HomeMy WebLinkAbout13 BRAUN
INTERTEC Letter of Transmittal 13
The Science You Build On.
Client: Stillwater Area Public Schools Project No: 81602671
Project Name: Stillwater High School Renovations and Additions
Date: July 25, 2016 Braun Intertec Corporation
11001 Hampshire Ave. S.
Bloomington, MN 55438
To: Kristen Hoheisel Phone: 651-351-3840
Stillwater Area Public Schools Email:
Independent School District#834
1875 Greeley St S
Stillwater, MN 55082
Re: Stillwater BLVD N, Oak Park Heights, MN
Documents Sent Comments
Concrete Tests Sets 22-30,43-49
Density Tests Tests 132-140
Special Inspections Reports 35-42
Copy List
Dustin Phillips, Kraus-Anderson Construction Company Michael Smunty, BWBR Architects, Inc.
Jeff Moore,Kraus-Anderson Construction Company Jared Olson,BKBM Engineers
Kristy Casper,Kraus-Anderson Construction Company Julie Hultman,City of Oak Park Heights
Jack Bronczyk,Kraus-Anderson Construction Company
Randy LaFaive, Market&Johnson
Contact Information:
Sent By: Laurie Dudero
Email: Idudero @ braunintertec.com
Phone: (651)487-7003
Rev:05/05/2014 Providing engineering and environmental solutions since 1957
J
BRAUN of Concrete th
9 Compressive Strength Report Date:7/22/2016
INTERTEC Test Method:ASTM C39
Sample:107104
n.�r.esrra
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
I
Sample Details
Set#: 22 Technician: Matheson,Kyle Batched:
Specimen Size: 4"X 8" Cast By: Matheson,Kyle Sampled: 07:55 CDT
Specimens In Set: 5 Date Cast: 06/17/16 Cast: 08:05 CDT
Truck/Ticket#: 861/3782739 Sampled From: Chute Truck Empty:
Contractor: Market and Johnson Placement Method: Pump Placement Time:
Location
Placement Location: Building Interior-Footing
Location Details: sunken pit at grids D.2 to D.6-1.2 to 2.3
Sample Location/Notes: same
Batch Log Specifications
Supplier: Gemstone Mix Design: 5065PF Strength: 3000(psi)
Plant: 3 Lakeland,MN Air: Not Required- (%)
On-Site Admixtures: None
Field Measurements
Weather: Clear Slump(in): 6-1/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 70 Concrete Temp(F): 77(ASTM C1064) Air Content: 3.8(%)(ASTM C231)
Load Volume: 10(yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method
22-1 7 06/24/16 3/4 4.01 12.63 63,920 5,060 4 1A N
22-2 28 07/15/16 3/25 4.00 12.57 78,210 6,220 3 1B N
22-3 28 07/15/16 3/25 4.00 12.57 81,950 6,520 5 1B N
22-4 28 07/15/16 3/25 4.00 12.57 82,750 6,580 5 1B N
22-5 35 H 07/22/16 3/32 _
Test Age Average Strengths(psi):7 Day-5060,28 Day-6440
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1 B:The result meets or exceeds the specified compressive strength.
x \ r n
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
"(" He--""el-C-----;:---f------
Mark Flynn
07/22/2016
Page 1 of 1
0
BRAUN Compressive Strength of Concrete Report Date:7/22/2016
INTERTEC Test Method:ASTM C39 Sample:107177
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
•
Sample Details
Set#: 23 Technician: Matheson,Kyle Batched:
Specimen Size: 4"X 8" Cast By: Matheson,Kyle Sampled: 16:00 CDT
Specimens In Set: 5 Date Cast: 06/17/16 Cast: 16:05 CDT
Truck/Ticket#: 768/3783965 Sampled From: Chute Truck Empty:
Contractor: Market and Johnson Placement Method: Pump Placement Time:
Location
Placement Location: Building Exterior-Foundation Wall
Location Details: At grids A.1-7 to A.5-8.5,piers JJ-10 to JJ-15
Sample Location/Notes: A.1-7
Batch Log Specifications
Supplier: Cemstone Mix Design: 4666P Strength: 4500(psi)
On-Site Admixtures: None Air: 4.5-7.5(%)
Field Measurements
Weather: Clear Slump(in): 5-1/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 85 Concrete Temp(F): 84(ASTM C1064) Air Content: 7.2(%)(ASTM C231)
Load Volume: 6(yds)
• Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(In) Area(in2) (lbs) (psi) Type Remark Method 1
23-1 7 06/24/16 3/4 4.01 12.63 46,830 3,710 5 1A N
23-2 28 07/15/16 3/25 4.00 12.57 64,670 5,150 5 1B N
23-3 28 07/15/16 3/25 4.00 12.57 62,440 4,970 5 1B N
23-4 28 07/15/16 3/25 4.00 12.57 61,630 4,900 5 1B N
23-5 35 H 07/22/16 3/32
Test Age Average Strengths(psi):7 Day-3710,28 Day-5010
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1 B:The result meets or exceeds the specified compressive strength.
X ' \ 7
\A \ / n
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
/*" 7,‘----'"e"-C---1=----f------
Mark Flynn
07/22/2016
Page 1 of 1
BRAUN Com ressive Strength of Concrete Report Date:7/22/2016
INTERTEC Test Method:ASTM C39 Sample:107179
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools 131602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 24 Technician: Mount,Trevor Batched:
Specimen Size: 4"X 8" Cast By: Mount,Trevor Sampled: 16:25 CDT
Specimens In Set: 5 Date Cast: 06/17/16 Cast: 16:30 CDT
Truck/Ticket#: 663/3784028 Sampled From: Chute Truck Empty:
Contractor: Market&Johnson Placement Method: Pump Placement Time:
Location
Placement Location: Building Exterior-Footing
Location Details: Footing at grids C.1-8.5 to E-12.
