Loading...
HomeMy WebLinkAbout2005-11-01 NAC Planning ReportRE: BACKGROUND Attached for reference: Exhibit 1: Exhibit 2: Exhibit 3: Exhibit 4: ENCLOSURE 2 NORTHWEST ASSOCIATED CONSULTANTS, INC. 4800 Olson Memorial Highway, Suite 202, Golden Valley, MN 55422 Telephone: 763.231.2555 Facsimile: 763.231.2561 planners@nacplanning.com PLANNING REPORT TO: Eric Johnson FROM: Scott Richards DATE: November 1, 2005 FILE NO: 798.02 — 05.13 Oak Park Heights — Valley Senior Services Alliance (VSSA) Concept Plan Review — Skilled Care Addition, Memory Care Addition and Historic Village VSSA has made application for concept plan approval for a skilled care addition, memory care addition, and a historic village on the Boutwells Landing campus. The proposed concept plan is consistent with the plans approved in 1999 that included future phases with the care and memory centers. Concept plan approvals that included these elements have since expired, making it necessary to review a new concept plan. The request includes the following: • Care center, 110 bed — 2006 Two level parking ramp and parking lot expansions — 2006 Historic Village including school, band shell, and chapel — 2006 City park enhancements, park shelter — 2006 Memory Care Center, 28 unit, relocated adult and child care — 2008 Conservatory connection to existing Town Center — 2008 Tunnel to business district — 2008 The concept plans indicate the timing of each phase of the development. A project narrative also explains the history of the Boutwells Landing project and the needs for senior housing and services in the St. Croix Valley. Existing Conditions Boutwells Landing Concept Plan Boutwells Landing Concept Plan Details Site Lighting Plan Project History /Existing Campus. Ten years ago, Lakeview Hospital recognized a need in the St. Croix Valley for additional older adult housing and services. Three organizations, Presbyterian Homes and Services; Lakeview Hospital; and Croixdale Residence, joined together to form Valley Senior Services Alliance (VSSA), a non - profit organization to meet the needs of older adults in the Valley. The organization envisioned a community that would provide a continuum of care that would meet the needs of older adults as they age in the community where they lived and worked. That vision became Boutwells Landing which now includes: Exhibit 5: Exhibit 6: Exhibit 7: Exhibit 8: Exhibit 9: Exhibit 10: Exhibit 11: Exhibit 12: ISSUES ANALYSIS Care Center First Floor Plan Second/Third Floor Plan Lower Level Plan Elevation Plans Parking Ramp Sections Historic Village Buildings Landscape Plano Boutwells Landing /Park Project Narrative 56 village homes (side -by -side townhomes), completed in 2000. 94 assisted living apartments in the Commons building, completed in October 2001 (since July 2004, 29 of these units are dedicated to memory care). The Gathering at Boutwelis Landing, a residential hospice service in the Commons, founded in 2004 in partnership between Lakeview Hospital and Boutwells Landing. 101 units of independent living apartments in the Terrace, completed in February 2002. A Town Center that links the Commons and the Terrace, and provides convenient services and opportunities for community, both for residents and members of the larger St. Croix Valley community. Features include a town hall/ chapel, a general market, cafe, museum, bank, barber /beauty shop, educational classrooms, theater, library, fitness center, two pools, and locker rooms. A Boutwells bus to transport residents within Boutweils and into town for shopping, medical appointments and other activities. The bus provides more than 350 rides each month. 78 brownstone units (one level independent living homes), six coach homes (detached single family homes), and 75 additional village homes (side -by -side homes), all now taking reservations. VSSA has recognized from the beginning, that to provide the continuum of care, a skilled nursing care facility would need to be part of the Boutwells Landing complex. The care center and memory care addition would provide the services to complete that continuum. 2 Unit Breakdown. The current submittal reflects slight changes to the numbers of units for each phase of development from the original PUD submittal. The current existing and proposed unit count is as follows: EXISTING 1 PROPOSED HOUSING UNITS Phase 1 (Existing) Independent Living 91 units Alzheimer /Dementia Care 12 units Assisted Living 89 units Duplexes 44 units Quadraplexes 8 units TOTAL 244 units Phase 11 (Existing) Independent Living 78 units Duplexes 81 units TOTAL 159 units Phase 111 (Proposed) Assisted /Memory Care 38 units Skilled Nursing Care 110 units TOTAL 148 units TOTAL PROJECT UNITS 551 units Zoning. The area has been zoned PUD District. When zoning property as PUD, the City designates an underlying district as the basis for compliance with the ordinance. In that the