Loading...
HomeMy WebLinkAbout2008-04-30 NAC Planning ReportPLANNING REPORT TO: Eric Johnson FROM: Scott Richards DATE: April 30, 2008 RE: BACKGROUND NORTHWEST ASSOCIATED CONSULTANTS, INC. FILE NO: 798.02 08.05 ENCLOSURE 3 4800 Olson Memorial Highvvay, Suite 202, Golden Valley, MN 56422 Telephone: 763.231 .2555 Facsimile: 76-3.231 .2561 planners@nacplanning.com Oak Park Heights - Valley Senior Services Alliance (VSSA)/ Presbyterian Homes -- PUD General Plan Review, Preliminary and Final Plat, and Design Standards Review McKean Square Historic Village and 58th Street Tunnel and Parking Allen Black, representing VSSA and Presbyterian Homes, has made application for PUD general plan review, preliminary and final plat, and Design Standards review for the McKean Square Historic Village site and the Boutwells Landing 58 Street tunnel and parking. The proposed general plan is consistent with the concept plan approvals granted by the City Council at their November 22, 2005 meeting, with the condition that allowed for approval to extend through December 31, 2008. The concept approvals in 2005 included the following: ® 106 Unit Care Center ® Historic Village site including school, band shell, and chapel O Memory Care Center, 28 unit • Conservatory connection to existing Town Center i Tunnel under 58 Street to business district General plan approvals for the 100 bed skilled care addition was approved on April 24, 2007. That building is currently under construction. The memory care center and conservatory connection will remain in concept approvals at this time. VSSA and Presbyterian Homes also plans to bring forward concept plans for the development north of 58 Street at a later date. On December 13, 2005, the City Council approved a conditional use permit to move the historic school house onto the Boutwells Landing campus. The general plan for this building will be reviewed as part of the current application for the McKean Square Historic Village. Attached for reference: McKean Square Historic Site Exhibit 1: Exhibit 2: Exhibit 3: Exhibit 4: Exhibit 5: Exhibit 6: Exhibit 7: Exhibit 8: Exhibit 9: Boutwells Landing 58 Street Tunnel and Parking Exhibit 10: Exhibit 11: Exhibit 12: Exhibit 13: Exhibit 14: Exhibit 15: Exhibit 16: Exhibit 17: Exhibit 18: Exhibit 19: Exhibit 20: Exhibit 21: Exhibit 22: Exhibit 23: Exhibit 24: Exhibit 25: ISSUES ANALYSIS Cover Sheet Existing Conditions and Demo Plan Layout Plan Grading Plan Utility Plan Lighting Plan Architectural Plans McKean Square Revised Plan Project Narrative Cover Sheet Existing Conditions and Removal Plan Layout Plan Grading and Utility Plan Tunnel Plan and Profile Traffic Control Plan Traffic Control Details Detail Sheet Detail Sheet Lighting Plan Landscape Plan Tunnel /Elevator Building Elevation Boutwells Landing 2nd Addition Project Narrative Memo from City Arborist Memo from City Engineer Project History /Existing Campus. Ten years ago, Lakeview Hospital recognized a need in the St. Croix Valley for additional older adult housing and services. Three organizations, Presbyterian Homes and Services; Lakeview Hospital; and Croixdale Residence, joined together to form Valley Senior Services Alliance (VSSA), a non-profit organization to meet the needs of older adults in the Valley. The organization envisioned a community that would provide a continuum of care that would meet the needs of older adults as they age in the community where they lived and worked. That vision became Boutwells Landing which now includes: 2 • Fifty -six village homes (side -by -side townhomes), completed in 2000. • Ninety-four assisted living apartments in the Commons building, completed in October 2001 (since July 2004, 29 of these units are dedicated to memory care). • The Gathering at Boutwells Landing, a residential hospice service in the Commons, founded in 2004 in partnership between Lakeview Hospital and Boutwells Landing. • One hundred one units of independent living apartments in the Terrace, completed in February 2002. • A Town Center that links the Commons and the Terrace, and provides convenient services and opportunities for community, both for residents and members of the larger St. Croix valley community. Features include a town hall /chapel, a general g market, cafe, museum, bank, barber /beauty shop, educational classrooms, theater, library, fitness center, two pools, and locker rooms. • A Boutwells bus to transport residents within Boutwells and into town for shopping, medical appointments, and other activities. The bus provides more than 350 rides each month. • Seventy-eight brownstone units (one level independent living homes) six coach y homes (detached single family homes), and 75 additional village homes (side -by- side homes). • A skilled memory care facility, that is now in construction, is located at the north side of the existing Town Center and is to be a total of 106 units. • A 28 unit memory care center, located at the east side of the Town Center, wilt be reviewed