Loading...
HomeMy WebLinkAbout2016-10-06 WC Recorded Document 1243092 Receipt:#338796 1 243092 EAS No $46.00 Tax Due 1111 II(III I VIII 11111 III III 101 Return to: E-SIMPLIFILE Certified Filed and/or recorded on: 4844 North 300 West Suite 202 10/6/2016 3:48 PM Provo UT 84604 1 243092 Certificate#: 40498 Office of the Registrar of Titles Washington County,Minnesota Jennifer Wagenius,Registrar of Titles NOTICE OF CERTIFICATION STATE OF MINNESOTA ) COUNTY OF WASHINGTON ) ss. CITY OF OAK PARK HEIGHTS ) I, the undersigned being duly qualified and acting as City Administrator for the City of Oak Park Heights, Minnesota DO HEREBY CERTIFY that I have compared the attached document: Stormwater Management Facilities Declaration and Easement Agreement Xcel Energy Nova Scotia Ave. Substation (Baytown Substation CUP) 13957 60`h St. N. with the original thereof on file at the offices of the City of Oak Park Heights,and that the same is a full, true and complete copy of said document within the files of the City of Oak Park Heights. WITNESS my hand and the seal of the City of Oak Park Heights, this 6th day of October, 2016. t <a E i 4ohnson k . Administrator [Torrens] STORMWATER MANAGEMENT FACILITIES DECLARATION AND EASEMENT AGREEMENT THIS STORMWATER MANAGEMENT FACILITIES DECLARATION AND EASEMENT AGREEMENT is made and given on VAC , 2016 by Northern States Power Company, a Minnesota Corporation ("Owner"), to the City of Oak Park Heights, a Minnesota municipal corporation, ("City"). WHEREAS, Owner is the fee owner of the property legally described on attached Exhibit A ("Property"); and WHEREAS, stormwater management facilities on the Property will be connected to the City's stormwater utility system, and the City's system and the surface waters of the City and the State may be adversely affected by the operation and maintenance of stormwater management facilities on the Property; and WHEREAS, in connection with an application by Owner for the Conditional Use Permit for the expansion of the NSP Baytown Substation located on Nova Scotia Ave., the City has required, as a condition of approval, the execution and recording of this Stormwater Management Facilities Declaration and Easement Agreement ("Agreement"); and WHEREAS, to secure the benefits and advantages of the City's approval, Owner desires to subject the Property to the terms hereof; NOW, THEREFORE, Owner declares that the Property is, and shall be, held, transferred, sold, conveyed and occupied subject to the easement hereinafter granted and the terms of this Agreement. 1. Definitions. For purposes of this Agreement, the following terms shall have the meanings given. 1.1. "Stormwater Management Facilities" means the following 456312v1 CLL MD165-1 1 improvements designed and constructed to manage stormwater. The designation of the improvement corresponds to the designation on Exhibit B, the approved plans for the Stormwater Management Facilities. 1.1.1. [Vegetative Filter System] 1.1.2. 1.1.3. 1.1.4. 1.2. "Operations and Maintenance Checklist" means the operations and maintenance checklist form for the corresponding Stormwater Management Facility. The Operations and Maintenance Checklist[s] for the corresponding Stormwater Management Facilities [is/are] attached as Exhibit C. 2. Owner's Obligations. 2.1. The Owner shall construct Stormwater Management Facilities in accordance with the approved plans attached as Exhibit B. A full size original of Exhibit B is on file with the City Engineer of the City. Construction of the Stormwater Management Facilities shall be completed by 12'/ /11 2.2. The Owner shall inspect the Stormwater Management Facilities, at least as frequently as is specified, and meeting all of the requirements for inspections listed, on the Operations and Maintenance Checklists. Completed Operations and Maintenance Checklists forms shall be completed annually and delivered to the City Engineer within thirty (30) days of their completion and no later than October 1st of each calendar year. 2.3. The Owner shall continuously and perpetually maintain, clean, repair and replace the Stormwater Management Facilities. All Stormwater Management Facilities shall be so maintained, repaired and replaced as to maintain their original, approved design, function, volume, capacity, and efficiency. Without limiting the generality of the foregoing, maintenance, repair and replacement activities shall include, at a minimum, activities listed on the Operations and Maintenance Checklists. 3. Enforcement. 456312v1 CLL MD165-1 2 Section 3.1 hereof; 4.2.3. locate, construct, reconstruct, operate, maintain, inspect, alter and repair the Stormwater Management Facilities in accordance with Section 3.1 hereof; and 4.2.4. cut, trim, or remove trees, shrubs, or other vegetation that, in the City's judgment, unreasonably interfere with the Stormwater Management Facilities. 5. Miscellaneous. 5.1. No Waiver. Failure to enforce any provision of this Agreement upon a violation of it will not be deemed a waiver of the right to do so as to that or any subsequent violation. 5.2. Validity. Invalidation of any of the terms of this Agreement will in no way affect any of the other terms, which will remain in full force and effect. 5.3. Duration of Easements. The agreements and easements granted herein are permanent and shall remain in effect in perpetuity. 