principal use is a mixture of residential and business use, the appropriate underlying zoning has been designated as R -B, Residential Business Transitional District. Within that district, multiple family dwellings are allowed as a permitted use and nursing homes and similar group housing is allowed as conditional. The Boutwells Landing project will comply with the conditions set forth in Section 401.28.E.3 related to nursing homes and similar group housing. Subdivision. The final plat for Boutwells Landing has been approved and is filed with Washington County. The main campus area is designated as Lot 1, Block 2. The adjacent park area is designated as Lot 2, Block 2. The Haase Nature Preserve area is designated as Lot 2, Block 3. There are no changes to the property description as a result of this new development. Lot Area. The area of the main campus lot is 694,393 square feet. The Zoning Ordinance requires at least 1,000 square feet of lot area per unit of elderly housing. The lot could support 694 units of housing. At complete build out of all phases of the main campus, 418 total units are proposed. Setbacks. The Zoning Ordinance under the R -B District requires 30 foot front and rear yards and 10 foot side yard setbacks. Additionally, one of the conditions for approval of nursing homes and other similar housing requires a doubling of the setback requirements. As such, the front and rear yard setbacks would be 60 feet and the side 3 yards 20 feet. All of the buildings proposed for the main campus would be at least 70 feet from the right -of -way of surrounding streets. A setback of 10 feet is required for all parking areas from the right -of -way. All of the proposed parking areas are at least 20 feet from the adjacent rights -of -way. The following setbacks apply to the building and parking ramp structures: Care Center -- 58 Street right - of - way Memory Care ®- 58 Street right -of -way Memory Care — Norwich Ave right -of -way Memory Care -- Norwich Parkway right -of -way Parking Ramp — 58 Street Parking and Driveways Required Proposed Setback Setback 60 feet 60 feet 60 feet 60 feet 60 feet 10 feet 110 feet 105 feet 60 feet 110 feet 60 feet ++10 feet Parking. Currently, 214 surface stalls and 80 underground garage stalls have been constructed for the Boutwells Landing main campus. The approved PUD also included an additional 55 stalls that would be held as proof of parking to be constructed with subsequent plans. The Zoning Ordinance includes parking requirements for the category of sanitariums, convalescent home, rest home, nursing home, or day nurseries, for elderly housing and for offices. The parking requirements for each aspect of project is as follows: Existing Units (Phase 1) Independent Living Elderly Housing one stall required per unit 91 X 1 = 91 Existing Units (Phase 1) Assisted Living 1 Alzheimer Five spaces plus one for each three beds 101 4- 3 + 5 = 39 Existing Exis_ jo_gth,_[Pil Town center Three spaces plus one space for each 200 square feet 27,923 — 10% = 25,131 ÷ 3 129 Proposed Units jPhase 2 ConstructedZlndependent Living Elderly Housing — one stall required per unit 78 X 1 = 78 Proposed Units (Phase 3 Proposed), Assisted /Memory Care /Skilled Care Five spaces plus one for each three beds 148 = 3 + 5 = 55 Total Requirement for All Main Campus 392 Currently, 214 surface stalls and 80 stalls under the independent living facility are constructed. New surface stalls and a two level parking facility will be constructed as part of the phase to be completed in 2006. The two level parking facility will be located between the new care center and 58 Street. Elevations of the parking facility have 4 been included indicating how it w i l l be constructed within the existing slopes so that it appears as a surface parking lot from 58 Street. One hundred ten spaces will be constructed, making the parking total for the main campus at 404. The proposed parking will meet the requirements of the Zoning Ordinance. As part of general plan submittals, locations for disability accessible stalls will need to be identified. Access. As part of the parking lot changes, the access drive from 58 Street into the north side of the main campus will be moved 55 feet to the west of the current driveway location. The City Engineer has reviewed the proposed driveway location and does not see a traffic or site line issue. Minimum Floor Area. The Zoning Ordinance requires that elderly housing have the following minimum floor area per unit: Efficiency Units 440 square feet One Bedroom 520 square feet As constructed, the existing independent living and assisted living facilities meet these standards. Detailed floor plans with dimensions are not available at the concept level of review for the proposed units. Floor plans will be required with the general plan of development submittals. Building Height. The elevation diagrams do not