for general plan at a later date. Proposed Project. McKean S ware Historic villa e. The historic village includes a local historic school house which is already in place at the site adjacent to Norwich Parkway, a chapel replicating the Second Presbyterian Church of Stillwater, a gazebo, and assorted site p g improvements. The school house will be refurbished and is planned to be utilized as a demonstration site for area school children. The exterior renovation includes replacement of siding, trim, doors, windows, shutters, roofing, foundation strengthening, front stoop and steps, and the addition of a replica of the original bell tower. The interior will also be restored. The chapel and gazebo will be new construction. The chapel will be a wood frame structure with lap siding and asphalt shingles. The buildin g is designed as a chapel and gathering space for special events and will be designed for year round use. The building will contain restrooms that are accessible from the interior and exterior. The gazebo will be utilized as a shaded sitting area as well as band shell for special events. The school house renovation will begin in the Spring of 2008. Construction of the chapel and gazebo is anticipated to occur within the next two years. Boutwells Landing 58 Street Tunnel and Parking. The general plan submittal is for consideration of a new tunnel below 58 Street that will connect the new care center to the undeveloped land north of 58 Street. A new parking lot, with 113 stalls at this time, will be constructed on the undeveloped land north of 58 th Street. 3 The proposed tunnel has been designed with a secured access building which will be for the Boutwells' campus use only. The tunnel will provide access for staff who will park in the proposed parking lot, and residents to cross 58 Street to access the retail shops on the north. There will be both a stairway and an elevator in the access building. The building will be connected to a proposed office /residential building in the future, providing access for residents to professional services, as well as the new business district. Construction on the tunnel would begin after Stillwater High School begins Summer break so not to cause an issue with the traffic associated with the school. The traffic is proposed to be re- routed during construction of the tunnel to provide increased safety and to speed the construction. A stop sign would be placed on 58 Street at both ends of Norwich Parkway, directing traffic onto the detour of Norwich. In addition, advanced warning signs would be placed on 58 Street, describing the temporary traffic change. Comprehensive Plan /Zoning. The area south of 58 Street has been designated for high density use which is consistent with the senior housing campus. The area to the north of 58 Street is designated for business /residential transitional uses. The area will eventually be developed with office space and residential units. The area south of 58 Street has been zoned PUD District. When zoning property as PUD, the City designates an underlying district as the basis for compliance with the ordinance. In that the principal use is a mixture of residential and business use, the appropriate underlying zoning has been designated as R -B, Residential Business Transitional District. Within that district, multiple family dwellings are allowed as a permitted use and nursing homes and similar group housing is allowed as conditional. The area north of 58 Street is zoned B -4, Limited Business District. Although on a separate property, the parking lot, elevator building and tunnel are considered to be accessory to the Boutwells Landing campus. The City anticipates that the area north of 58 Street to be constructed with office space and residential units in the future. This portion of the project will be considered under the PUD general plan of development approvals that tie it to the remainder of the Boutwells Landing project. Subdivision. The applicant has provided a plat of Boutwells Landing 2 Addition for preliminary and final plat review and approval. The plat creates Lots 1 and 2 of Block One of Boutwells Landing 2 Addition from the area that had previously been platted as outlots. The subdivision shall be subject to review and approval by the City Engineer and City Attorney and all requirements easements shall be dedicated. Setbacks. The Zoning Ordinance under the R -B District requires 30 foot front and rear yards and 10 foot side yard setbacks. The school, chapel and gazebo are all set back at least 30 feet from the Norwich Parkway right -of -way and the chapel is 10 feet from the east property line. The B -4 District requires a 40 foot front yard setback, 20 foot rear yard setback, and 10 foot side yard setback. The elevator building for the tunnel is proposed to be set back 4 40 feet from the 58 Street right -of -way. The parking lot is well beyond the 10 foot parking setback requirements. Parking. The parking requirements for