HomeMy WebLinkAbout2016-07-14 Stantec Drainage ReviewStantec Consulting Services Inc.
2335 Highway 36 West
St. Paul MN 55113
Tel: (651) 636-4600
Fax: (651) 636-1311
July 14, 2016
Mr. Eric Johnson, Administrator
City of Oak Park Heights
14168 Oak Park Blvd. N., P.O. Box 2007
Oak Park Heights, MN 55082-2007
Reference: Xcel Baytown Substation – Drainage Review
Dear Eric,
We have performed a review of stormwater calculations and drainage structures for the proposed
Xcel Baytown Substation improvements. Following are our comments and recommendations:
1. A drainage map that includes drainage boundaries to verify the drainage areas should be
submitted as part of the Stormwater Drainage Calculations.
2. Due to the site being located within the City’s DWSMA, and in particular, the 1-yr travel
time emergency response area, infiltration is not allowed on this site based on
requirements of the NPDES Construction Permit.
3. Rate Control: The site currently drains into an existing private storm sewer structure
adjacent to the site. Because of this, proposed flow rates need to be maintained at or below
existing rates in order to prevent the site negatively impacting the adjacent property. The
proposed flow rates leaving the site are indicated as less than existing flow rates at the
outfall of the stormwater pond and meet the rate control requirement. However, this is
partially achieved by infiltrating part of the water in bioretention basins and sediment
forebay, which is not allowed (see comment 2).
4. Water Quality: The site will be required to meet the MSCWMO standards for water quality.
Filtration is allowed as long as the design prohibits infiltration.
5. Volume Control: The site is not required to achieve volume control due to no infiltration
being allowed on site (see comment 2).
6. Emergency overflows should be noted on the plans.
7. Erosion control materials should be used in places where higher velocities are expected
due to restricted flows or steep grades.
Mr. Eric Johnson
Page 2 of 2
Reference: Xcel Baytown Substation – Drainage Review
If you have any questions or require further information, please do not hesitate to contact me.
Regards,
STANTEC CONSULTING SERVICES INC.
Lee M. Mann, P.E.
City Engineer
Phone: 651-604-4850
lee.mann@stantec.com
cc: Andy Kegley, Public Works Director
Julie Hultman, Building Official
Scott Richards, City Planner
Mark Vierling, City Attorney
Lisa Danielson, City Arborist