include the overall heights of the three story care center. It is expected that the height will exceed the 35 foot height limitation of the R-B District. A conditional use permit will be applied for, if necessary, at the general plan of development stage. The City granted a building height conditional use permit as part of the PUD approvals for the existing main campus buildings in 1999. Building Design. The Boutwells Landing project would be subject to Design Guidelines requirements in that it is a residential /commercial use within a PUD. The specific building design and materials will be reviewed as part of the general plan of development. The buildings are to be similar in design and character as the existing campus buildings. The plans include a one story conservatory within the courtyard surrounded by the existing town center and the new care center. That is projected to be constructed in 2008. Additionally, the plans indicate a tunnel under 58 Street to connect the main campus with the commercial district to the north. That feature is also planned for 2008. Costs and engineering considerations need to be addressed before specific plans and a timeline for that construction can be completed. Historic Village /Parks. Plans for a school, chapel and band shell have been presented for the area south of the existing City park off of Norwich Parkway. The school is a historic structure that would be moved from another site. The chapel is a structure designed to resemble the First Presbyterian Church in the Stillwater area. VSSA had planned on constructing a picnic shelter on the site but has proposed participating with the City on the construction of a shelter in the City park. The details of 5 the City1VSSA joint park shelter project will need to be considered by the Parks Commission and the City Council as a separate issue from the PUD review. The site plan indicates a parking lot to be constructed adjacent to the historic village. It is a 28 stall lot that is identified as proof of parking. The Planning Commission and City Council should provide direction to the applicant regarding the parking lot and timing of construction. If special group events are going to be held at the facility, the parking lot should be constructed. Landscaping. A conceptual landscape plan has been submitted as part of the application. The City Arborist has reviewed and approved all landscape plans. More detailed plans are to be submitted as part of the general plan of development review. As part of the conceptual landscape plan, the area between the main campus building and the pond within the City park is shown as planted in prairie grasses. VSSA representatives have requested to pay for the conversion of these areas into prairie plantings and to establish a more definitive edge between the mowed grass areas and the area that slopes to the pond. The general plan of development will address more definite plans for this area. Grading and Drainage. Grading and drainage plans will need to be submitted for the general plan of development and shall be subject to the City Engineer's review and approval. Utility Plans. Utility plans will need to be submitted for the general plan of development and shall be subject to the City Engineer review and approval. Sidewalks /Trails. The site plan indicates the addition of new sidewalks as part of the additions to the main campus. A sidewalk is added on the west side of Norwich Avenue and connects to the trail on 58 Street. Sidewalks are added in front of the proposed buildings and provide connections to the parking lot. The Parks Commission and Planning Commission should comment on the concept plans for the sidewalks. Lighting /Signage. Preliminary plans for lighting have been provided. Detailed plans for lighting and any signage will need to be presented for general plan of development review. CONCLUSION 1 RECOMMENDATION Based upon the submittals and review herein, City staff recommends the approval of the concept plan for the skilled care addition, memory care addition, and historic village, The concept plan should be recommended with a condition granting concept plan approval until the end of 2008. That would allow the 28 unit memory care center, related adult and child care, conservatory, and tunnel approvals to remain in place until the general plan of development applications are made for that phase of construction. The concept plan approvals are recommended with the following conditions: 6 1 Concept plan approval shall extend to December 31, 2008 for this application. 2. The Planning Commission and City Council should comment on construction and timing of the 28 stall parking lot adjacent to the historic village. 3. The City Engineer shall approve all driveway locations from 58 Street. 4. Detailed floor plans with dimensions and square footages shall be provided for general plan of development review. 