Sample Location/Notes: C.1-8.5
Batch Log Specifications
Supplier: Gemstone Mix Design: 3067 Strength: 3000(psi)
On-Site Admixtures: None Air: -Not Required(%)
Field Measurements
Weather: Clear Slump(In): 5-1/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 78 Concrete Temp(F): 79(ASTM C1064) Air Content: 5.4(%)(ASTM C231)
Load Volume: 9(yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(int) (lbs) (psi) Type Remark Method
24-1 7 06/24/16 3/4 4.01 12.63 42,680 3,380 4 1A N
24-2 28 07/15/16 3/25 4.00 12.57 60,110 4,780 3 1B N
24-3 28 07/15/16 3/25 4.00 12.57 61,000 4,850 3 1B N
24-4 28 07/15/16 3/25 4.00 12.57 58,920 4,690 3 1B N
24-5 35 H 07/22/16 3/32 _
Test Age Average Strengths(psi):7 Day-3380,28 Day-4770
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1 B:The result meets or exceeds the specified compressive strength.
x \ r n
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1
ii
'#("" ;---?-e°r-C---."::-'-f'-----
Mark Flynn
07/22/2016
Page 1 of 1
t
BRAUN Compressive Strength of Concrete Report Date:7/22/2016
INTERTEC Test Method:ASTM C39 Sample:107422
¶SAO.
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 25 Technician: Kein,David Batched:
Specimen Size: 4"X 8" Cast By: Kein,David Sampled: 16:30 CDT
Specimens In Set: 5 Date Cast: 06/20/16 Cast: 16:40 CDT
Truck/Ticket#: 470/3785687 Sampled From: Chute Truck Empty:
Contractor: Market and johnson Placement Method: Pump Placement Time:
Location
Placement Location: Building Exterior-Foundation Wall
Location Details: At grids A.5-8.5 to C.1-8.5,C.1-7.4 to C.15-12.8
Sample Location/Notes: At grids C.1-8.5
Batch Log Specifications
Supplier: Cemstone Mix Design: 4666P Strength: 4500(psi)
Plant: 3 Lakeland,MN Air: 4.5-7.5(%)
On-Site Admixtures: None
Field Measurements
Weather: Sunny Slump(in): 7-1/2(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 84 Concrete Temp(F): 79(ASTM C1064) Air Content: 5.3(%)(ASTM C231)
Load Volume: 9(yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(int) (lbs) (psi) Type Remark Method
25-1 7 06/27/16 1/6 4.00 12.57 67,830 5,400 3 1A N
25-2 28 07/18/16 1/27 4.02 12.69 84,710 6,680 2 1B N
25-3 28 07/18/16 1/27 4.02 12.69 85,180 6,710 1 1B N
25-4 28 07/18/16 1/27 4.02 12.69 88,320 6,960 5 1B N
25-5 35 H 07/25/16 1/34
Test Age Average Strengths(psi):7 Day-5400,28 Day-6780
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1 B:The result meets or exceeds the specified compressive strength.
x \ r n
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
'1" ;----rea----4,------f"'"-----
Mark Flynn
07/22/2016
Page 1 of 1
BRAUN Compressive Strength of Concrete Report Date:7/22/2016
p 9 sample.107423
INTERTEC
Test Method:ASTM C39
,e.w.c.�e...a.o.
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 26 Technician: Kein,David Batched:
Specimen Size: 4"X 8" Cast By: Kein,David Sampled: 17:45 CDT
Specimens In Set: 5 Date Cast: 06/20/16 Cast: 17:55 CDT
Truck/Ticket#: 440/3785731 Sampled From: Chute Truck Empty:
Contractor: Market and johnson Placement Method: Pump Placement Time:
Location
Placement Location: Building Exterior-Footing
Location Details: At grids D.15-12.8 to E-9.1,E-11 to E.05-11,E-9.1 to E.05-9.1,E.05-11 to E.05-9.1
Sample Location/Notes: At grids D.2-13
Batch Log Specifications
Supplier: Gemstone Mix Design: 3067 Strength: 3000(psi)
Plant: 1 Childs Road St.Paul, Air: -Not Required(%)
MN Slump: -5(in)
On-Site Admixtures: None
Field Measurements
Weather: Sunny Slump(in): 1-1/2(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 81 Concrete Temp(F): 83(ASTM C1064) Air Content: 2.5(%)(ASTM C231)
Load Volume: 9(yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in=) (lbs) (psi) Type Remark Method
26-1 7 06/27/16 1/6 4.00 12.57 35,210 2,800 5 1A N
26-2 28 07/18/16 1/27 4.02 12.69 63,550 5,010 2 1B N
26-3 28 07/18/16 1/27 4.02 12.69 65,330 5,150 1 1B N
26-4 28 07/18/16 1/27 4.02 12.69 64,600 5,090 5 1B N
26-5 35 H 07/25/16 1/34
Test Age Average Strengths(psi):7 Day-2800,28 Day-5080
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1 B:The result meets or exceeds the specified compressive strength.
x \ r n
1
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
ef-/ 7.‘"—"-(3"-C-1:------f4-----
Mark Flynn
07/22/2016
Page 1 of 1
t
BRAUN Compressive Strength of Concrete Report Date:7/22/2016
INTERTEC Test Method:ASTM C39 Sample:107644
Yip
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 27 Technician: Kein,David Batched:
Specimen Size: 4"X 8" Cast By: Kein,David Sampled: 16:35 CDT
Specimens In Set: 5 Date Cast: 06/21/16 Cast: 16:45 CDT
Truck/Ticket#: 787/3787271 Sampled From: Pump Truck Empty:
Contractor: Market and johnson Placement Method: Pump Placement Time:
Location
Placement Location: Building Exterior-Foundation Wall
Location Details: Walls at grids C.15-12.8 to D.4-12.8
Sample Location/Notes: At grids C.5-12.8
Batch Log Specifications
Supplier: Cemstone Mix Design: 4666P Strength: 4500(psi)
Plant: 3 Lakeland,MN Air: 4.5-7.5(%)
On-Site Admixtures: None
Field Measurements
Weather: Sunny Slump(in): 7(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 82 Concrete Temp(F): 79(ASTM C1064) Air Content: 7.2(%)(ASTM C231)
Load Volume: 11 (yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(int) (lbs) (psi) Type Remark Method
27-1 7 06/28/16 1/6 4.00 12.57 48,000 3,820 4 1A N
27-2 28 07/19/16 1/27 4.01 12.63 60,310 4,780 2 1B N
27-3 28 07/19/16 1/27 4.01 12.63 63,260 5,010 1 1B N
27-4 28 07/19/16 1/27 4.01 12.63 61,020 4,830 1 1B N
27-5 35 H 07/26/16 1 /34
Test Age Average Strengths(psi):7 Day-3820,28 Day-4870
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1B:The result meets or exceeds the specified compressive strength.
