections to system risers flushed before connection made to sprinkler piping.
VERIFIED BY COPY OF THE U FORM NO.11513 OYES ONO OTHER EXPLAIN
FLUSHED BY INSTALLER OF UNDER-
GROUND SPRINKLER PIPING ❑YES ONO
BLANK TESTING NUMBER USED LOCATIONS NUMBER REMOVED
GASKETS
r yf
WELDED PIPING ❑YES (CJNV
IF YES...
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY
WITH THE REQUIREMENTS OF AT LEAST AWS D10.9,LEVEL AR-3 ❑YES ONO
00 YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN
WELDING COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS 010.9,LEVEL AR-3 ❑YES 0 NO
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE
RETRIEVED,THAT OPENINGS IN PIPING ARE SMOOTH,THAT SLAG AND OTHER
WELDING RESIDUE ARE REMOVED,AND THAT THE INTERNAL DIAMETERS OF DYES 0 N
PIPING ARE NOT PENETRATED
HYDRAULIC NAMEPLATE PROVIDED IF NO,EXPLAIN
DATA Oleg-
Is?YES ❑NO
DATE LEFT IN SERVICE WITH ALL CONTROL VALVES 097: '
REMARKS (,/ //
NAME OF SPRINK OTR/�CTOj{, / / F'4 L flp e.L 667 ' 7 t? 5) f/
����((r+((////���r//�`�� TESTS WITNESSED BY C( ••
SIGNATURES FOR PROPERTY OWNER(SIGNED) TIT h DAT
FO•.•/RI/lIu.E11 ONTR OR(SIGNED) TITLE wrviYDAk- --7- �_
ffffss GGii • �^J /U� � /
ADDITIONAL EXPLANATION AND NOTES
ISA BACK
Contractor's Material&Test Certificate for Aboveground Piping