5 Detailed elevation diagrams with dimensions shall be provided for each building to determine building heights as part of general plan of development review. 0 The City and VSSA should discuss construction of a park shelter in the City park as a joint venture. 7 The Parks Commission and Planning Commission shall review all proposed sidewalk and trail connections and provide input for general plan submittal. 8. The applicant shall submit detailed plans as part of general plan of development review related to off - street parking locations, design and number of stalls. 9. Material samples for all proposed buildings shall be required as part of general plan of development review. 10. The applicant shall submit a detailed lighting plan as part of general plan of development review. 11. The applicant shall submit tree removal and tree preservation plans subject to review of the City Arborist. 12. The applicant shall submit detailed landscape plans as part of general plan of development approval subject to approval of the City Arborist. 13. Signage details will need to be provided as part of general plan of development approval. 14. A detailed grading and drainage plan will need to be submitted subject to review and approval of the City Engineer. 15. The utility plan is reviewed as part of general plan of development and is subject to review and approval of the City Engineer. 16. A snow removal and storage plan shall be submitted by the applicant. 17. The Police Chief and Fire Chief should comment on any safety vehicle access issues of the access points, driveways, or of the general site plan. 7 18. The applicant shall be required to enter into an amended development contract with the City specifying the conditions of approval and address the issues related to phasing the development. 19. Any other conditions of City staff, Planning Commission, Parks Commission or City Council. S " __ ' L'44s$ 'g §fl 3 c1 C12 ILI e g=8' I 1 tuj ' -_ ........................ \ co co 0 LT;.1 1 N . HC IM HO N o 0 IA i' C> e s U 1111 1III D I 4 ____ il e o zN N E ) , 1 2 1 w D U U 0 L I 2 1 1 co rp. fa og 1 1 111 11111 IIIIIIIII1ll1 IIIII!!!1!!!IIlII lilIIIIIIIIIi IIIIIIIIIIIIIIIIIIII 1IIifEliiliililll 1111111111111111, I IIIIIIIIIIIIIIIIH I lomplogno flhIII'III'I11IIO ,II, ! 11IL!HI1111III1 . 111 111 1 1 I I I I 1 1 1 I 1 I 1 I I I I I I I I I EIII11I111I11I1 11 1IU II1111I111 #111111 • I i i i li iHi l i l iliiII i iiIUii 1 1111 1 I I 1 I n liv illliimuuiuuiiillli l 1 1 I I 1 I 1 1 1 1 1 1 1 1 1 1 1 I iIIIE IIII iiili i i iiiiIII 1111. u I— c] z I CfD - T111111111111111 1111111111111 130 0 a fJ 1 N '3AV HOIAMON 1 2 Boutwells Landing Care Center: Case for Support Executive Summary Valley Senior Services Alliance (VSSA), a shared mission of Lakeview Hospital, Croixdale and Presbyterian Homes & Services (PHS), requests the coinnzunity's support for the addition of a much- needed care center to the Boutwells Landing senior living coizzinzunity in St. Croix Valley. It is the missing piece that will complete the corns nunity of caring envisioned by VSSA when the idea for Boutwells Landing was first conceived. Planning for Boutwells Landing began nearly 10 years ago in response to the area's limited supply of older adult housing and services and a projected growth in the number of older adults in the area of 350 percent over the next 25 years. The first housing at Boutwells Landing 56 Village Homes (side --by -side townhomes) became available in 2000. In the following two years, 94 assisted living apartments (29 of which are now memory care units) and 101 independent living apartments were completed in two separate living complexes. They are linked by an innovative Town Center that offers the convenience and community gathering areas of a small "downtown" area, accessible not only to assisted living and independent living residents, but to the residents of Village Homes ( 137) and the Brownstones (78), and . to the community at large. The consensus among residents, staff, partner organizations and the community is that the missing piece in this community of caring is a care center. Currently, when residents of Boutwells Landing need skilled nursing care, either for short -term or longer term health issues, they need to leave Boutwells Landing, separating them from the friends they've made and the staff they've come to know and trust, and often, from a spouse who no longer drives, creating undue hardship for everyone involved. Nearby care centers are generally full, and the nearest Presbyterian Homes care center is 18 miles away, in Roseville. Boutwells Landing is an ideal location for a new care center. There is available land and the main building was architecturally designed to link to a 90 to 110 -unit skilled nursing facility. In addition, locating care centers with other older adult housing helps give care center residents the experience