x \ r WI n
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1". ;,--"*.elff-C-7,:----if"-----
Mark Flynn
07/22/2016
Page 1 of 1
J
BRAUN of Concrete th
9 Compressive Strength Report Date:7/22/2016
INTERTEC Test Method:ASTM C39
Sample:107893
Zf.tai.o.a.wwa.. "
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 28 Technician: Kein,David Batched:
Specimen Size: 4"X 8" Cast By: Kein,David Sampled: 14:30 CDT
Specimens In Set: 5 Date Cast: 06/22/16 Cast: 14:40 CDT
Truck!Ticket#: 534/3788522 Sampled From: Chute Truck Empty:
Contractor: Market and Johnson Placement Method: Pump Placement Time:
Location
Placement Location: Building Interior-Footing
Location Details: footing at grids B-4 to B-7,C-4,C-4.5 to D.2-4.5,E.05-11 to E.2-11,E-9.1 to E-5.5
Sample Location/Notes: at grids C-4.5
Batch Log Specifications
Supplier: Cemstone Mix Design: 3067 Strength: 3000(psi)
Plant: 3 Lakeland,MN Air: -Not Required(%)
On-Site Admixtures: None Slump: -5(in)
Field Measurements
Weather: Sunny Slump(in): 3-1/2(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 80 Concrete Temp(F): 79(ASTM C1064) Air Content: 1.4(%)(ASTM C231)
Load Volume: 10(yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method
28-1 7 06/29/16 1/6 4.00 12.57 44,020 3,500 4 1A N
28-2 28 07/20/16 1/27 4.02 12.69 65,630 5,170 4 1B N
28-3 28 07/20/16 1/27 4.02 12.69 63,590 5,010 1 1B N
28-4 28 07/20/16 1/27 4.02 12.69 65,610 5,170 2 1B N
28-5 35 H 07/27/16 1/34
Test Age Average Strengths(psi):7 Day-3500,28 Day-5120
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1 B:The result meets or exceeds the specified compressive strength.
x \ r n
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
/"" e---"ei-C.--44.------
Mark Flynn
07/22/2016
Page 1 of 1
s
BRAUN Compressive Strength of Concrete Report Date:7/22/2016
INTERTEC Test Method:ASTM C39 Sample:107894
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 29 Technician: Kein,David Batched:
Specimen Size: 4"X 8" Cast By: Kein,David Sampled: 16:20 CDT
Specimens In Set: 5 Date Cast: 06/22/16 Cast: 16:30 CDT
Truck/Ticket#: 741/3788572 Sampled From: Chute Truck Empty:
Contractor: Market And Johnson Placement Method: Pump Placement Time:
Location
Placement Location: Building Interior-Footing
Location Details: footing at grids B-4 to B-7,C-4,C-4.5 to D.2-4.5,E.05-11 to E.2-11,E-9.1 to E-5.5
Sample Location/Notes: at grids B-7
Batch Log Specifications
Supplier: Gemstone Mix Design: 3067 Strength: 3000(psi)
Plant: 3 Lakeland,MN Air: -Not Required(%)
On-Site Admixtures: None Slump: -5(in)
Field Measurements
Weather: Slump(in): 4-1/2(ASTM C143) Plastic Unit Weight:
Air Temperature(9: Concrete Temp(F): 81 (ASTM C1064) Air Content: 1.3(%)(ASTM C231)
Load Volume: 10(yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in=) (lbs) (psi) Type Remark Method
29-1 7 06/29/16 1/6 4.00 12.57 38,830 3,090 5 1A N
29-2 28 07/20/16 1/27 4.02 12.69 59,620 4,700 1 1B N
29-3 28 07/20/16 1/27 4.02 12.69 57,720 4,550 1 1B N
29-4 28 07/20/16 1/27 4.02 12.69 59,400 4,680 1 1B N
29-5 35 H 07/27/16 1/34
Test Age Average Strengths(psi):7 Day-3090,28 Day-4640
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1 B:The result meets or exceeds the specified compressive strength.
x \ r ki4 n
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
1- 7.‘----"e'-C-4----f.-----
Mark Flynn
07/22/2016
Page 1 of 1
BRAUN Compressiveg
Strength of Concrete Report Date:7/22/2016
INTERTEC Test Method:ASTM C39
Sample:108151
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 30 Technician: Mount,Trevor Batched:
Specimen Size: 4"X 8" Cast By: Mount,Trevor Sampled: 15:30 CDT
Specimens In Set: 5 Date Cast: 06/23/16 Cast: 15:35 CDT
Truck/Ticket#: 464/3790056 Sampled From: Chute Truck Empty:
Contractor: Market&Johnson Placement Method: Chute Placement Time:
Location
Placement Location: Building Interior-Pier
Location Details: Piers,grids C.28-4.5 to D.14-4.5.Footings,grids E-9.1 to E-6.
Sample Location/Notes: C.28-4.5
Batch Log Specifications
Supplier: Gemstone Mix Design: 4666P Strength: 4500(psi)
On-Site Admixtures: None Air: 4.5-7.5(%)
Field Measurements
Weather: Cloudy Slump(in): 2-1/2(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 76 Concrete Temp(F): 79(ASTM C1064) Air Content: 4.9(%)(ASTM C231)
Load Volume: 7(yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method
30-1 7 06/30/16 1/6 4.00 12.57 59,900 4,770 4 1A N
30-2 28 07/21/16 1/27 4.01 12.63 75,350 5,970 1 1B N
30-3 28 07/21/16 1/27 4.01 12.63 77,950 6,170 1 1B N
30-4 28 07/21/16 1/27 4.01 12.63 76,540 6,060 1 1B N
30-5 35 H 07/28/16 1/34
Test Age Average Strengths(psi):7 Day-4770,28 Day-6070
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1 B:The result meets or exceeds the specified compressive strength.