5.4. Warranty of Grantor. The Owner warrants that it is the owner of a fee simple interest in the Property, that it has the right to grant this Agreement, and that the Property is free and clear of any lien, encumbrance, easement, restriction, covenant or condition, except for those filed of record with the County Recorder or Registrar of Titles for Washington County, Minnesota. 5.5. Easement Runs with Land. This Agreement runs with the land and is binding on the Owner, its heirs, successors and assigns. 5.6. Amendments. This Agreement may not be amended without the written approval of the City and the Middle St. Croix Watershed Management Organization. 456312v1 CLL MD165-1 4 By: Pamela Jo Rasmussen Its: Senior Manager, Siting& Land Rights, Northern States Power Company, a Minnesota corporation UaiSainsivt STATE OF MINNESOTA ) ss. COUNTY OF aut eta;(4 The foregoing instrument was acknowledged before me this 1S day of A-kk ,4,k 464 , ?.p i tp -2012, by Pamela Jo Rasmussen, the Senior Manager, Siting & Land Rights of N6i'thern States Power Company, a Minnesota corporation, on behalf of the corporation. c1,fav Notary Publi -- • I TERI LAVAUER =Nt'; .OLeLIG s NOTARY PUBLIC-STATE OF WISCONSIN .yam •� My commissionexpires •-'`�'•••......•• March 17, 2017 �ti�° wisco + THIS INSTRUMENT WAS DRAFTED BY: NSP 414 Nicollet Mall, Minneapolis, MN 55401 For City use only: Planning File# Date of Council approval 456312v1 CLL MD165-1 5 0NORTHERN STATES POWER N .-•/ MINNESOTA EXHIBIT A SHEET 1 OF 2 SHEETS Certificate of Survey Location: Oak Park Heights Grantor: Xcel Energy See sheet 2 of 2 for descriptions. Scale: 1"=50' S88°53'44"E 100.22 -� P.O.B. i ) NE COR. OF"PREMISES" •% •• EASEMENT • 2` '.,• `ms`s°%• ,p CD '0 nW o ., C'-♦CP -' >% ° � op ', + •2%% W n vJ . O) `• ‘ rf1 •J' I:c N c:", 1 1CD 0 „,.- 03 IN- cfl E. LINE OF 1 W "PREMISES" /394N APPROXIMATE LINE OF / ;o SCS 100-YR. FLOOD i z U 1 i N% / `c Z.;.- 35.12 J N89°37'22"W cj LINE TABLE C CD LINE BEARING DISTANCE L1 N58°00'54"W 10.01 L2 N15°52'14"W 7.26 L3 N44°05'38"W 10.99 L4 N57°40'52"W 20.92 L5 N14°56'52"E 19.30 I HEREBY CERTIFY THAT THIS SURVEY, PLAN,OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LAND SURVEYOR UNDER THE LAWS OF THEAT OF MINNESOTA. SUB: BaytownMI HAEL E. ANN ON LIC. NO.40035 SEC. 5, T.29 N., R. 20 W., 4th P.M. CO.: Washington DATE 9-E-/6; • • e? NORTHERN STATES POWER ,. MINNESOTA EXHIBIT A SHEET 2 OF 2 SHEETS Certificate of Survey Location: Oak Park Heights Grantor: Xcel Energy "Premises": The West 300.00 feet of the East 1013.00 feet of the South 225.00 feet of the North 550.00 feet of the Northeast Quarter of the Northeast Quarter of Section 5, Township 29 North, Range 20 West, Washington County, Minnesota, as measured at a right angle to the east line and the north line of said Northeast Quarter of the Northeast Quarter. "Easement Area": An easement over, under and across the herein before described "Premises" described as follows: Beginning at the northeast corner of said "Premises"; thence South 01 degree 03 16 seconds East, along the east line of said "Premises" a distance of 208.98 feet; thence North 89 degrees 37 minutes 22 seconds West 35.12 feet; thence North 58 degrees 00 minutes 54 seconds West 10.01 feet; thence North 15 degrees 52 minutes 14 seconds West 7.26 feet; thence North 00 degrees 25 minutes 58 seconds East 79.69 feet; thence North 25 degrees 33 minutes 13 seconds West 89.73 feet; thence North 44 degrees 05 minutes 38 seconds West 10.99 feet; thence North 57 degrees 40 minutes 52 seconds West 20.92 feet; thence North 14 degrees 56 minutes 52 seconds East 19.30 feet to the north line of said "Premises"; thence South 88 degrees 53 minutes 44 seconds East, along said north line, 100.22 feet to the point of beginning. Containing 0.29 acres, more or less. SUB: Baytown SEC. 5, T.29 N., R. 20 W., 4th P.M. CO.: Washington • EXHIBIT B Stormwater Management Facilities Approved Plans 456312v1 CLL MD 165-1 B-1 Exhibit C Operations and Maintenance Checklist BIORETENTION - Operation & Maintenance Checklist Project: Xcel Energy Baytown Substation Location: Site Status: Date: Time: Inspector: Maintenance Item Satisfactory/ Comments Unsatisfactory 1. Debris Cleanout(Monthly the first Year;every 6 months thereafter) Contributing areas clean of litter and vegetative debris No dumping of yard wastes into facility Bioretention area clean of litter and vegetative debris 2. Vegetation (Monthly the first Year; every 6 months thereafter) Undesirable vegetation removed Basin has uniform perennial vegetative cover No evidence of erosion 3. Dewatering (Monthly the first Year; every 6 months thereafter) Dewaters between storms within 48 hours No evidence of standing water 4. Sediment Deposition (Monthly the first Year, every 6 months thereafter) Pretreatment areas clean of sediment Contributing drainage area stabilized and clear of erosion Winter sand deposition evacuated every spring 407091v1 CLL LW105-1 Exhibit C Operations and Maintenance Checklist APPENDIX D. OPERATION&MAINTENANCE CHECKLISTS 5. Inlet/Outlet/Overflow Spillway(Annual, After Major Storms) Good condition, no need for repair No evidence of erosion No evidence of any blockages 6. Integrity of Filter Bed (Annual) Filter bed has not been blocked or filled inappropriately Comments: Actions to be taken: 407091v1 CLL LW105-1