Loading...
HomeMy WebLinkAbout2000-08-08 CC Meeting Packet EnclosureMeeting Date & Agenda Placement Old 13os fsi Originating Department/Requestor /4 - civvk it.s7y.ii- Requester's Signature i2dejta16: Action Requested !2e& v i a-For-n(1(1,60-6 Oak Park Heights Request for Council Action Agenda Item Title - 14.5,5i9; Gird - CoytsTrke,/ - i t oyAScAerj el Tovv- ko Background/justification (Please indicate if any previous action has been taken or if other public bodies have advised) • ENCLOSURE 11 a 10 Date/re Received VW00 City Administrator/Date Financial Implications $ Budget Line Item Budgeted: Yes No Funding: Levy Other Administrative Recommendation: Approve Deny No Recommendation Comments: S AS HARED\Forms\COUNCIL ACTION REQUEST.doc VSSA SCHEDULE OF EVENTS Monday, July 24, 2000 Wednesday, July 26, 2000 Grading plan in Foundation permit Tuesday, July 25 — Thursday, July 27, 2000 Friday, July 28, 2000 Dirt moving Stake paths Bridge design Monday, July 31 — Tuesday, August 1, 2000 Paths (bituminous) City build stairs Thursday, August 3 — Friday, August 4, 2000 Curb & gutter /parking lot Monday, August 7, 2000 Thursday, August 10 — Friday, August 11, 2000 Next meeting Parking lot (bituminous) JULY 20, 2000 CITY OF OAK PARK HEIGHTS 14168 NORTH 57TH STREET OAK PARK HEIGHTS, MN. 55082 SCHEDULE OF CONSTRUCTION FRAME ROOF /SIDING MECHANICAL INSULATION SHEETROCK HI2ONGARD CONSTRUCTION COMPANY 14791 60TH STREET NORTH, SUITE 2 STILLWATER, MINNESOTA 55082 PHONE: (651) 430 -2314 • FAX: (651) 430 -3921 RE: BOUTWELL ESTATES 4 FLEX 5535/5545/5555/5565 NOLAN AVENUE NORTH WEEK 1 & 2 WEEK 3 & 4 WEEK 3 & 4 WEEK 5 WEEK 5 & 6 CITY PARK PHASE TIMELINE ENCLOSURE 07 6/26/00 City Council approves Phase 1 Construction Plan (revised grading plan, pathways, and parking lot). 6/27/00 VSSA engages Tim Freeman to complete survey of current grading plan. 6/30-7/7/00 Survey completed. Survey demonstrates complete compliance with the original grading plan approved by the city. 7/12/QP Survey spbraitted to Kris DanieJsort fctr review by Jay Johnson. 7/12-7/14/00 7/17/00 Revised grading plan developed (Ed Reid) with contours illustrating the berm, parking lot, and as sloping requested by the Park Commission. 7/14/00 Revised grading plan submitted to Jay Johnson for review by City Engineer. Revised grading plan and approved by City Engineer if approval occurs more rapidly, the time table will be moved up accordingly). 7/20-7/28/00 Contractor (Pete Miller or Imperial) engaged to initiate and con 1 final grading work. Dirt added as necessary. 7/28-8/4/00 Contractor (A&P) engaged to initiate and Class 5 and asphalt work on parking lot and pathways. S•ti Fax Transmission Date: 07/28/00 To: Jay Hembroff Organization: Imperial Developers Fax Numbers (952) 469-6419 Subject: Boutwells LandingNSSA -- Park Parking Lot te Dennis M. Postier, P.E. BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. \\ l datalodd155155988051Word \Fax - Park Parking Lot design to Imp and A &P.doc Bonestroo, Rosene, Anderlik and Associates From: Dennis M. Postler Our File No: 55-98 -805 Pages to Follow: 3 Original Will Follow in Mali: Yes No E] As requested by Larry Palmquist of Adolfson & Peterson, Inc., transmitted herewith please find a plan for the Boutwells Landing/ V S SA Park parking lot. Also attached is an estimated quantity list to assist you with specified materials. Please note that the quantities shown pertain to the parking lot only and do not include any grading or earthwork outside the parking lot limits. See Jay Johnson at the City of Oak Park Heights for details relating to the overall park grading plan. Specifications for Boutwells LandingfVSSA Utility and Street Improvements dated August, 1999 (File No. 55-98 -805) will apply to the parking lot construction also. We will stake and inspect the construction of the parking lot on the City's behalf, and would appreciate a couple days notice to perform the construction staking. Please call me at (651) 604-4815 for notification, or if you have any questions on the design of the parking lot. An original (11" x 17 ") copy of this plan is being mailed to you under separate cover. Sincerely, 6 7 cc: Tom Melena, Administrator Jay Johnson, Public Work Director Larry Palmquist, Adolfson & Peterson, Inc. (612 - 525 -2333 fax) Mike Price, Senior Housing Partners (651- 490 -9145 fax) DMP, DDH, MLJ, File — BRAA www.bonestroo.com 2335 West Highway 36 St. Paul, MN 55113 Phone: 651-636-4600 Fax: 651 - 636 -1311 Bonestroo NON Rosene Anderlik & Associates Engineers b Architects Select Granular ** A• • re• ate Base, CI. 5, 100% crushed Bituminous Base Course, T •e 31 Bituminous Wear Course, T pe 41 B618 Concrete Curb and Gutter 4" Solid White Line - Epox 12' Solid White Line -- E •ox Handica• s mbol - E•ox 2' x 3' CB, incl R- 3067 -V cst• w/ ad rin • s 15" RCP storm sewer, Class 5 15" FES includin• trash •uard Class 3 rip rap hand placed 4" PVC SCH 40 sanita sewer service 6" DIP watermain service, CI. 52 Connect to existin ■ water service Connect to existin • sanita sewer service Construction Total Boutwelts Landing Park Parking Lot Quantities July 27, 2000 * Material assumed to remain on site ** May not be required depending on existing site conditions Vf. 1,1 L171 - 7/Q7 •. .D3X " S x 03x7S10 McYHO A3Awrs Z1= 11,31V:1,43 nry It111 LN,13.15 In. API V.. 1,0 331 hi SYM . .1.31D3d5 SOU. AVVI Alm/3a a3x3st - "A N ' 42 Z 3,0 sii,„.,06s NiliePutt 011135% Fir ormsaucig NUIIJI IdibNUJ 11.3 1 1)1\11>I8Vd SINR13AOLIdV4l 13381S ONV Ainun DNIONV1 si VIOS]NNIII SIHOI]H AVM >1V0