each aspect of the Boutwells Landing campus is as follows: Existing Units (Phase 1) Independent Living Elderly Housing — one stall required per unit 91 X 1 = 91 Existing Units (Phase 1) Assisted Living 1 Alzheimer Five spaces plus one for each three beds 101 ÷ 3 + 5 = 39 Existing Units (Phase 1) Town Center Three spaces plus one space for each 200 square feet 27,923-1O%=25,131 � 3 Approved Units (Phase 1 1 1 I n Construction) Care Center - five spaces plus one for each three beds 105- -3 +5= 129 Existing Units (Phase 11 Constructed) Independent Living Elderly Housing — one stall required per unit 78 X 1 = 78 40 Total Requirement for All Main Campus 377 The plans, as currently approved, include a total of 334 standard stalls, 22 accessible stalls, and 14 proof -of- parking stalls for a total of 370 stalls. The previous parking deficit was approved under the PUD in that it was anticipated that additional parking would be constructed with subsequent phases. The tunnel addition would not add any requirements for new parking. North of 58 Street, a 113 stall parking lot would be utilized primarily for staff of Boutwells Landing. By moving staff parking to the new lot, additional parking for residents and visitors in the lot adjacent to the main campus buildings is realized. The school building could accommodate approximately 25 persons, and the chapel 60 persons. At three persons per parking stall, the school would require eight stalls and the chapel 20 stalls. There are 17 stalls, two of which are accessible, in the lot adjacent to the proposed historic village. Additionally, there is significant on-street parking in front of the historic village and parking within the lots at the main campus. Access. Access for the parking lot will be constructed directly across from the new entrance to the main campus on 58 Street. A crosswalk would be placed at this location to access the parking lot and, with a new trail connection, to the shopping area at veal Mart and Lowes. For the historic village, a drop -off would be constructed on Norwich Parkway. Access from the sidewalks in the historic village should be made to the parking lot to the east. 5 Traffic Control Plan. As part of the submittals, the applicant has provided a Traffic Control Plan to address the closing of 58th Street while the tunnel would be constructed. Traffic would be routed on Norwich Parkway while 58 Street is closed. Construction would not begin until Stillwater High School is in Summer break. The Traffic Control Plan is subject to review and approval of the City Engineer. Landscaping. A landscape plan has been submitted for the area north of 58 Street. There are no existing trees that would be impacted by the tunnel construction or the parking lot. The applicant has proposed landscaping the berm along the north side of 58 Street. In that the area will be developed in the future, and the parking lot expanded, this level of landscaping for the area is adequate. As part of the historic village, a significant number of red pine trees would need to be removed. The remaining pines would provide the back drop for the village. The applicant has proposed minimal landscaping for the area in keeping with the historic look that is desired for the area. Staff is in agreement with this concept. The tree removal, tree replacement, and landscape plans are subject to review and approval of the City Arborist. Grading and Drainage. Grading and drainage plans have been submitted for both the historic village and tunnel /parking lot projects. The grading and drainage plans shall be subject to review and approval of the City Engineer and the Browns Creek Watershed District. Utility Plans. The utility plans shall be subject to review and approval of the city Engineer. Sidewalks/Trails. The plans for the area north of 58 Street include a crosswalk from the main campus to the driveway extending to the parking lot and then north to the existing trail between Wal Mart and Lowes. Sidewalk /trail connections for the historic village should be made to the parking lot to the east. Lighting. A lighting plan has been submitted with the location of fixtures for both the tunnel /parking lot and the historic village. The parking tot light fixtures wilt be utilized that includes a tens that complies with City standards. The photometric plans meet all City requirements. Signage. The plans indicate one new site sign to be located at the existing drive on the north side of 58 Street. The sign is in conformance with Zoning Ordinance requirements. The sign would direct employees to the parking lot. Trash Handling. Trash generated from the school house and chapel would be stored within the chapel in a separate room designed as such. 6 Building Design. The elevator building for the tunnel would be constructed as a one story building with face brick and accent bands to match the existing buildings of the main campus. The structure will be constructed with significant glass area for visibility