HomeMy WebLinkAbout2016-12-16 Stantec Plan & Drainage Design Review Stantec Consulting Services Inc.
2335 Highway 36 West
St.Paul MN 55113
Tel: (651) 636-4600
Stantec Fax: (651)636-1311
December 16,2016
Mr.Eric Johnson,Administrator
City of Oak Park Heights
14168 Oak Park Blvd.N.,P.O.Box 2007
Oak Park Heights,MN 55082-2007
Reference: Kwik Trip—Plan and Drainage Design Review
Dear Eric,
We have reviewed the plans re-submitted 11/30/2016 and drainage calculations re-submitted
8/30/2016 regarding the proposed Kwik Trip. Following are our comments and
recommendations:
Stormwater Management
1. The project is subject to review by the Brown's Creek Watershed District.The City shall
be provided a copy of the permit approval letter from the BCWD prior to construction.
2. All other previous comments have been addressed.
Site Plan
1. The bituminous walk along Minnesota Avenue must be 6-feet wide to match the walk
across the street along the Bank property. The property owner will be responsible for
maintaining this walk.
2. All sidewalks and trails shall meet City and ADA requirements and the pedestrian curb
ramps need to be in conformance with City Detail Plate STR-7. This includes
trails/sidewalks that cross driveways.
3. See attached sheet SP1 with redlines showing portions of the trails at intersections cross
hatched. These hatched areas should not constructed unless there are corresponding
destinations(trails,sidewalks,ped ramps etc.)across the intersection.
Grading,Drainage, Erosion Control
1. The stormwater facilities proposed for the site,including facilities that encroach into
the drainage and utility easements and the City right-of-way,shall be considered private
and shall be owned and maintained by the Owner.
2. The City reserves the right to require additional erosion control measures as
determined/necessary during the construction of the project.
Design with community in mind
Mr.Eric Johnson
Page 2 of 3
Reference:Kwik Trip-Plan and Drainage Design Review
Utility Plan
1. Previous comments have been addressed.
Details
1. Revise the Trail Section detail,show a minimum 5-foot separation from the roadways
for snow storage and a 2-foot zone at the same grade as the trail,between the trail and
the ditches.
2. Make reference that storm sewer manhole#16 shall conform to City Standard Detail
Plate STO-2 with an allowance of 2-4 rings.
General Comments
1. The City reserves the right to inspect the construction of the project. The City or its
designee shall be present for water and sanitary sewer service connections to the City's
systems.
2. The Owner will need to comply with all requirements of the NPDES Construction
Stormwater Permit and the Brown's Creek Watershed District. The City reserves the
right to require additional erosion control measures as determined/necessary during
the construction of the project.
3. The Owner shall be responsible for obtaining all required permits.
4. Utility construction and improvements in the right-of-way need to conform to the City's
Standard Detail Plates.
If you have any questions or require further information,please do not hesitate to contact me.
Regards,
STANTEC CONSULTING SERVICES INC.
711aAA.
Lee M.Mann,P.E.
City Engineer
Phone: 651-604-4850
lee.mann@stantec.com
Design with community in mind
Mr.Eric Johnson
Page 3 of 3
Reference:Kwik Trip—Plan and Drainage Design Review
attachment: Sheet SP1 redline
cc: Andy Kegley,Public Works Director
Julie Hultman,Building Official
Scott Richards,City Planner
Mark Vierling,City Attorney
Lisa Danielson,City Arborist
Design with community in mind
, ....
,........-,,:z.......r.-t—....
... ....„=„,..,.........
KWH(
\-. I Z
5EITH 4ThfE IJORTH
Th:P
-...'",•-•,..-,* .
". ID --'" La"' ,..._
''' 10 .. Z1 "'
__ 2 -' E.F.S:':
.4 ..:-.:1, . _ _4.. : -----.....---
---1%: - , , ±,. __ , Jc
. .
a a, •
- - - ----r.:T.22.T • 1
ii,
p- I , 1 , 1 ...................
5413111?
-
\ 1.
MION W.P.M.
a4'. .1177:17:=7"— PA.110X1117
: - I ' ' abe aa ' El \1 `i ! 1 , .............-........... ilitirsilTlima
11 n ii
-.'_!a_421 INSITES
11 II 1:1- -1 • \i,T.-- \- - --- —
,- .., - , ' ,--kt" ,- —
,
- .. \il. \ \•=' --
'\\ Iv- ,g \ ---- - ...7.-....:-,-.7.st.-1...-:-.....:
1 . .... a 44,
, a a e I INI 1 .,..- - .... \
i...Y.- ...gm pliatinkai_....ma
. -
.i .
--- tlit'
5 — -
'----i —II -
IF _ . :•an_i_ri hl. 0. ,, \ -A \
t ....
r
, i'
• ,/..!' t ' Z X 'M
e • ./. . , 1-4
-.0j---- NIL A.'" " CI:EX I Mr I •' ,\\
. 111111i.M.011.01 Iii m , \\'‘ g gtg 1
..4\kl's-i -,y 1 alliMillMri 1 1 ,
III
5 1"
'4 1 )\1 , \-.
'' •-,
A I c•1 V.9.TV.
i, ' 0.P STAIICN 3ECOMO.0010X 11+11
....,
I 1-
1 '--- _—_//k_—_ --- - __ ,PA4
' .?"
/ I
I M.
1
Julie Hultman
From: Mann, Lee <Lee.Mann@stantec.com>
Sent: Friday, December 16, 2016 1:37 PM
To: Eric Johnson
Cc: Andrew Kegley;Julie Hultman; Lisa Danielson; Scott Richards (Scott@PlanningCo.com);
Mark Vierling (MVierling@eckberglammers.com)
Subject: Kwik Trip Review
Attachments: johnson_mann_2016-12-16_KwikTrip_review_w-attachment.pdf
Eric,
Attached is our latest review letter for Kwik Trip. Let me know if you have any questions. Have a good
weekend!
Lee
Principal
Stantec
2335 Highway 36 West St. Paul MN 55113-3819
Phone: (651) 604-4850
Cell: (651) 775-5956
Lee.Mann@stantec.com
Stantec
.• .E3, _ s e . x A ;:, 1. �1"' Zz3� fF'
The content of this email is the confidential property of Stantec and should not be copied,modified,retransmitted,or used for any purpose except with
Stantec's written authorization.If you are not the intended recipient,please delete all copies and notify us immediately.
1