x \ r/L WI \ rn
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
'1./ ;--rell"-C-----47---f-'-'-----
Mark Flynn
07/22/2016
Page 1 of 1
BRAUN Compressive Strength of Concrete Report Sample:110221
• INTERTEC Test Method:ASTM C39
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 43 Technician: Matheson,Kyle Batched:
Specimen Size: 4"X 8" Cast By: Matheson,Kyle Sampled: 07:05 CDT
Specimens In Set: 5 Date Cast: 07/08/16 Cast: 07:15 CDT
Truck/Ticket#: 895/3803665 Sampled From: Chute Truck Empty:
Contractor: Market and Johnson Placement Method: Pump Placement Time:
Location
Placement Location: Building Interior-Structural Slab on Grade
Location Details: Pit slab at grids D.19 to D.6-1.2 to 2.3
Sample Location/Notes: At grids D.5-2
Batch Log Specifications
Supplier: Cemstone Mix Design: 5065PF Strength: 4000(psi)
Plant: 3 Lakeland,MN Air: Not Required- (%)
On-Site Admixtures: None
Field Measurements
Weather: Partly cloudy Slump(in): 5-3/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 68 Concrete Temp(F): 78(ASTM C1064) Air Content: 3.7(%)(ASTM C231)
Load Volume: 10(yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(int) (lbs) (psi) Type Remark Method
43-1 7 07/15/16 3/4 4.00 12.57 81,680 6,500 4 1A N
43-2 28 08/05/16 3/25
43-3 28 08/05/16 3/25
43-4 28 08/05/16 3/25
43-5 35 H 08/12/16 3/32
Test Age Average Strengths(psi):7 Day-6500
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
/N 4NA, r
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
Mark Flynn
07/22/2016
Page 1 of 1
BRAUN ress
Com ive Strength of Concrete Report Date:7/22/2016
INTERTEC Test p g Sample.110337 '
Method:ASTM C39
erse�s.wuaa
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 44 Technician: Kein,David Batched:
Specimen Size: 4"X 8" Cast By: Kein,David Sampled: 13:20 CDT
Specimens In Set: 5 Date Cast: 07/08/16 Cast: 13:30 CDT
Truck/Ticket#: 895/3804601 Sampled From: Chute Truck Empty:
Contractor: Market and Johnson Placement Method: Pump Placement Time:
Location
Placement Location: Building Exterior-Wall
Location Details: Walls at grids FF-26 to FF-28,FF-28 to A*
Sample Location/Notes: At grids FF-26
Batch Log Specifications
Supplier: Gemstone Mix Design: 4666P Strength: 4500(psi)
Plant: 3 Lakeland,MN Air: 4.5-7.5(%)
On-Site Admixtures: None
Field Measurements
Weather: Cloudy Slump(in): 5(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 70 Concrete Temp(F): 69(ASTM C1064) Air Content: 6.2(%)(ASTM C231)
Load Volume: 11 (yds)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method
44-1 7 07/15/16 3/4 4.00 12.57 59,600 4,740 4 1A N
44-2 28 08/05/16 3/25
44-3 28 08/05/16 3/25
44-4 28 08/05/16 3/25
44-5 35 H 08/12/16 3/32
Test Age Average Strengths(psi):7 Day-4740
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
x \ r)N ka \ rn
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
'11 ;.---`"ef-C.---14"-------
Mark Flynn
07/22/2016
Page 1 of 1
BRAUN Compressive Strength of Concrete Report Date:7/22/2016
INTERTEC Test Method:ASTM C39 Sample:110633
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 45 Technician: Kein,David Batched:
Specimen Size: 4"X 8" Cast By: Kein,David Sampled: 14:50 CDT
Specimens In Set: 5 Date Cast: 07/11/16 Cast: 15:00 CDT
Truck/Ticket#: 829/3806561 Sampled From: Chute Truck Empty:
Contractor: Market and Anderson Placement Method: Pump Placement Time:
Location
Placement Location: Building Interior-Wall
Location Details: At grids D.2-2.5 to D.5-2.5,D.5-2.5 to D.5-1.3,D.5-1.3 to D.2-1.3,D.2-1.3 to D.2-2.5.
Sample Location/Notes: At grids D.2-2.5
Batch Log Specifications
Supplier: Gemstone Mix Design: 4666P Strength: 4500(psi)
Plant: 3 Lakeland,MN Air: 4.5-7.5(%)
On-Site Admixtures: None
Field Measurements
Weather: Cloudy Slump(in): 6-1/2(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 86 Concrete Temp(F): 69(ASTM C1064) Air Content: 4.7(%)(ASTM C231)
Load Volume: 10(yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(int) (lbs) (psi) Type Remark Method
45-1 7 07/18/16 2/5 4.02 12.69 72,860 5,740 4 1A N
45-2 28 08/08/16 2/26
45-3 28 08/08/16 2/26
45-4 28 08/08/16 2/26
45-5 35 H 08/15/16 2/33
Test Age Average Strengths(psi):7 Day-5740
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
x
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
Mark Flynn
07/22/2016
Page 1 of 1
BRAUN Compressive Strength of Concrete Report Date:7/22/2016
p 9 Sample:110641
INTERTEC
Test Method:ASTM C39
n.om.m.r.wuaa..