and security. The door to the building and tunnel would be secure with access only by residents and staff. The building would be consistent with Design Standards. The school and chapel structures, as part of the historic village, would be constructed /reconstructed with a historic appearance dating to the time they were first constructed. The buildings would have lap siding and architectural detailing to match the appearance of the original structures. Both structures would have asphalt shingles. The gazebo would be a wood frame structure. Building Height. The building heights of both the chapel and school would be under the 35 foot building height limitation. The tower of the chapel would be 53 feet, four inches in total height. The school house tower would be 34 feet, four inches The Zoning Ordinance allows for building height exceptions, but limits tower elements to 45 feet or no more than five feet of the maximum height of the building, unless granted by conditional use permit. The building height of the chapel tower can be allowed as part of the PUD approvals. CONCLUSION/RECOMMENDATION Based upon the submittals and review herein, City staff recommends approval of the PUD general plan of development, preliminary and final plat and design standards review for the McKean Square Historic Village at 58 Street Tunnel and Parking. The applications are recommended with the following conditions: 1. The PUD general plan of development approvals shall be extended to June 1, 2010. 2. The preliminary /final plat shall be subject to review and approval of the City Engineer and City Attorney. All easements as required by the City Engineer shall be dedicated. 3. The Cit y Engineer approval ineer shall a roval all driveway and crosswalk locations on 58th Street. 4. The City Engineer shall approve the drop off location proposed on Norwich Parkway. 5. Access from the sidewalks in the Historic Village shall be made to the parking lot to the east subject to approval of the City Engineer. 6. The traffic control plan is subject to review and approval of the City Engineer. 7 7. The tree removal, tree replacement and landscape plans are subject to review and approval of the City Arborist. 8. The grading and drainage plans shall be subject to review and approval of the City Engineer, Middle St. Croix Watershed District and Browns Creek Watershed District. 9. The utility plans shall be subject to review and approval of the City Engineer. 10. All newly installed freestanding light fixtures shall include a conforming full cut off lens. A detailed lighting plan for the building light fixtures shall be submitted for City staff approval prior to installation. Alt new light fixtures shall comply with the requirements of the Zoning Ordinance. 11. All signage installed on site shall comply with the requirements of the Zoning Ordinance. 12. The Planning Commission and City Council shall comment on the proposed building materials and architecture of the Historic Village and elevator building for the tunnel. 13. As part of the PUD approvals, the Planning Commission recommends and the City Council approves a conditional use permit allowance for tower elements to not exceed 55 feet in height. 14. The Police Chief and Fire Chief should comment on any safety vehicle access issues of the access points, driveways, or of the general site plans. 15. A development contract amendment, if required, shall be subject to review and approval of the City Attorney. 15. A tunnel easement, to allow placement of a private access under the City right - of -way, shall be executed with the applicant subject to review and approval of the City Engineer and City Attorney. 8 Ti 1 Fi 11 i. 1111111111EINIMINNINIMMI - - ---- 1111111-9- : P I t 0,0 ht -1---- tc/t, 1 111:' '' . '''''. 11 1 MEW= =MEM tot, LI : t7 El • pr. - I 2.172kratd,_ uld 1 F041 , FRI I t.t1 F 0 ,1,0 tit i "M 01A, 00 1: P0: OtN O0 111111 MEL WWI =1:7M11111 1===11 M:=1.11 =2 out- csN 00 1d M I FJ d r ih Le_ .11 P 010 101,1 , Rt trgtONT, g ;Z I no z 4c,x II =PM IMEEEM WEIVM IIMMEM Of • 2,11.4 ezo,z LzoLz V0t, ati 090t 501,4 LHi 1111111111EINIMINNINIMMI - - ---- 1111111-9- : P I t 0,0 ht -1---- tc/t, °000, - . 11 1 MEW= =MEM tot, 0 •itt/ Fl _ F • F El • pr. - I 2.172kratd,_ uld 1 F041 , FRI I t.t1 . 1' • rn.t t ti I FJ LL.r ZLCILZ MIME 5 • Z 11112 iff0a NM= UM= 0 M7ITIM c.. Z00 0Z 574L I I 01, 1011111111111 11111111111111 : P I t 0,0 ht MEM .r4r.a 1.44,, MIMS . _ a mom. 11 C‘i 7,1 LU Lu _ 0 (0 (0 (0 (0 1,r,Oft MO, '0,11/ rfn LIMB ,,,Z1 'SDISBH )18Vd NVO DD 3 ins - mw A1 N 3 ovum 01801SIH s113minog afft,11,,C.61 SVg01-1 NVl3IAS31d NVld ON30 SNO11101103 9NIISIX1 3,41 ro 0 ) 0 0 0 0 (i) CL Cr 0 Q L . 4.111 0 °Ir' 0, --- IN31413SV3 Ainun ONV 301/AliVela ,g MOVELOS 0NI071178 OL . v ; • ,-,.. g0/6.2450 `ON 3SNOOti Ann Av... :MVO 1 L eoiso/ra tuft, t .7, Eirirdit 1,9, ..I.7 wi'0}1131 liliott units los SKI Et ISS Nil inVd IS out "3AV 31 'N Strn NW `SIH91DH Y1UVd WO 39 3D:10191H s. JO E 133 0 1 4.. _ , ON111.4./Inka 01417,mtns D.K.Nr., atrn ' 'IAA .3.35 S.81,450 SOH NVIHRLAS3Hd odawanammo 1.1.08a NVId i.noAvi §fferi 8.314s ;_ _ . --I--- ,L11 ro 0 ) 0 0 0 0 (i) CL Cr 0 Q L . 