Loading...
HomeMy WebLinkAbout21 BRAUN INTERTEC Letter of Transmittal 21 The Silence You Build On. Client: Stillwater Area Public Schools Project No: B1602671 Project Name: Stillwater High School Renovations and Additions Date: August 17, 2016 Braun Intertec Corporation 11001 Hampshire Ave. S. Bloomington, MN 55438 To: Kristen Hoheisel Phone: 651-351-3840 Stillwater Area Public Schools Email: hoheiselk@stillwaterschools.org Independent School District#834 1875 Greeley St S Stillwater, MN 55082 Re: Stillwater BLVD N, Oak Park Heights, MN Documents Sent (Comments Structural Steel Report 6 'Copy List Dustin Phillips,Kraus-Anderson Construction Company Jared Olson,BKBM Engineers Jeff Moore, Kraus-Anderson Construction Company Julie Hultman,City of Oak Park Heights Kristy Casper,Kraus-Anderson Construction Company Aaron Fields,BWBR Architects, Inc. Jack Bronczyk, Kraus-Anderson Construction Company Randy LaFaive,Market&Johnson Michael Smunty,BWBR Architects, Inc. Contact Information: Sent By: Laurie Dudero Email: Idudero @ braunintertec.com Phone: (651)487-7003 Rev:05/05/2014 Providing engineering and environmental solutions since 1957 BRAUN 6.32.4 Rev.1 Issue:6/23/15 INTERTEC Special Inspection Daily Report City of: Oak Park Heights Page 1 of 1 Report No.: Steel#6 Observation Date: 8/16/2016 Project Name: Stillwater High School&Pony Activity Center Project No.: B1602671 Project Address: Stillwater Blvd. N Braun Intertec PM: M.Flynn Client: ISD#834 Client Project No.: Weather: Sunny Temperature: 70 •F Frequency Inspection Coverage (Notes) Periodic Steel construction Did the architect or engineer authorize changes to approved plans? (If yes,list details below) Description and location of work performed: 1)Performed visual observations of Anchor bolts looking for full nut engagement. Foundations Zone 12 grid A*-D*,2*-11* and EE-HH,26-30. No Discrepancies Noted. 2)Performed observations of A325 TC Bolts in Beam to Beam and Beam to Column connections.2nd level and Roof framing. Zone 12 grid A*-D*,2*-11*and EE-HH,26-30. No Discrepancies Noted. 3)Performed visual observations of fillet welds on Beams to Embeds,Angles to Embeds.2nd level and Roof framing. Zone 12 grid A*-D*,2*-11*and EE-HH,26-30.No Discrepancies Noted. *4)Performed visual observations of fillet welds on Pre-Cast to Pre-Cast and Pre-Cast to Foundation.Wells Concrete connections. Zone 12 grid A*-D*,2*-11*and EE-HH,26-30. It was noted that several connections were missing welds at this time. 2 I List tests performed: Visual •Are there any discrepancies noted from this day's observations? Yes •Are there any outstanding discrepancies on this project? Yes -If yes,see attached Summary Sheet. • Report Discussed with and Given to Contractor? Yes Report Emailed to: Jeff Moore jeff.mooreIkrausanderson.com 612-790-6711 Jack Bronczyk jack.bronczyk@krausanderson.com 612-812-3972 To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable workmanship provisions of the current IBC,except as noted above. Signed: I.D.No.: 5067860 S1&S2 • Providing engineering and environmental solutions since 1957 • Issue Date: 2013101101 Rev No.: 0 BRAUN INTERTEC Summary of Discrepancies Needing Correction or Review by the Design Engineer or Architect Project Name: Stillwater High School Project Address: Stillwater Blvd.N The following items must be reviewed by the engineer and/or corrected and/or inspected before work can continue in the area. Report No. Report Description Resolution to 0/C Status Date Discrepancy *2)Performed visual observations of fillet welds on Pre-Cast to Pre-Cast and Pre-Cast to Foundation.Wells Concrete 2 7-18-16 connections.Area 10 Grid EE-HH, 10-16 and G'-L', 1'-9".It open was noted that Pre-Cast to Foundations connections at grid 16, GG-HH.Are not complete because embeds were missing. *1)Performed visual observations of fillet welds on Pre-Cast 5 8-12 16 planks to Beams and seat angles.Zone 10 2nd and Roof levels. open Grid G'-L', 1'-9'and EE-KK, 10-16.It was noted that welds were missing on connections. *2)Performed visual observations of fillet welds on Wind 5 8-12-16 Bracing.Zone 3.Ground to 2nd level and 2nd level to Roof grid open E-F,5.7-11.It was noted that ground to 2nd level was not welded. *3)Performed visual observations of fillet welds on Bar-Joist to 5 8-12-16 Beams and Seat Angle.Zone 3 Roof level grid E-F,5.7-11.It open was noted that 5 Bar-Joist were not welded. *4)Performed observations of A325 TC Bolts on Zone 3 2nd 5 8-12-16 level and Roof framing.Grid E-F,5.7-11.It was noted that on open Roof level bolts were missing and not snapped. *4)Performed visual observations of fillet welds on Pre-Cast to Pre-Cast and Pre-Cast to Foundation.Wells Concrete 6 8-16-16 connections. Zone 12 grid A*-D*,2*-11*and EE-HH,26-30. open It was noted that several connections were missing welds at this time. Issue Date: 2013/01101 Rev No.: 0 BRAUN INTERTEC Summary of Discrepancies Needing Correction or Review by the Design Engineer or Architect