HomeMy WebLinkAboutFP 2007-00042 Material & Test Certificate CONTRACTOR'S MATERIAL&TEST CERTIFICATE FOR ABOVEGROUND PIPING
PROCEDURE
Upon completion of work,Inspection and teats shall be made by the contractor's representative and witnessed by en owner's representative. All
defects shell be corrected end system left In service before contractor's personnel finally leave the lob.
A artifiate shell be filled out and signed by both representatives, Copies shall be prepared for approving authorities,owners end contractor.
It Is understood the owner's representative's signature In no way prejudices any claim against contractor for faulty material,poor workmanship,
or failure to comply with approving authority's requirements or local ordinances,
tv cf( r.� fa 7
PROPERT
/TfE � �� E54-7"7- `I
PROPERTY ADDRt{+f
6 / ��� f�-! ' '—
�-s�-�i�-f f� �T aft � ,`✓
ACCEPTED NY APPROVING AUTHORITYf'S)NAMES
Cl/ 7V
ADDRESS
PLANS
INSTALLATION CONFORMS TO ACCEPTED PLANS etaftS 0 NO
EQUIPMENT USED IS APPROVED GES ONO
IF NO,EXPLAIN DEVIATIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT SEEN INSTRUCTED AS TO LOCATION E;eirrS ONO
OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT
IF NO,EXPLAIN
INSTRUCTIONS C s p u
AAV NEVA ISA SEEN IR.OFT ON PREMIRU TIONS AND CARE AND MAINTENANCE CHARTS 124 0 NO
IF NO,EXPLAIN
LOCATION sUPP IES CLOGS.
OP SYSTEM e(f ri.e4l4. / vc /�/ �►�f�Cy4,f,A,-7"" AK/`o,`f /'w"t
MAKE 1i MODEL"�dicYCEAR OF ORIFICE QUANTITY TEMPERATURE
MANUFACTURE I RATING
- tO "pp azz3� I�� ' /.- t
SPRINKLERS "r-fCO i j'1 3, Ile 2.01e..)".", 2 D 4174' pS
PIPE CONFORMS TO 1y1STANDARD IES ONO
PIPE AND FITTINGS CONFORM TO Al dor STANDARD lanril ONO
FITTINGS IF NO,EXPLAIN
ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST PIPE
ALARM TYPE MAKE MODEL MIN,
VALVE �f
OR PLOW ��— _ Sf�KPAT L!
ar
INDICATOR (r 2FtiS
DRY yALVE 0 0.0.
MAKE. MODEL SERIAL.NO. MAKE MODEL SERIAL NO.
ARM
TIME TO TRIP WATER AIR TRIP POINT ACHED OAPERATED
THRU TEST PIPE' PRESSURE PRESSURE AIR PRESSURE REACHED OPERATED
TEST OUTLET' PROPERLY
DRY PIPE MIN. SEC. PSI PSI PSI MIN, sae. YES NO
OPERATING
TEST Without
+r
0.0.0.
Ih/ Wl.
111 f O.O.D.
IF NO,EXPLAIN
' 'MEASURED FROM TIME INSPECTOR'S TEST PIPE IS OPENED. OVER)
ISA*NO) PRINTED IN USA
Contractor's Material&Test Certificate for Aboveground Piping
13-10 SPRINKLER SYSTFMS
s
OPERATION
0 PNEUMATIC 0 ELECTRIC 0 HYDRAULIC
PIPING SUPERVISED OYES ONO IDETECTING MEDIA SUPERVISED AYES ONO
DOES VALVE OPERATE FROM THE MANUAL TRIP AND/OR REMOTE CONTROL STATIONS ❑YES ONO
DELUGE& IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING IF NO,EXPLAIN
PREACTION ❑YES ONO
VALVES DOES EACH CIRCUIT OPERATE DOES EACH CIRCUIT MAXIMUM TIME TO
li 1 K MAKE MODEL SUPERVISION LEES ALARM VALVE RELEASE OPERATE RELEASE
YES NO YES NO MIN, SEC.
HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi 113.6 bars)for two hours or 50 psi(3.4 bars)above static
pressure in excess of 150 psi(10.2 bars)for two hours. Differential dry-pipe valve clappers shall be left open during test to prevent damage.
All aboveground piping leakage shall be stopped.
TEST FLUSHING: Flow the required rate until water is clear as indicated by no collection of foreign material in burlap bags at outlets such es
DESCRIPTION hydrants end blow-offs. Flush at flows not less than 400 GPM(1514 L/min)for 4-inch pipe 600 GPM 12271 L/min)for 5-inch pipe,
750 GPM(2839 L./min)for 6-inch pipe,1000 GPM(3785 L/min)for 8-inch pipe,1500 GPM(5678 L/min)for 10-inch pipe and 2000
GPM(7570 L/min)for 12-Inchipe. When supply cannot produce stipulated flow rates,obtain maximum available.
PNEUMATIC:Establish 40 psi 12.7 bars)air pressure and measure drop which shall not exceed 134 psi 10.1 bars)in 24 hours. Test
pressure tanks at normal water level and air pressure end measure air pressure drop which shall not exceed 1-%psi(0.1 bars)in 24 hours.
ALL PIPING HYDROSTATICALLY TESTED AT PSI FOR HRS. IF NO,STATE REASON
DRY PIPING PNEUMATICALLY TESTED YES ONO
EQUIPMENT OPERATES PROPERLY YES ONO �•/
DRAIN READING OF GAGE LOCAT SUPPLY TEST PIPE, RESIDU`���- WITH VALVE IN TEST PIPE OPEN WIDE
TESTS TEST STATIC PRESSURE: PSI i� PSI
Underground mains and lead in connections to system risers flushed before connection made to sprinkler piping.
VERIFIED BY COPY OF THE U FORM NO.9SB O YES ONO OTHER EXPLAIN
FLUSHED BY INSTALLER OF UNDER-
GROUND SPRINKLER PIPING OYES ONO
IC TESTING NUMBER USED LOCATIONS NUMBER REMOVED
GASKETS
WELDED PIPING O YES O
IF YES...
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY
WITH THE REQUIREMENTS OF AT LEAST AWS 010.9,LEVEL AR.3 O YES EJ NO
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN
WELDING COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS 010.9,LEVEL AR-3 O YES 0 NO
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE
RETRIEVED,THAT OPENINGS IN PIPING ARE SMOOTH,THAT SLAG AND OTHER
WELDING RESIDUE ARE REMOVED,AND THAT THE INTERNAL DIAMETERS OF ❑YES ONO
PIPING ARE NOT PENETRATED
HYDRAULIC NAMEPLATE PROVIDED IF NO,EXPLAIN
DATA ,�,/'
NAMEPLATE I�JYES ONO
DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN:
REMARKS // 17�4's
NAME OSBPRINKLR
i'Yl EYY1 ( T CONTACTOR rI (i� pr2s/ Cf CT?� &, ---c J 7- I gV o
aTESTS WITNESSED BY
SIGNATURES FOS OPE TY OWNER ISI NED) TITLE i DATE
P- c„,..,3L), I -:-"t`'ik-- 0--s-4- °Mel I 1- -t, st)7
FOR SP I��C^TR TOR jS10 D) ITITLE c Hs/i yAt�/ I DATE 20 07
ADDITIONAL EXPLA TION
AND NOTES 2 tv,
SSA BACK
Contractor's Material&Test Certificate for Aboveground Piping