of being part of a larger community and lessens any feelings of isolation. A campus the size of Boutwells Landing along with St. Andrews Village, the Deerfield, Croixdale, Summerhouse of Woodbury and Echo Ridge would both support the care center and benefit from the p resence of 24 -hour nursing staff and an on -site clinic. It also provides the community at large, which is experiencing a shortage of care center beds, with another nearby option for nursing care. The care center will require an investment of $20 million, exclusive of land costs, which have already been absorbed in the construction of the original buildings. Care centers, although a critical part of the continuum of care, are traditionally the least feasible financially. To make the care center financially viable, we seek to raise the entire construction cost through philanthropic capital. A generous grant of $10 million from Andersen Foundation invites the opportunity to raise the remaining S10 million so that we can put this gift to use and break ground for this crucial component in Boutwells Landing community of caring. 1 EXHIBIT 12 All of these living options are located within a beautiful natural setting with rolling hills, majestic oaks and pines, park areas and nature trails, and all feature access to a wide variety of planned activities designed to meet a wide variety of needs. They include computer and arts classes, support groups, informal gatherings for coffee or cocktails, movies and other entertainment, exercise classes, discussion groups, religious services, a choir, and variety of off - campus outings. This style of older adult housing reflects a growing evolution from the congregate rental units of the 1980s, to a complete continuum of products designed to accommodate the lifestyle needs of extremely diverse market segments: from younger active older adults who may simply desire to live among peers and be relieved of some of the daily tasks of home ownership, to very frail older adults in need of wide range of support and services. The need and desire for the Boutwells Landing community experience and continuum of care is clear from the occupancy rate alone, ranging from 95 to 100 percent among the completed housing options, with several having a waiting list. Broad Comnaunit Participation i� w.erw Among the the vS S A partners, Presbyterian Hones & Services manages the property and housing services, while Lakeview Hospital manages the homecare services provided to the residents of assisted living, as well as a new hospice unit. As part of the partnership, PHS and Croixdale have also worked together to completely rebuild the Croixdale assisted living and independent living apartments, providing additional options for St. Croix valley older adults and linking them to the continuum of care available at Boutwells. Other organizational and community partnerships have also been integral to the success of Boutwells Landing, offering convenient services to Boutwells residents and volunteer opportunities for residents and community members, and bringing people of all ages onto the campus, providing numerous opportunities for multi - generational interactions. For example: • The Museum is operated by Washington County Historical Society. • Since 2001, Warm World, a,29-year-old Child Development Center in Stillwater provides services to more than 55 pre-schoolers every day in the main building. • Lakeview Hospital Diabetes and Nutrition Education program, with eight professional nurses and dietician, is housed in the main building. • H. S . I.' s adult day program, Circle of Friends, is housed in the main building and serves 40 adults each week. • Lakeview Hospital houses their entire HomecarefHospice program (over 40 professionals serving all of Washington County) within the main building. • HS.I.'s Meals -on- Wheels program is housed in the main building and the Boutwells Landing kitchen provides more than 3200 meals each month to support this countywide service. • First State Bank and Trust operates a branch within the Town Center and Lake Elmo Bank has a satellite office in the Terrace. • Courage Center was instrumental in the design of the Fitness Center and the pools and is operating several classes. 