Loading...
HomeMy WebLinkAbout18 BRAUN INTERTEC Letter of Transmittal 18 The Science You Build On. Client: Stillwater Area Public Schools Project No: B1602671 Project Name: Stillwater High School Renovations and Additions Date: August 12, 2016 Braun Intertec Corporation 11001 Hampshire Ave. S. Bloomington, MN 55438 To: Kristen Hoheisel Phone: 651-351-3840 Stillwater Area Public Schools Email: Independent School District#834 1875 Greeley St S Stillwater, MN 55082 Re: Stillwater BLVD N, Oak Park Heights, MN 'Documents Sent (Comments Daily Reports Report 1 Copy List Dustin Phillips, Kraus-Anderson Construction Company Jared Olson, BKBM Engineers Jeff Moore, Kraus-Anderson Construction Company Julie Hultman,City of Oak Park Heights Kristy Casper, Kraus-Anderson Construction Company Aaron Fields, BWBR Architects, Inc. Jack Bronczyk, Kraus-Anderson Construction Company Randy LaFaive, Market&Johnson Michael Smunty, BWBR Architects, Inc. Contact Information: Sent By: Laurie Dudero Email: Idudero @ braunintertec.com Phone: (651)487-7003 Rev:05/05/2014 Providing engineering and environmental solutions since 1957 Page 1 of 1 BRAUN I NTE RTEC Daily Field Notes • Project No.: B1602671 Report No.: 1 Location: Stillwater High School Stillwater, MN. Date: August 10, 2016 Personnel Classification Regular Hours Overtime Hours Charles Pelzer Areas and work performed this s day' Braun Intertec personnel performed 1 proof load test on a 3/4" post-installed threaded rod anchor as directed. The anchor was tested using a calibrated hydraulic jack assembly. The anchor was tested in unrestrained tension to 500 lbs. in general accordance with ASTM E488-03 "Standard Test Method for Strength of Anchors in Concrete and Masonry Elements." A representative specified the threaded rod that needed to be tested along with the load the threaded rod needed to be tested too. The load was gradually applied to the rod and held for approximately 90 seconds. The threaded rod and epoxy was tested to the design load of 500 lbs. The rod withstood the load, showing no signs of failure or fatigue. Weather: Sunny Performed By: Charles Pelzer Submitted To: Date: August 10, 2016 Rev. /0/06 • Providing engineering and environmental solutions since 1957