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 46 Technician: Kein,David Batched:
Specimen Size: 4"X 8" Cast By: Kein,David Sampled: 16:00 CDT
Specimens In Set: 5 Date Cast: 07/11/16 Cast: 16:10 CDT
Truck/Ticket#: 477/3806642 Sampled From: Chute Truck Empty:
Contractor: Market and Johnson Placement Method: Pump Placement Time:
Location
Placement Location: Building Exterior-Footing
Location Details: D.1-1.2 to D.6-1.2
Sample Location/Notes: At grids D.6-1.2
Batch Log Specifications
Supplier: Gemstone Mix Design: 3067 Strength: 3000(psi)
Plant: 3 Lakeland,MN Air: -Not Required(%)
On-Site Admixtures: None
Field Measurements
Weather: Cloudy Slump(in): 2-1/2(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 90 Concrete Temp(F): 69(ASTM C1064) Air Content: 2.1 (%)(ASTM C231)
Load Volume: 8(yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method
46-1 7 07/18/16 2/5 4.02 12.69 49,170 3,880 4 1A N
46-2 28 08/08/16 2/26
46-3 28 08/08/16 2/26
46-4 28 08/08/16 2/26
46-5 35 H 08/15/16 2/33
Test Age Average Strengths(psi):7 Day-3880
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
xrn
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
Mark Flynn
07/22/2016
Page 1 of 1
BRAUN Compressive Strength of Concrete Report Date:7/22/2016
INTERTEC Test Method:ASTM C39 Sample:110928
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 47 Technician: Kein,David Batched:
Specimen Size: 4"X 8" Cast By: Kein,David Sampled: 08:40 CDT
Specimens In Set: 5 Date Cast: 07/13/16 Cast: 08:50 CDT
Truck/Ticket#: 566/3808510 Sampled From: Chute Truck Empty:
Contractor: Curb Masters Placement Method: Chute Placement Time:
Location
Placement Location: Paving-Sidewalk
Location Details: Sidewalk on median of Southwest corner of Neal and 58th
Sample Location/Notes: Sidewalk on median of Southwest corner of Neal and 58th
Batch Log Specifications
Supplier: Cemstone Mix Design: 3Y3268 Strength: 4500(psi)
Plant: 3 Lakeland,MN Air: 5.0-8.0(%)
On-Site Admixtures: None
Field Measurements
Weather: Sunny Slump(in): 3-1/2(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 80 Concrete Temp(F): 82(ASTM C1064) Air Content: 5.6(%)(ASTM C231)
Load Volume: 8(yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method
47-1 7 07/20/16 1/6 4.02 12.69 52,740 4,160 4 1A N
47-2 28 08/10/16 1/27
47-3 28 08/10/16 1/27
47-4 28 08/10/16 1/27
47-5 35 H 08/17/16 1/34
Test Age Average Strengths(psi):7 Day-4160
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
x \ \ r n
\ rTYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
irr‘--"--e.-C-----#------
Mark Flynn
07/22/2016
Page 1 of 1
BRAUN Com ressive Strength of Concrete Report Date:7/22/2016
INTERTEC Test Method:ASTM C39 Sample:111025
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools 61602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 48 Technician: Thomas,Nathaniel Batched: 1
1
Specimen Size: 4"X 8" Cast By: Thomas,Nathaniel Sampled: 13:40 CDT
Specimens In Set: 5 Date Cast: 07/13/16 Cast: 13:50 CDT
Truck/Ticket#: 861/03809333 Sampled From: Chute Truck Empty:
Contractor: Marret&Johnson Inc Placement Method: Chute Placement Time:
Location
Placement Location: Building Exterior-Footing
Location Details: C.38-1.2 to C.38-4.3
Sample Location/Notes: C.38-1.2.
Batch Log Specifications
Supplier: Cemstone Mix Design: 3000 3/4D FX Strength: 3000(psi)
Plant: 3 Lakeland,MN
On-Site Admixtures: None
Field Measurements
Weather: Sunny Slump(in): 2-1/2(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 85 Concrete Temp(F): 84(ASTM C1064) Air Content: 3.2(%)(ASTM C231)
Load Volume: 7(yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method
48-1 7 07/20/16 1/6 4.02 12.69 48,560 3,830 4 1A N
48-2 28 08/10/16 1/27
48-3 28 08/10/16 1/27
48-4 28 08/10/16 1/27
48-5 35 H 08/17/16 1/34
Test Age Average Strengths(psi):7 Day-3830
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
x \ r n
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
/../ ..‘"--"(111.-C----4----f----
Mark Flynn
07/22/2016
Page 1 of 1
BRAUN Compressive
Com ressive Strength of Concrete Report Date:7/22/2016
Sample:111286
• INTERTEC Test Method:
ASTM C39
rn,sa,,,�xmewnoe.
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 49 Technician: Kein,David Batched:
Specimen Size: 4"X 8" Cast By: Kein,David Sampled: 15:00 CDT
Specimens In Set: 5 Date Cast: 07/14/16 Cast: 15:10 CDT
Truck/Ticket#: 849/3811021 Sampled From: Chute Truck Empty:
Contractor: Kraus Anderson Placement Method: Pump Placement Time:
Location
Placement Location: Building Exterior-Wall
Location Details: At grids 1.15-1.2 to D.6-1.2,D.6-1.2 to D.6-3.
Sample Location/Notes: At grids D.15-1.2
Batch Log Specifications
Supplier: Gemstone Mix Design: 4666P Strength: 4500(psi)
Plant: 3 Lakeland,MN Air: 4.5-7.5(%)
On-Site Admixtures: None
Field Measurements
Weather: Cloudy Slump(in): 4-3/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 70 Concrete Temp(F): 78(ASTM C1064) Air Content: 6.5(%)(ASTM C231)
Load Volume: 11 (yd3)
Lab Test Results
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method
49-1 7 07/21/16 4/3 4.00 12.57 59,820 4,760 4 1A N
49-2 28 08/11/16 4/24
49-3 28 08/11/16 4/24
49-4 28 08/11/16 4/24
49-5 35 H 08/18/16 4/31
Test Age Average Strengths(psi):7 Day-4760
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
X \ /
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
'1" ;---"-(1-C"----4-----jf--'------
Mark Flynn
07/22/2016
Page 1 of 1
BRAUN Field Compaction Client: Project:
I NTE RTEC Report Stillwater Area Public Schools B1602671
1381 North Rice Street Stillwater High School Renovations and
Report Date:7/22/2016 Additions
1826 B1erMe Foad Teat Method:ASTM D6938 St Paul,MN 55117
Saint Paul,MN 55110 Stillwater BLVD N
Pion.651-487-3245 Oak Park Heights,MN
Test Results
Optimum Maximum In Place in Place Probe
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Min Comp.