4.111 0 °Ir' 0, --- IN31413SV3 Ainun ONV 301/AliVela ,g MOVELOS 0NI071178 OL q - _-,?---- - _:-....., .4. , ,' _ ----___ .,,, 0) OS C, / )0 -.. ,,// , ,J - 0) 'I //46 '',.(/ //,' ',/ C.', - 4----- •,--/. / / ,‘ CP N / A,1 ‘,/ • ,_,-. ,,,,-,,, „, ,/ / Cb 45- : . , irx 'C' `<s L -\>> / / / q ,,---- 1 6 C, , . i C, 0 wo E IL 1 fr3 0 00 0 00 0)- cr, 1 4_ - cci \ 74; r ( N, EXISTING 2-FT CONTOUR EXISTING PAVEMENT . 1 • VIVA: 0001 FV16.21,0 35N3011 I N'A :31Va 1 211.—RO wsco .....`,..". -..,... 1.10 VES4, friel 311 1HS 'N SPElZ N IN 'S.LHOIBH >11:11/ci WO 39V111A ONOISR-1 smaminos .Tr 1,3rOtld e laaH, E ...00‘ SAIA101-1 NVIH31ASS3Hcl 1 1 1 L am NIEl i cll is DN1 NV Id oNiovele NM( 13. ill ,111 q - _-,?---- - _:-....., .4. , ,' _ ----___ .,,, 0) OS C, / )0 -.. ,,// , ,J - 0) 'I //46 '',.(/ //,' ',/ C.', - 4----- •,--/. / / ,‘ CP N / A,1 ‘,/ • ,_,-. ,,,,-,,, „, ,/ / Cb 45- : . , irx 'C' `<s L -\>> / / / q ,,---- 1 6 C, , . i C, 0 wo E IL 1 fr3 0 00 0 00 0)- cr, 1 4_ - cci \ 74; r ( N, EXISTING 2-FT CONTOUR EXISTING PAVEMENT LCD / s._ / I / \/ / N / >--, ---- / - -- ----------' - — / ----\------.' ,/' - , „ , - -------, 1;<- , :, , /0- N ' , r . ',_.-.--- Cr / * / 0 / r ' ./ r>,-, • , ---", it'' —1--, -Y --- / > U.1 ra ua (.3 U1 (.0 ›- L_ Z. 1 e • G V - UTILITY PLAN EXISTING SANITARY SEWER ER SEFWICE (4' DI L '' ' ' .: ST/24 NO5101N3 000.1. 040/69 'ON .19,11 ,Yi "..,... 9L—eo Iff6 1.09 :Cie./159i .,I .....,,,,, .0. DITIliii0,1113111.q iqZ1 E 1.59 N1,1'1(1Vd IS OM auns "3AV gNITIVIA 'N son NV S11-10131-1 .IHNicl >IVO 39V ONOISIF-1 s,iisminoe 31 MK. 33mc - -- j - - - ....v...... SaN01-1 NVI`claLA9S9el H --1 --- . 1 1 - 0,.....). ',111,1311S 114. N\ A11 LCD / s._ / I / \/ / N / >--, ---- / - -- ----------' - — / ----\------.' ,/' - , „ , - -------, 1;<- , :, , /0- N ' , r . ',_.-.--- Cr / * / 0 / r ' ./ r>,-, • , ---", it'' —1--, -Y --- / > U.1 ra ua (.3 U1 (.0 ›- L_ Z. 1 e • G V - UTILITY PLAN EXISTING SANITARY SEWER ER SEFWICE (4' DI ,, . , , I — -1-- - I - .... ,._ .,•,-. •=-, wit. I NOS,IO. Oa0J. P0/49/;49 'ON 3...11 - . 7,57.ordsid LL-9O so/60,0 w.f. ' ECi.t., i....0L'ilZ11,11111.0N.L.U1.1.55117.1 c I. Lcg NA - inva IS 3N111 'N 91 Nn 'S.1.1-1013H NUtft:1 >IVO ADVTIIA 3.180.LSIIA ar -H- - 1 -I .. 1 --1- I ----------- ---------- -I ..12UMVIS , 9,11.V arvi SS.. SIINMO SOH NVNDIASSAHcl .34011,30,3.0 .1Y}11.0tIer NV1d ONI1Hell 31,4ti M. -Dui , uo,,ppg .0 y...,T . a 7 7 A 2 1 / / / ,/ //. 1.1 , / -.-,\ / f, i , g - \ C, .. \ g . ..A. ..g 6 . 2; CS Ili -__.1 (.0 1 -•Li 0 Ci-• H 2:i g Q...„ ,2 g , • - 2 g 0 t. (-) cl__ 6 LIGHTING PLAN OSED 20' HIGH LIGHTPOLE LUMINAIRE LEVELS V • L).J fl [.... • 1 1 I d -CI • 1 - 7171 -Q) r 7= i a 4 , d -AL nf H IF 1111 j, uJ 6 = 0 !I ,-,, - ,e!).,,,,,,..1,..,i.'),.' ir ._ V \ -. " , ...J 11 ,' l '-' , :- ° .) 11 „ \' '-,,-,.! 11 II 0 \ i\ N . !I ii -, F ; ---- •-- '''' 4 0 11\. • 11 ' 6- ''','-', ■ , II \ L CO < [......,,, • 1 \ i''''' 1 '-:..: \,, , , 11 \ • --- ) — • i 1 - -3 - ='• '-_,. , :. i , \ 1,_ 1 1 lal \ c ,-_-, 1 -,)-- 1 ---, \ ,. (-,, 11,- ,.:. c \ L( . .--- - , I --‹ \_p- .`''''' 1 , -- ----! -- -- — '''''' '' .) \ .__ , _) 7,..c_...J4,-21..., .... ,.,..7,a_,_._ ,,,, ..........._._.......„. ,•,-S1 , '.' ' _12-„,-,- ki \ ' ' ' ' -- - , •71.i5 - . -.,, . - .1 - ; - " " '--- Ce) _\ ,,__,LL ,, ,: i ,- .4\ ..\ , - ,.:'t:7TA- - f-: c , , \ ' .._.-4 -:' ',..;,-: '---;;;,-- ...,5. ,r ' c , 1 ,,, •(,) •,,,,,. -05 '..,'-::,•', •, --: (2) -,, ,-.. ...e, \ ''''.- \ ''' C_I ''''',.• ';‘, 4 ,' "' ' '' '' ■,. ‘. ; i',4 ' '5,,,,,,,:j.s.r ' \--- 1.--) : ( 1) •'..., , -.....,..... , L ._.. , ' - ••• --„, , Pc:/e,Q,' , ' ,:- . ( ) - ) .--- -- < C .4, ,.., _P...,,, .. • 1 (....) , c -I- I 1.1„c 0,13,7,.601.1 I n _ r - riri \_ v 1 V 1 V t1 - I 1 \,,,,, 1 , __ t 0 4•• April 23, 2008 Amendment to April 10, 2008, Submittal for Presbyterian Homes 1 VSSA McKean Square Historic Village General Plan Submittal Discription Presbyterian Homes is pleased to submit the enclosed application for the Boutwell's McKean Square Historic Village. The general plan being submitted is consistent with the concept plan previously approved by the city. The Historic Village includes a local historic school house which is already in place at the site, a chapel replicating the 2nd Presbyterian Church of Stillwater, a gazebo, and associated site improvements. The school house currently on site will be refurbished and is planned to be utilized as a demonstration site for area school children. The exterior renovation of the building includes repair and replacement of existing lap siding, exterior trim, doors, windows and shutters; replacement of roof sheathing and asphalt shingles; cultured stone foundation to resemble original stone foundation; addition of front stoop and steps; and the addition of the bell tower to replicate the original building bell