Loading...
HomeMy WebLinkAbout2016-09-08 Stantec Plan & Drainage Review Letter Stantec Consulting Services Inc. 2335 Highway 36 West St. Paul MN 55113 c) Stantec Tel (651) 636-4600 Fax: (651) 636-1311 September 8, 2016 Mr. Eric Johnson,Administrator City of Oak Park Heights 14168 Oak Park Blvd.N.,P.O. Box 2007 Oak Park Heights,MN 55082-2007 Reference: Xcel Baytown Substation— Plan and Drainage Review Dear Eric, We have performed a review of the plans re-submitted 8/23/2016 regarding the proposed Xcel Baytown Substation project. Following are our comments and recommendations: Stormwater/Drainage 1. The triangular section of land bound by the existing substation to the south,Nova Scotia Avenue to the west,and the Goodwill driveway and parking lot to the south and east currently drains to the east and then north to the existing beehive catch basin in the northeast corner of the site. It doesn't appear that all of this area is accounted for in the proposed conditions. How will this area drain if the stormwater pond sediment forebay is cutting off the existing drainage route?The rate control calculations for both existing and proposed conditions should be updated to account for all flow that will be routed through stormwater pond.For questions regarding this comment,please contact our stormwater engineer,Tyler Johnson at 651-604-4767. General Comments 1. The City reserves the right to inspect the construction of the project. 2. The Owner will need to comply with all requirements of the NPDES Construction Stormwater Permit and the Middle St. Croix Watershed Management Organization.The City reserves the right to require additional erosion control measures as determined necessary during the construction of the project. 3. The Owner shall be responsible for obtaining all required permits. 4. The stormwater facilities proposed for the site shall be considered private and shall be owned and maintained by the Owner. Mr.Eric Johnson Page 2 of 2 Reference:Xcel Baytown Substation—Review of Preliminary Plans If you have any questions or require further information,please do not hesitate to contact me. Regards, STANTEC CONSULTING SERVICES INC. 4-314 Lee M. Mann, P.E. City Engineer Phone: 651-604-4850 lee.mann@stantec.com cc: Andy Kegley, Public Works Director Julie Hultman, Building Official Scott Richards,City Planner Mark Vierling,City Attorney Lisa Danielson,City Arborist