Test# Of Date Proctor ID Method Classification (%) (pet) (%) (pcf) (in) Compaction (%) Remark
132 7/18/16 P-11 STD B SM 11.3 119.0 7.0 119.4 12 100 98 A
133 7/18/16 P-11 STD B SM 11.3 119.0 8.0 117.2 12 98 98 A
134 7/18/16 P-11 STD B SM 11.3 119.0 8.7 117.3 12 99 98 A
135 7/18/16 P-11 STD B SM 11.3 119.0 7.9 118.9 12 100 98 A
136 7/18/16 P-11 STD B SM 11.3 119.0 8.7 117.1 12 98 95 A
137 7/18/16 P-11 STD B SM 11.3 119.0 8.6 120.2 12 101 95 A
138 89 7/6/16 t P-08 STD B SM 8.4 124.4 7.8 121.8 12 98 98 A
139 99 7/15/16 P-09 STD B SM 9.4 126.9 8.2 124.9 12 98 95 A
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN Field Technician
132 Structural Fill:Interior Wall Backfill:At grids C.37-4 95.0 FE=100 Troxler 3430 35286 Singer,Zach
133 Structural Fill:Interior Wall Backfill:At grids C.4-2 96.0 FE=100 Troxler 3430 35286 Singer,Zach
134 Structural Fill:Interior Wall Backfill:At grids C.4-4 95.0 FE=100 Troxler 3430 35286 Singer,Zach
135 Structural Fill:Interior Wall Backfill:At grids C.37-2 94.0 FE=100 Troxler 3430 35286 Singer,Zach
136 Structural Fill:Exterior Wall Backfill:At grids D.3-1.1 100.0 FE=100 Troxler 3430 35286 Singer,Zach
137 Structural Fill:Exterior Wall Backfill:At grids D-1.1 100.0 FE=100 Troxler 3430 35286 Singer,Zach
138 Utility Trench Backfill: Plumbing:50'N 12'W of door 19S 100.0 FE=100 Troxler 3430 23055 Matheson,Kyle
139 Utility Trench Backfill: Storm Sewer:20 ft west of manhole#21 95.0 top of manhole=100 Troxler 3430 35286 Matheson,Kyle j
Remarks Comments Related Tests
A:Test results comply with specifications Tests are"Direct Transmission'(Method A)unless probe depth is noted as'Backscatter'.
Gauge calibration data on tile with the testing agency. Test# Related Test# Test Type
1
1
Page 1 of 2
BRAUN Field Compaction Client: Project:
I NTE RTEC Report Stillwater Area Public Schools B1602671
1381 North Rice Street Stillwater High School Renovations and
Report Date:7/22/2016
1826 Buedde Road Test Method:ASTM 06938 St Paul,MN 55117 Additions
Salm Paul,MN 66110 Stillwater BLVD N
Phone:651-487.720.5 Oak Park Heights,MN
Test Results
Optimum Maximum In Place In Place Probe
Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Min Comp.
Test# Of Date Proctor ID _ Method Classification (%) (pcf) (%) (PO (in) Compaction (%) Remark
140 100 7/15/16 P-09 STD B SM 9.4 126.9 7.3 126.5 12 100 100 A
Test Information
Gauge
Test# Test Location Elevation Reference Make/Model/SN Field Technician
140 Utility Trench Backfill: Storm Sewer:40 ft west of manhole#21 100.0 top of manhole=100 Troxler 3430 35286 Matheson,Kyle
Remarks Comments Related Tests
A:Test results comply with specifications Tests are"Direct Transmission"(Method A)unless probe depth is noted as"Backscatter.
Gauge calibration data on file with the testing agency. Test# Related Test# Test Type
/"... ----rege----4----"f'—'---
Mark Flynn
07/22/2016
Page 2 of 2
BRAUN Special Inspection Daily Report 35 ,
INTERTEC
1828 euulds Road Client Project
Saint Paul,Md 55110
Phone:851.487-3245 SOlwater Asa Public Schools 81602871
1381 North Rios Shoat Slava*arr High School Rsnowllons and Additions
St Paul,MJ 55117 S1Wwelrr 80,43 N
Oak Park Heights,OM
Activity Date:07/0812016 City of:Oak Park Heights Report Number.35
Technician:Matteson,Kyle Braun krtertec PM:Mark Flynn Weather:Mostly cloudy 75
Coverage Frequency Notes
Concrete Construction Periodic Reinforcement and concrete placement
Special Cases Continuous Adhesive anchors
Architect/engineer authorized changes to approved plans?Yes
Work Completed Description:
Observed reinforcement and concrete placement for pit slab at grids D.19 D.6-12 to 2.3.Cemstone mix 5065PF was placed by pump.
Cast 1 set d concrete cylinders for laboratory analysis.
Observed reinforcement and concrete placement of foundation walls at grids A•-9.5*to FF-28,FF-18 to FF-25.1,piers D*-10.5*to D*-
7.3*and A-2 to C-2 Gemstone concrete mix 4666 was placed by pump.Cast 1 set of concrete cylinders for laboratory analysis.
Observed the placement d adhesive anchors into ngs per RA 153 at grids C.2-2.7 and C.2-3.7. drill
Holes appeared to be ed'
cleaned,and pieced in general accordance to HIE s p�cl6caflons.
Tests Performed:
Concrete test sets$43 and 44
Adhesive anchor observations
OrAstanding discrepancies on this project?:No Report discussed with and sent to contractor?:Yes
Photos
See Adhesive Anchor Checklist 7-8-16.pdf in the documents section at the end of
this report
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions d the current BC,except as noted above.