tower. Interior renovation includes repair and/or replacement of existing plaster walls and ceiling; repair and refinishing of existing floor; new floor, wall and ceiling insulation; reinforcement of existing roof structure where deteriorated; and a new furnace with heating and air conditioning located in the crawl space or attic. The proposed chapel and gazebo will be new construction. The chapel is modeled after the original 2nd Presbyterian Church of Stillwater built in the mid 1800's. It will be a wood frame structure with lap siding and asphalt shingles. The building is designed as a chapel and gathering space for special events, and is designed for year around use (I{VAC equipment located within the building). This building will contain rest rooms that are accessible from the interior and exterior so they will be available for use by visitors to the school and site even when the chapel is not in use. The gazebo . will be utilized as a shaded sitting area for Boutwell and area residents, as well as a `bandstand' for special events. Renovation of the school house is beginning this spring with the help of AN construction and resident volunteers. Site work preparation and improvements will also begin this spring. Construction is anticipated to occur within the next two years for the chapel and gazebo rXHf&IT 9 2 " H: .-ki ., I-- - -- - - • . . I I • _1 II :[ •11-4 ..--, I r., . , - , _ :: '-'' , ... . ,- , .■ - .• ' ..._'., - ,;.-• , -. • . NO5,01113 V COOL 'ON 35.311 n rn ;,, T4 ...... -- . I LIA—eo itt.,71;97:3 7 7It ',i X14 Ur 1-111.10N AIL Ill, WEI E I- 1,9 NM - Invd 'IS 00 4 3 ins "3AV 3N11VWVH 'N SPOZ MINIEN NV 'S.L.H0131-i ).17:1V,3 MVO - 121,1 NI ri_t_ s. AAk 1109 WiN is ti J,Ks L'LD - - : • ' - - - -: - - : I ail TA4IDIAg]Ncl SOH NVI SI5Vairaiiii5 M N IYA0 M1 GNY SNallaNO3 ONIISIX1 1.4 1.15 ',LI/ . 1-10S51,-ta q-21,11.1aa..14 , 0 Af0.75.94 t9a g 62‘79 , K , r (2 'I !EL OP1! - • MING CONDITIONS & ''EMOVAL PLAN MILL & OVERLAY PAVEMENT >r< § I L _ 144. 1.1.1.1Mins ,INNYWNYI ZilSS U113 '1I111061133,11$ HISS sf111 NV1 ' - IS 00 311,1S 'EAV 9N111.4-1 N 9t EIMMIEWI SM01-1 NVIIBIAEISRld mraaar NV 4 `S11-10131A A6Vd ?IVO S. .011 NV1d 1110AV1 wirrig ELl ' il ., 1-/ ; . .3 . ' , . ' , Fi 6Vi 7 'Ohl 35,42311 A rA alYO L.E. t —90 �r ao << / lit6 Utilt,(54,..14 7t0ii N11'01111 DM 'MIMI-IRIS 1115 3,111 E L 1S5 NW 'invd 'IS 001, auns "3AV 3N111 'N 508Z 30137JKIFAC NA "SIHOI3H Yibkid MVO - ID NN fli S. AA_L 110E7 verti moll LL JOil.CS , — 1 . -I t ON113,1 NI ON3 ONL13.M1 lir IS ONIENNYld &INCH NV11131.A8S3A4 311:1740,1711W5 1111,1 UM (LINV 1ONNO) MN 'WM Irmi MK _ . —[— -- -- 'T __. r - a - ---- - - 1---- -atn "riosnolia ..mni.i....g, ' o 7„giarOJOY 079 _ . i Era I 4Z:VJON AL/Si 17 7- _ - • 4 ) c . 0 / / 4ki / / 4 ,' .7 , 9 EROSION CONTROL & LITT ITY PLAN E ELEVATIONS UNLESS NOTED OTHERWISE UTILITY NOTES 3) SPOT ELEVATIONS ARE P,LL G PROPOS. FINISHED GRADE CONTOUR NEEDED AND AS REOUESTED BY EXISTING SPO7 ELEVATION G TREES TO REMAIN 1 • j1 11.0 1,c6,0 {1.19} aso MS Nil DIV1 . 111110.133111S BILE, SW I ONCIMMONA 9h11321Er,.1S ,..NNV'tet .uo•s3p,sa .utetti. A 'zio ; CUSS NW 1111,1 IS OOL inns IAY 3N11INVil N SV9Z trinw SOH NV11111A9S3Nif 31110&I 7 R Mild ENNA SSS 31,S11 ale w z 1 co X w NW 511-013H )111Vd TWO 11Nar\int s,Tervunou >1,,19 CIV. 55.5. . 0 Q ■ ' " - `.< , ... ZIg ' = . . 0 1 ....ti..... Awn«. 1114101.11A1 fUtf170.11..1 tlellfg MUM =PI MEMO OM t ,1.91 MI •111dzi 'IS 00i auns -a* 3N1111114 'Ha 530/01-1 NVIMASSINd MI Si/4MM NtlYd WO larqNnA. 13.-naminoe NVid 101111403 DI1Y111 TS ---- n ........ fligUA*11 ottestinttor 1.44 ..., suor,p, "tr....AA 'rpm id I 9 A 3 101 5 I Ill 1 3 I vi 11 jN:JIj Jx41 a -4 0 0 9 Mr 9 TR_AFFIC CONTROL PLAN - 1 - - --I — - p , r- Z - r- � C3 "° '" ., i i.Ni l' OlilliM111u1 10,113311zs31LScsl71 €L L5S N N 'lflVd IS Oo l 3Ilfls ' 3AV 3NI1V111/H 'N 5b13 NGV ^ S1H`JI H )18,1 )1VO 13 N N fl1 S.`1�1 AM 1 fl08 r ® v -, - — — • :?ti'1 Nil a ., a ' ' ON , � e� � `� 1 W jj S] 1OH NVIN31A S3 )1d TOTYKINK S1IV1]G 1Q�1NO3 J1iV )11 7..M3 -,u/ ,OS,13,3 quaxuaaz3 `CIO z 1:x'2 0 0 0 U Q ,. . . .. ._., - . , . . . ., . ' .. . ' 1,05.1,3 V Gaol 1 ON ,5N5D11 GIA ec/777 [11, zNii . 01113 lin 11.11301:111,1.1, KIM , I EL LS5 NI 4 - 11,Vri IS 001- Dins - E3AV 9NIIINVIA 'N g1 ,Tryoromz NiN '511-101 31,1Vd WO — 1 1 - 3 N IN FYI S. nos . ,TOTO V LLD •,,,....,,,10,1 ...3t ..:. 0.i.wHils ,, •,, If ":.' STAI01-1 NVIII]lAOSAAci IA=-3?-S 1 k/1--1C1 -Du/ ‘tios, .1...n.u,.....i ,4,,,,x 1, .9 ,11., • 0 C ff.t EL • • ( z 0 L:5 'ALK SECTION ,ONCRETE - ; . '. --- '. - , . . . . .. . ... ON iSteD11 NOS.W. V L10.01 A , RC/Ltho 411. .. N.', Eii.,:it .II . IIIKON Mil, Ith, St. 