HomeMy WebLinkAbout2000-08-08 CC Meeting Packet EnclosureMeeting Date &
Agenda Placement Old 13os fsi
Originating Department/Requestor /4 - civvk it.s7y.ii-
Requester's Signature i2dejta16:
Action Requested !2e& v i a-For-n(1(1,60-6
Oak Park Heights
Request for Council Action
Agenda Item Title - 14.5,5i9; Gird - CoytsTrke,/ - i t oyAScAerj el
Tovv- ko
Background/justification (Please indicate if any previous action has been taken or if other public bodies
have advised)
•
ENCLOSURE 11
a 10
Date/re Received VW00 City Administrator/Date
Financial Implications $
Budget Line Item
Budgeted: Yes No Funding: Levy Other
Administrative Recommendation:
Approve Deny No Recommendation
Comments:
S AS HARED\Forms\COUNCIL ACTION REQUEST.doc
VSSA
SCHEDULE OF EVENTS
Monday, July 24, 2000
Wednesday, July 26, 2000
Grading plan in
Foundation permit
Tuesday, July 25 — Thursday, July 27, 2000
Friday, July 28, 2000
Dirt moving
Stake paths
Bridge design
Monday, July 31 — Tuesday, August 1, 2000
Paths (bituminous)
City build stairs
Thursday, August 3 — Friday, August 4, 2000
Curb & gutter /parking lot
Monday, August 7, 2000
Thursday, August 10 — Friday, August 11, 2000
Next meeting
Parking lot (bituminous)
JULY 20, 2000
CITY OF OAK PARK HEIGHTS
14168 NORTH 57TH STREET
OAK PARK HEIGHTS, MN. 55082
SCHEDULE OF CONSTRUCTION
FRAME
ROOF /SIDING
MECHANICAL
INSULATION
SHEETROCK
HI2ONGARD CONSTRUCTION COMPANY
14791 60TH STREET NORTH, SUITE 2
STILLWATER, MINNESOTA 55082
PHONE: (651) 430 -2314 • FAX: (651) 430 -3921
RE: BOUTWELL ESTATES 4 FLEX
5535/5545/5555/5565 NOLAN AVENUE NORTH
WEEK 1 & 2
WEEK 3 & 4
WEEK 3 & 4
WEEK 5
WEEK 5 & 6
CITY PARK
PHASE
TIMELINE
ENCLOSURE 07
6/26/00 City Council approves Phase 1 Construction Plan (revised
grading plan, pathways, and parking lot).
6/27/00 VSSA engages Tim Freeman to complete survey of current
grading plan.
6/30-7/7/00 Survey completed. Survey demonstrates complete
compliance with the original grading plan approved by the
city.
7/12/QP Survey spbraitted to Kris DanieJsort fctr review by Jay
Johnson.
7/12-7/14/00
7/17/00
Revised grading plan developed (Ed Reid) with contours
illustrating the berm, parking lot, and as sloping requested
by the Park Commission.
7/14/00 Revised grading plan submitted to Jay Johnson for review
by City Engineer.
Revised grading plan and approved by City Engineer if
approval occurs more rapidly, the time table will be moved
up accordingly).
7/20-7/28/00 Contractor (Pete Miller or Imperial) engaged to initiate and
con 1 final grading work. Dirt added as necessary.
7/28-8/4/00 Contractor (A&P) engaged to initiate and Class 5
and asphalt work on parking lot and pathways.
S•ti
Fax Transmission
Date: 07/28/00
To: Jay Hembroff
Organization: Imperial Developers
Fax Numbers (952) 469-6419
Subject: Boutwells LandingNSSA -- Park Parking Lot
te
Dennis M. Postier, P.E.
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
\\ l datalodd155155988051Word \Fax - Park Parking Lot design to Imp and A &P.doc
Bonestroo, Rosene, Anderlik and Associates
From: Dennis M. Postler
Our File No: 55-98 -805
Pages to Follow: 3
Original Will Follow in Mali: Yes No E]
As requested by Larry Palmquist of Adolfson & Peterson, Inc., transmitted herewith please find a plan for
the Boutwells Landing/ V S SA Park parking lot. Also attached is an estimated quantity list to assist you with
specified materials. Please note that the quantities shown pertain to the parking lot only and do not include
any grading or earthwork outside the parking lot limits. See Jay Johnson at the City of Oak Park Heights for
details relating to the overall park grading plan. Specifications for Boutwells LandingfVSSA Utility and
Street Improvements dated August, 1999 (File No. 55-98 -805) will apply to the parking lot construction
also.
We will stake and inspect the construction of the parking lot on the City's behalf, and would appreciate a
couple days notice to perform the construction staking. Please call me at (651) 604-4815 for notification, or
if you have any questions on the design of the parking lot.
An original (11" x 17 ") copy of this plan is being mailed to you under separate cover.
Sincerely,
6 7
cc: Tom Melena, Administrator
Jay Johnson, Public Work Director
Larry Palmquist, Adolfson & Peterson, Inc. (612 - 525 -2333 fax)
Mike Price, Senior Housing Partners (651- 490 -9145 fax)
DMP, DDH, MLJ, File — BRAA
www.bonestroo.com
2335 West Highway 36 St. Paul, MN 55113 Phone: 651-636-4600 Fax: 651 - 636 -1311
Bonestroo
NON
Rosene
Anderlik &
Associates
Engineers b Architects
Select Granular **
A• • re• ate Base, CI. 5, 100% crushed
Bituminous Base Course, T •e 31
Bituminous Wear Course, T pe 41
B618 Concrete Curb and Gutter
4" Solid White Line - Epox
12' Solid White Line -- E •ox
Handica• s mbol - E•ox
2' x 3' CB, incl R- 3067 -V cst• w/ ad rin • s
15" RCP storm sewer, Class 5
15" FES includin• trash •uard
Class 3 rip rap hand placed
4" PVC SCH 40 sanita sewer service
6" DIP watermain service, CI. 52
Connect to existin ■ water service
Connect to existin • sanita sewer service
Construction Total
Boutwelts Landing Park
Parking Lot Quantities
July 27, 2000
* Material assumed to remain on site
** May not be required depending on existing site conditions
Vf.
1,1
L171 - 7/Q7 •. .D3X "
S x 03x7S10
McYHO
A3Awrs
Z1= 11,31V:1,43 nry It111
LN,13.15 In. API V.. 1,0 331 hi SYM
. .1.31D3d5 SOU. AVVI Alm/3a a3x3st
- "A N '
42
Z 3,0
sii,„.,06s
NiliePutt
011135% Fir
ormsaucig
NUIIJI IdibNUJ 11.3 1 1)1\11>I8Vd
SINR13AOLIdV4l 13381S ONV Ainun
DNIONV1 si
VIOS]NNIII SIHOI]H AVM >1V0