ICC Certification #: 8254814
Page 1 of 2
BRAUN Adhesive Anchors Inspection Checklist
I NTE BTEC for Concrete & Masonry
Special inspection shall be in compliance with Section 1701 of the UBC and Section 1704 of the IBC ❑ Codes
UBC 1997
as described below(see Structural Drawings for inspection requirements). ❑IBC 2000
❑IBC 2003
Project Name: Stillwater High School LI IBC 2006
Weather: Partly Sunny Air Temperature: 66 (°F/°C)
Product Name/Manufacturer: Hilti HIT HY 200A
Lot No.: 05460912
ICC-ES Report No.: 3187
"> Adhesive Expiration Date: 01 / / 2017 L'1 Specified Dispenser 0 Specified Mixer
•N
s Discard Initial Adhesive: 2 (#trigger pulls)
a Adhesive Temperature: 66 (°F PC)
Gel Time: 7 min Cure Time: 45 min
(per manufacturers installation instructions)
Type: 0 All-Thread 0 Internally Threaded 0 Torque-Controlled 0 Rebar 0 Other
Material: 1 Standard 0 Stainless Steel OHigh Strength
Steel Grade/Coating: 60
Length: 15 inches (in/mm)
Rod Diameter: 0 3/8" 0 1/2" 0 5/8" 0 3/4" 0 7/8" 0 1" 0 11/4"
Rebar: ❑#3 ❑#4 ❑#5 ❑#6 D#7 ❑#8 ❑#9 ❑#10
❑#11 0 Other
0 Base Material Type: Ia NW Concrete 0 LW Concrete 0 Brick 0 CMU 0 Other
Base Material Strength: 0 2000psi m 3000psi 04000psi ❑Other
Base Material Thickness: 24 inches (in/mm)
Base Material Temperature: 70•F (°F/°C)
o„ Drill Bit Diameter: 1 inch (in/mm) Hole Depth: 6 inches (in/mm)
c
'E (core bit diameter,if approved)
m
u Drill Bit Type: la Carbide-Tip Drill Bit 0 Diamond Core Bit 0 Other
v (ANSI B212.15-1994) (If appropriate and allowed)
= Hole Condition: i Dry 0 Water Saturated 0 Water Filled 0 Under Water
toHole Cleaning: m Compressed Air 0 Hand Pump D Wire brush ❑Nylon Brush 0 Other
Hole cleaning in accordance with manufacturers'printed installation instructions: IA Yes 0 No
0
0
Anchor Application:(please check all that apply) a Tension la Shear ❑Overhead ❑Other
Anchor Insertion: al Twisting motion ❑ Annular gap filled with adhesive ❑Air void free injection
Anchor Spacing: (in/mm) Edge Distance: (in/mm)
Embedment(het): 6 inches (in/mm) Installation Torque(if required):
(ft-lb/Nm)
Completed by: (Signature) Date: 7-8-2016
Kyle Matheson (Print)
Page 2 of 2
w:\FORMS\FORM-Adhesive Anchors Inspection Checklist for Concrete&Masonry
BRAUN Special Inspection Daily Report 36
INTERTEC
1826&odds Road alert Prayet
Saint Paul,M1 55110
Phone:651-487-3245 Stivostar Para Public Schools 131602871
1381 Nortel Rica Skeet Sem*.High School RanoWlona and Additions
St Paul,AM 56117 SWM.slar&OO N
Oak Pads Heights,Mr
Activity Date:07/11/2016 City of:Oak Park Heights Report Number:36
Techniclan:MMheson,Kyle Braun kgertec PM:Mark Flynn Weather:Mostly cloudy 88
Coverage Frequency Notes
Concrete Construction Periodic Reinforcement and concrete placement
A htect/srgnssr authorized chanes to approved plans?No
Work Completed Description:
Observed reinforcement and concrete placement of pit area walls at grids D.19 to D.6-1.3 to 2.3 and footings at s D.19.1.2 to D.6-
1.2.Cemstone concrete wall mix 4666 and footing mix 3067 was placed by pump and consolidated by mechanical vibration.Cast 1 set of
concrete cylinders for each mix placed.
Performed nuclear compaction tests on wall bacldir in zone 12 and piers A-2 to C-2.Tests taken appeared to meet compaction specs
and tests on zone 12 were faring moisture specs.Informed Peterson Co.of results and recommended watering and re-compacting.
Tests Performed:
Concrete test set#46
Nuclear compaction tests
Outstanding discrepancies on this project?:No Report discussed wilth and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
1111.111111bea,
ICC Certification #: 8254814
. Page 1 of 1
BRAUN Special Inspection Daily Report 37
INTERTEC
The leleeeeTen&MOE.
1826 Buerlde Road Client Project
Saint Paul,fvNJ 55110
Phone:651-487-3245 Stillwater kea Public Schools B1602671
1381 North Rice Street Stillwater High School Remotions and Additions
St Paul,AN 55117 Stillwater RAO N
Oak Park Heights,lvN
Activity Date:07/13/2016 City of:Oak Park Heights Report Number.37
Technician:Matheson,Kyle Braun Intertec PM:Mark Flynn Wieather.Clear 80
Coverage Frequency Notes
Concrete Construction Periodic Reinforcement and concrete placement
Soils Periodic Foundation bottoms
Architect/engineer authorized changes to approtied pans?:No
Work Completed Description:
Observed reinforcement and concrete placement of footings at grids C.18-1.2 to C.18-4.3.Cemstone concrete mix 3067 was placed by
chute.Cast 1 set of concrete cylinders for laboratory analysis.
Observed soils and performed hap's on footing bottoms prior to concrete placement Soils consisted of silty sands and appeared
consistent with geotechnical report.
Tests Performed:
Concrete test set#48
Excavation observations
Outstanding discrepancies on this project?:No Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ICC Certification #: 8254814
Page 1 of 1
BRAUN Special Inspection Daily Report n
INTERTEC
1826 Buda.Road aunt Project
Stint Paul,IN 55110
Phone:851-487-3245 SttMrsbrArea Public Schools B1602671
1381 North Rica Swat Starter High School Ramadan and Additions
St Paul,M'l 55117 SlIl sr BL O N
OA Parc Heights,td`l
Activity Date:07/1412016 City of:Oak Park Heights Report Number.38
Technician;Matheson,Kyle Braun kttertec PM:Mark Flynn Mather:Cloudy 72
Coverage Frequency Notes
Concrete Construction Periodic Reinforcement and concrete placement
Architect/engineer authorized charges to sppraad pians?.No
Vlbrk Completed Description:
Observed reinforcement and concrete placement of foundation wall at grids D.15-1.2 to D.6-1.2 and D.6-1.2 to D.6-3.Gemstone
concrete mix 4666 was placed by pump and consolidated by mechanical vibration.Cast 1 set of concrete cylinders for laboratory
analysis.