'inva IS DOI Duns ' DNI - 11 t NV d S11-i91-31-1 M8Vci MVO - I Nr\lii1 5,1 [ 4 20,22,, D 'did i�iiS SMOH NVIAILAO9Ad ,....,,,,,, oNoiToNioNa 1 1 (INV% o 1 -- HV_L3C1 ...,,,,,-,,...i.,..,..., , z, tfl 2 0 Ox, 0 1 z z 0 , •• • • D,E3 CONCRETE TUNNct ,i ,_ ; • I , —1 , • , . - ei, I , Nosnra V CIO. I ,6 3514011 COMO A r A :141.51t L L L —s unIctIto ...,•,.,■•-- -' 11.5 ...151,6tHls9} nom ttOSSNYt'aii13 DM "IWKALIMILLS HISS SigE 1 Ct,1.99 NI, invd 'IS an 31.ff "DAV 3N11110/1-1 'N SPOZ sstsith 5.171N. MN 'SIH011aFt >INVd )NO 1N Niik S.11-3AA_L(100 lreM 1,,1011 1:1-3 araul.no xi g DNIAR.A. IS ,thiVria UN, 144. S30/0I NVIMILAUS-Tdd WOMOM2N NV Di\illi-r3111 iriWID1 " DI, 'llos, ' gzi F7 A2:7010A1 • Atisic/roiv og '421 3 ; .2 ; ; • ; ; ; 2 ; < A 3 A A ., • 4-'4:1 ; 2 2 ; ; ; ; ; 2 2 2 2 -- ; A ; ; 2 ; :31 „ ■ --+ ' 1 . t F- -1 t- - - -1.- , _. 1-- ! • , " , . ,,,. ' Nosom v ca.' 6 'ON 35N3Dii =CIO I UIVCI I MOM. L L L-90 nro/to li#6 09{119) ,if. [1191.,1 i4OSS X11'01113E, '111110,113320 ill. 5.1 £ L .5 N. Invd . 1S 001, 316ns 3AV 3N11INVI-1 N St WIIVWCIIWO N. ' SIN DID >ttblVci MVO - la N IN ni_. S1111 0 9 warozu JO 01 13,.. 1:1,1 9N11133NION1 1 , ,T,T riN.L;':-;' , , I aia. SOH NV11131A9S3licl totiaa NV1c1 ]dVDSCINV1 wok ims E=Zi CID a 9 TREE PLANTING SCHEDULE PROPERTY BOUNDARY INSULATING GLASS IN ANODIZED ALUMINUM FRAME. EAST ELEVATION WEST ELEVATION TUNNEL ACCESS BLDG 1/Er = ASPHALT SHIN5LE5 RAKE DETAI TO MATCH EXISTING BUILDING -- FACE BRICK TO MATCH MAIN BUILDING ACCENT BAND 0 TUNNEL ACCESS HOUSE PLAN 1/4 = NORTH ELEVATION SOUTH ELEVATION GROUND LEVEL PLAN 'MEL LEVEL PLAN EXHIBIT 2 1 o q2.1 0 w w 1 g 1 1 1 11 �a : 111 i i hi 1 Jii tif 1 1 1 11' z K K ? rrr it; ya L w . • +Y 067t 4 Saor�rrd d'IY Cii ; i i, PAON: .644; Agar PA (I) s ; [I3 1 C) �- 1 oeQt K t J � =7 Ca 3 r r i 7 r 2 8 e+ , i u n J () «j JJ -D (_ April 23, 2008 EXHIBIT 2 3 Amendment to April 10, 2008, Submittal for Presbyterian Homes 1 VSSA Boutwell's Landing 58 Street Tunnel and Parking General Plan Submittal Description Presbyterian Homes is pleased to present the enclosed application for the Boutwell's Campus. This general plan submittal is for the construction of a new tunnel below 58 street that will connect from the new Boutwells Landing Care Center to the undeveloped land north of 5 Stn Street, and a new parking lot p p g north of 58 Street for Boutwells Landing and Presbyterian Homes staff. The new parking lot is for 80 -100 cars, and will be expanded as the north property develops in the future. The proposed tunnel has been designed with a secured access building which will be for the Boutwell's campus use only. The tunnel will provide access for staff who will park in the proposed parking lot, and residents to cross 58 Street to access the retail shops on the north. There will be both a stairway and an p � elevator in the access building. The building will be connected to a proposed office /residential building in the future, providing access for residents to professional services as well as the new business district. Construction on the tunnel would begin after Stillwater High School begins summer break so not to cause an issue with the traffic associated with the school. The traffic is proposed to be re- routed during construction of the tunnel to provide increased safety and to speed the construction. A stop sign would be placed at on 58 Street at both ends of Norwich Parkway, directing traffic onto the detour of Norwich. In addition, advanced warning signs would be placed on 58 Street describing the temporary traffic change. 2 Julie Hultman From: Sent: To: Subject: OPH Staff - I have reviewed the revised tree removal plan for the Boutwell's Landing and McKean Square Historic Site. The pines have been tagged and a list generated of trees which will be removed and those which will remain. Twenty -two trees, mostly Scots pine, will be removed. The diameter inches removed approximately equal the surplus diameter inches planted for the previous projects (280), so no tree replacement will be required. No landscape plan for this area has been submitted. Indications are that landscaping will be kept to a minimum, as would befit a replica historic site. At the site review meeting, there was some discussion by the developer of possibly putting in "boulevard" trees which may come from the Kiefer property in Baytown Township. Any trees planted along the street should be planted on private property. These trees should also be "landscape" grade trees of good form and structure. I would like to inspect any trees to be moved to be sure that the trees are healthy and of good form (many of the trees previously moved from that property to Boutwell's Landing and McKean Square are "park" grade trees of poor form and and structure. Trees with poor form will be more prone to storm damage and failure in the future. Please forward my comments to the developer. Contact me if you have any questions regarding this review. Kathy Widin Arborist City of Oak Park Heights K.D. Widin [kdwidin@comcast.net] net] Wednesday, April 30, 2008 3:17 PM Eric Johnson; Mark Vierling (E- mail); Dennis Pastier (E- mail); Scott Richards; Jimmy Butler; Judy Hoist; Julie Hultman; Tom Ozzello Boutwell's Landing Historic Site Tree Removal /Replacement 1 EXHIBIT 2 4 Julie Hultman From: Sent: To: Subject: O P H Staff Kathy Widin Arborist City of Oak Park Heights K.D. Widin [kdwidin a@comcast. net] Thursday, May 01, 2008 7:44 AM Eric Johnson; Mark Vierling (E- mail); Dennis Pastier (E- mail); Scott Richards; Jimmy Butler; Judy Hoist; Julie Hultman; Tom Ozzello Boutwell's Tunnel Landscape Plan 1 have reviewed the landscape plan for the proposed " Boutwell's Tunnel" from Boutwell's Landing, under 58th St., to a parking lot proposed for the N side of 58th St.. 1. The landscape plan is acceptable and appropriate for the type of project. 