3 because Lakeview Hospital currently staffs the assisted living services at Boutwells the coordination of care as residents need to move to and from assisted living, the care center and the hospital will be much easier to facilitate, because it will all take place within one system of care. A campus the size of Boutwells Landing would both support the care center and benefit from the presence of 24 -hour nursing staff and the on -site clinic that would be part of the care center. For example, the emergency call pendants available to all residents would be connected directly to the nurses on staff, providing faster, higher -level nursing care during emergencies. Residents throughout the Boutwells campus would have greater peace of mind, knowing there is a nurse on duty 24 hours a day, and potentially a clinic right on campus as well. The clinic we envision would be in the vicinity of the new care center with two exam rooms, one treatment room, a reception area, and record storage. The clinic would be staffed by Stillwater Medical Group, a 50 physician multi - specialty clinic linked to Lakeview Hospital, located in the St. Croix River Valley. The convenient access would help ensure continuity of care for residents of Boutwells Landing and eliminate transportation and parking hassles, Boutwells Landing is in conversation to pilot a geriatric clinic to access services on site. Family members will likely appreciate the convenience of treating health needs within one location, reducing the amount of time off from work when they accompany loved ones. It also provides the community at large with another nearby option for skilled nursing care. This will be a benefit for all adults in the community. Increasingly, care centers are used not just for older adult care, but for rehabilitation after strokes, joint replacement surgery and other medical situations where there is a need for non - hospital nursing care before a patient is able to return home. Today, the average length of stay in a care center is 45 days, with many stays under 20 days and shrinking. In short, a Boutwells Landing care center will benefit Boutwells Landing residents, other older adults in the area, and the entire St. Croix Valley community. The Boutwells Land in f Cape Center: A new kind of nursin care .......................... ............................... The current Boutwells Landing site can accommodate the proposed expansion, while preserving the natural beauty and integrity of the land as open space. The 90 to 11O -unit care center is designed to be linked to the north side of the main building that currently includes the Town Center, the Commons assisted living building and the Terrace independent living building. For residents of these buildings who need nursing care, the location will allow them to remain easily connected with a spouse or friends who still live in the Commons, Terrace or Village Homes. The initial design is still in process, but it will likely have features similar to the care center PHS is currently building in Bloomington, including private resident rooms with private bathrooms, kitchenettes and sitting areas. The goal is to provide a living environment that is as "home -like" as possible, while meeting each resident's nursing and personal care needs. The residents will live in "neighborhoods" of four to 20 residents, each with a communal activity /dining room area that will serve as a focal point for social interaction at mealtimes and gatherings, and reducing the need for frail residents to journey down long hallways to access basics of care, and pay the same reimbursement rate throughout the State of Minnesota, despite higher metro -area costs. As a mission - driven organization, however, VS S A feels a commitment to provide the older adults we serve with a full continuum of care, including skilled nursing care. The project will require an investment of $20 million exclusive of land costs that have already been absorbed in the construction of the original buildings. To make the care center financially viable we seek to raise the entire construction cost through philanthropic capital. Carrying debt load on the care center would hinder its operation. For the expansion to move forward, significant philanthropic support is required from area foundations and community members, with many naming opportunities available to honor a person or group or perpetuate a family name. A generous grant of $10 million from Andersen Foundation invites the opportunity to raise the remaining $1O million to break ground. dosed Timeline Construction to begin as early as 2006 Architect Insite Architects, Kirk Velett mmaY Boutwells Landing is standing at the threshold of a major expansion. For several years, this vital older adult community has needed a care center to keep pace with the level of care and programming Boutwells residents and the St. Croix valley community want and deserve. This is a moment of great promise for the community the entire area has come to appreciate. Boutwells Landing is now at a point where substantial community support is needed to make this vision a reality. Your gift can help this important community asset continue to offer the services our older adults need to stay together as couples, even when their care needs vary, and allow older adults to remain in the community of care they love if their level of care increases. Board of Directors Mark Campbell, Chair Donald M. Davies Curt Geissler Robert S. Hagstrom Beth Heikki la Jeffrey Robertson Cara Torseth 7