Tests Performed:
Concrete test set 848
Outstanding discrepancies on this project?:No Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
s�
ICC Certification #: 8254814
Page 1 of 1
BRAUN Special Inspection Daily Report 39
INTERTEC
1826 Buerkie Road Client Project
Saint Paul,k#1455110
Phone:651-487-3245 Stillwater Area Public Schools B1602671
1381 North Rice Street Stillwater High School Reno%adons and Additions
St Paul,NN 55117 S%ilwafer B1W N
Oak Park Heights,MV
Activity Date:07/15/2016 City of:Oak Park Heights Report Number.39
Technician:Matheson,Kyle Braun Intertec PM:Mark Flynn 1Meather.Partly sunny 72
Coverage Frequency Notes
Concrete Construction Periodic Reinforcement and concrete placement
Soils Periodic Foundation bottoms
Architect/engineer authorized changes to approved parrs?:No
Work Completed Description:
Observed reinforcement and concrete placement of foundation wall at grids C.38-1.2 to C-4.3,footings A"-3.5*to HH-30,HH-30 to HH-
26,FF-26 to KK-26,KK-26 to KK-25,JJ-25.1,and EE-25.1.Cemstone wall mix 4666 and mbc 3067 was placed by pump and
consolidated by mechanical vibration.Cast 1 set of concrete cylinders of each mix placed for la ory analysis.
Observed soils and performed dcp's on footing bottoms prior to concrete placement.Soils consisted of poorly graded sand with silt and
appeared consistent with geotechnical report.
Tests Performed:
Concrete test sets#50 and 51
Excavation observations
Outstanding discrepancies on this project?:No Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ec
ICC Certification #: 8254814 '"
Page 1 of 1
BRAUN Special Inspection Daily Report 40
INTERTEC
1826 Bundle Rad Ciera Project
Saint Paul,IN 56110
Phone:651.487.3245 SiiwalyAna Public Schools B1602671
1381 North aloe Street S IMetsr High Schad Remakes and Pdrilons
St Paul,M l 55117 Sfiiwehr BLW N
Cak Park Heights,M
Activity Date:07/2W2016 City of:Oak Park Heights Report Number.40
Tec t:Matheson,Kyle Braun kltertec PM:Mark Flynn Weather:Partly cloudy 85
Coverage Frequency Notes
Concrete Construction Periodic Reinforcement and concrete placement
Masonry Construction Periodic Reinforcement
Architect/ang near authorized changes to appramd pians?No
Work Completed Description:
Observed reinforcement and concrete placement of foundation walls at grids JJ-3.5*to HH-30 and 111+30 to HH-27.2.Cemstone
concrete mix 4666P was placed by pump and consolidated by mechanical vibration.Cut 1 set of concrete cylinders for laboratory
Observed reinforcement of CMJ wails at grids D.05.5.5 to D.17-5.5 at elevation 100'and D.17-5.5 to D.6-5.5 at elevation 110'8'.
Tests Performed:
Concrete test set#52
Masonry observations
Outstanding discrepancies on this project?:No Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
tt
ICC Certification #; 8254814
Page 1 of 1
BRAUN Special Inspection Daily Report 41
INTERTEC
1826 Bueride Road Client Project:
Saint Paul,MJ 55110
Phone:651-487-3245 Stillwater/Tea Public Schools B1602671
1381 North Rice Street Stillwater High School Renovations and Pddltions
St Paul,RM 55117 Stillwater BIM N
Oak Park Heights,RePi
Activity Date:07/21/2016 City of:Oak Park Heights Report Number.41
Technician:Matheson,Kyle Braun Intertec PM:Mark Flynn Mather:Partly cloudy 80
Coverage Frequency Notes
Masonry Construction Periodic Reinforcement and grout placement
Architect/engineer authorized changes to approoed plans?:No
Work Completed Description:
Observed reinforcement and grout placement of CMU wall at grids D.04-5.5 to E-5.5 at precast bearing elevation.Spec mix grout was
mixed on site,placed by buckets,and consolidated by mechanical vibration.Informed contractors and Jeff Moore with Kraus Anderson of
incorrect embeds placed at BP 9 locations.Contractors did not have correct embeds on site that specified two 30"#5 reinforcement
welded to plate.
Discrepancy Description:
Wrong embeds at BP 9 locations.
Tests Performed:
Masonry observations
Outstanding discrepancies on this project?:No Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ICC Certification #: 8254814 "
Page 1 of 2
BRAUN Special Inspection Daily Report 41
INTERTEC
1826 Busies Rosd Client Prcint
Saud Paul,AN 55110
Phone:851-487-3245 Stilwater Area Pubic Schools 81802671
1381 North Rice Stant Sillester ligh School Renovations and Malone
St Paul,It156117 Stiiwalsr WAD N
Chk Park Heights,MN
activity Discrepsncy
Open Discrepancies
Form Spacial Inspections
Activity*:41
Activity Date:07!21/2016
Discrepancy Number:59
Discrepancy Description:Wrong embeds at BP 9 locations.
Page 2 of 2
BRAUN Special Inspection Daily Report 42
INTERTEC
`� theldeeeet,.,kfd Oe.
1826 Buerlde Road alert Project:
Saint Paul,11t4 55110
Phone:651-487-3245 Stillwater Area Public Schools 61602671
1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,NN 55117 Stillwater BLVD N
Oak Park Heights,Md
Activity Date:07/22/2016 City of:Oak Park Heights Report Number.42
Technician:Matheson,Kyle Braun Intertec PM:Mark Flynn Weather.Clear 90
Coverage Frequency Notes
Concrete Construction Periodic Reinforcement and concrete placement
Architect/engineer authorized changes to appraed plans?:No
Work Completed Description:
Observed reinforcement and concrete placement of footing and foundation walls in grids D.6 to E-1.3 to 1.5.Gemstone concrete mix
4666 was placed by bucket and consolidated by mechanical vibration.Cast 1 set of concrete cylinders for laboratory analysis.
Tests Performed:
Concrete test set#54
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ICC Certification #; 8254814"ftirs.
Page 1 of 2
BRAUN Special kispection Daily Report 42
INTERTEC
1826 Busd4s Road Clot Prejset
Saint Rad,bN 55110
Phone:651-487-3245 StillwatarPea Relic Schools B1602671
1381 North Rice Stoat St lmatar High School Ranoaalions and*Mons
St Paul,bN 55117 Stilts lar BLW N
Oak Park Haight',M1
Adivity Discrepancy
Open Discrepancies
Form Special hspsctions
Activity$k 41
Activity Dabs:07/21/2016
Discrepancy Number.59
Discrepancy Desc ipdon:Wrong embeds at BP 9 locations.
Page 2 of 2