2. The tree species proposed are acceptable, except for Colorado blue spruce (Picea pungens). Due to the disease problems experienced with this species, Norway spruce or Fraser fir should be substituted. 3. Tree sizes are appropriate. 4. No tree replacement, beyond the landscape plan, is required. 5. A "Planting Detail ", which shows how trees are to be planted, should accompany the landscape plan. Please contact me if you have any questions regarding this review. 1 Julie Hultman From: Eric Johnson Sent: Thursday, May 01, 2008 2:15 PM To: Julie Hultman Subject: FW: Tunnel Easement Description and Exhibit Attachments: Tunnel Easement Exhibit.pdf; Tunnel Easement Description.pdf From Pastier, Dennis M [mailto:Dennis.Postler@bonestroo.com] Sent: Thursday, May 01, 2008 11:43 AM To Mark Vierling; Eric Johnson Cc: Erickson, Karen 5 Subject: FW: Tunnel Easement Description and Exhibit Mark & Eric: Comments specific to the Easement exhibit and description: e In the first sentence of the description, add "for private pedestrian tunnel purposes" (or words to that effect) between "width" and "over" [i.e. A strip of land 52.00 feet in width for private pedestrian tunnel purposes over, O The City may want to give consideration to including a vertical element for the easement description to limit the easement to a certain distance above and below the tunnel limits also. Preliminary comments related to the Tunnel design: ® Due to the tunnel length, it will (obviously) require lighting, Should also have security cameras. • Mechanical System with air exchangers will be necessary due to being a closed system. O At only 8' high in the center (and 6 - 7' high along the edges) the tunnel may feel confining to users. ® A code compliance review for Life safety should be completed by the designer. A The system must be designed to be water tight. O We will need to see design drawings, structural calculations and a geotechnical report addressing the items noted above. We will reiterate these comments in our formal plan review (of the recently submitted plans) that will be sent out this week. Preliminary comments related to a Development Agreement or Letter of Credit: O We can/will determine a dollar value for the tunnel improvements within the public right-of-way, as well as the street, utility & boulevard restoration items required, once we get a preliminary estimate numbers from FFE. If they are needed in a more expeditious time frame, we can estimate costs ourselves. Thanks much. Dennis M. Pastier, PE Principal Tel 651 -604 -4815 dennis.postler@bonestroo.com 5/1/2008 Bonestroo Page 1 of 1 EXHIBIT 2 5 FoIz,Freeman, Erickson, Inc. E April 21, 2008 LAND PLANNING 4 SURVEYING 4 ENGINEERING PROPOSED EASEMENT DESCRIPTION A strip of land 52.00 feet in width over, under, and across a part of 58 Street North, as shown and dedicated on the plat of BOUTWELLS LANDING, according to the plat thereof on file and of record in the Office of the Registrar of Titles, Washington County, Minnesota. The centerline of said strip of land being described as follows: Commencing at the northeast corner of Tract A, REGISTERED LAND SURVEY No. 125, according to the survey thereof on file and of record in the Office of the Registrar of Titles, Washington County, Minnesota; thence North 89 degrees 26 minutes 54 seconds West, bearings oriented to said REGISTERED LAND SURVEY, along the north line of said Tract A, a distance of 344.75 feet; thence northwesterly, continuing along said north line, .a distance of 26.45 feet along a tangential curve concave to the northeast having a radius of 550.00 feet and a central angle of 02 degrees 45 minutes 20 seconds to the point of beginning of the centerline to be described; thence North 00 degrees 00 minutes 00 seconds East, along said centerline, a distance of 80.16 feet to the south line of Outlot C, OAK PARK COMMONS, according to the plat thereof on file and of record in the Office of the Registrar of Titles, Washington County, Minnesota, and said centerline there terminating. 1 hereby certify that this legal description was prepared by me, or under my direct supervision, and that 1 am a duly Licensed Land Surveyor under the laws of the State of Minnesota. Timothy ' ee an Minnesota Acense N . 16989 04 -21 -2008 Date 12445 5 Street North, Lake Elmo, MN 55042 + Phone: (651) 439-8833 Fax: (651) 430-9331 4 We&fte: w w.f e- inc,com &uce A. Fab LS Timodiy Principal . Fryman, LS Todd A. Erickson, FE 1939 - 2011 F � 1 Y�����; �� &