INTERTEC Letter of Transmittal 22
The Science You Build On.
Client: Stillwater Area Public Schools Project No: B1602671
Project Name: Stillwater High School Renovations and Additions
Date: August 18, 2016 Braun Intertec Corporation
11001 Hampshire Ave. S.
Bloomington, MN 55438
To: Kristen Hoheisel Phone: 651-351-3840
Stillwater Area Public Schools Email: hoheiselk@stillwaterschools.org
Independent School District#834
1875 Greeley St S
Stillwater, MN 55082
Re: Stillwater BLVD N, Oak Park Heights, MN
Documents Sent Comments
Daily Reports Reports 38-42
Special Inspections Reports 43-57
(Copy List
Dustin Phillips, Kraus-Anderson Construction Company Jared Olson, BKBM Engineers
Jeff Moore, Kraus-Anderson Construction Company Julie Hultman,City of Oak Park Heights
Kristy Casper, Kraus-Anderson Construction Company Aaron Fields, BWBR Architects, Inc.
Jack Bronczyk,Kraus-Anderson Construction Company
Randy LaFaive,Market&Johnson
Michael Smunty,BWBR Architects, Inc.
Contact Information:
Sent By: Laurie Dudero
Email: Idudero@braunintertec.com
Phone: (651)487-7003
Rev:05/05/2014 Providing engineering and environmental solutions since 1957
BRAUN Special Inspection Daily Report
43
INTERTEC a
1826 Buedde Road Client Prcisct
Saint Paul,Md 55110
Phone:651-487.3245 Stillwater Area Public Schools 81602671
1381 North Ria Sheet Stillwater High School Renowdions and Maims
St Paul,Irl 55117 Stillwater 8L O N
Oak Park Heights,trl
Activity Dab:07/25/2016 City of:Oak Park Heights Report Number:43
Technician:Matheson,Kyle Braun Intertec PM:Mark Flynn Weather:Clear 85
Coverage Frequency Notes
Concrete Construction Periodic Reinforcement and concrete placement
Architect/engineer authorized charges to approved plans?:No
Work Completed Description:
Observed reinforcement and concrete placement of footings at grids C•-7.9•to C•-5.6*,B'-10.8`to B`-7.1*,foundation wall*4-27 to*4-
26,FF-26 to JJ-26,and JJ-26 to KK-25.Cemstone footing mix 3067 and wall mix 4666 was placed by pump and consolidated by
mechanical vibration.Cast 1 set of concrete cylinders for each mix placed for laboratory analysis.
Tests Performed:
Concrete test sets#55 and 56
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
411111
ICC Certification #: 8254814
Page 1of2 I
1
BRAUN Special Inspection Daily Report 43
INTERTEC
The&NueeYwluldO..
1826 Buerkle Road Client Project:
Saint Paul,MV 55110
Phone:651-487-3245 Stillwater Area Public Schools B1602671
1381 North Rice Sheet Stillwater High School Remotions and Additions
St Paul,MV 55117 Stillwater BLVD N
Oak Park Heights,WN
Activity Discrepancy
Open Discrepancies
Forum Special Inspections
Activity#:41
Activity Date:07/21/2016
Discrepancy Number:59
Discrepancy Description:Wrong embeds at BP 9 locations.
Page 2 of 2
BRAUN Special Inspection Daily Report 44
INTERTEC
1826 Buerae Road Clime Project:
Saint Paul,Md 55110
Phone:651-487-3245 Stillwater Area Public Schools B1602671
1381 North Rice Street Stillwater High School Renovsios and Additions
St Paul,NN 55117 Stillwater BLVD N
Oak Park Heights,M
Activity Date:07/26/2016 City of:Oak Park Heights Report Number.44
Technician:Matheson,Kyle Braun Intertec PM:Mark Flynn Weather.Partly cloudy 85
Coverage Frequency Notes
Concrete Construction Periodic Reinforcement and concrete placement
Architect/engineer authorized changes to approi ed plans?:No
Vlbrk Completed Description:
Observed reinforcement and concrete placement of fc • at grids D*-6*to D*-3.7*,C*4.7*,C*-4*,B*-5.9*to B*-4*,A*-7.1*,K-
5.8*,piers C*-7.1*,B*-7.1*,FF.5-25.1,JJ-25.1,JJ-26,KK- and KK-25.Gemstone wall mix 4666 and footing mix 3067 was placed by
pump and consolidated by mechanical vibration.Cast 1 set of concrete cylinders for each mix placed.Concrete placement scheduled for
2:30 and hed back to 4:30 upon arrival.
Observed proof rod on aggregate base using a fully loaded tandem axel dump truck See attachment for areas observed.Circled areas
observed to have over an inch of deflection and recommended correcting.Other areas appeared to have little to no deflection or rutting.
Tests Performed:
Concrete test sets#57 and 58
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
Photos
See SHS Proof Roll 7-26-16.pdf in the documents section at the end of this
rePort
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ICC Certification #: 8254814
Page 1 of 2
. ,
. •
•
•
'`•..• ' ,
.
.
: : - . It ,,,,,,•,,,,...
. .
)`• / ,
, , ,
,,
1
. i -
. ,
I I 111 ,
„ .. .
,..
.'s,
,
/ . N.,
. , .
'N''...,... /
.
fitiV.
- f
••••:-..1.,
_a-) /...04111$1.41411rtft, it
.., ,
S
-,
- * .r
,
i -
Alb Al& ;S..4 cr
..
4-
11 V
. —
t i I
e I 1
,
4) ,
1
il L
..._....._
. ....__
i : .... :
; _ -
_,...
I : - --T
tt2,_
. .,
CI-)
, ,, 4 4
I
•• I /I , ,A r
/.
/ •
T ; - • --- ---t
_i /:
. . -
i I .. ... 4
.. * .
-..—– ' /
I .. , „
, .? /
.,
. , . • • 1 ,. 1 ti
ill
• 7
-in
" -.!.• 1, e .IS ,t i; ?'
1 ... .
•1 , 4
, ; ' , • . 1 '41.'
I
I
1 ,, •
. ;•:,,,,,
.. ei.
•
t
1 I
i• , I *•.•.„,_
, , , - (--...--) , „ • • B
/ i/
. m _
2 ' -
I. . .
•
• • • •
".: •
.).?
1 /
t4 ,
4 i
• • . . • 3 I I
''''' • •:le.
:''''' • .
, ,..:,--......4,•••
,
-14--4',-,V'-,*. •
,• •
I' • .
• • .
II •. / /
. . i
. • I
. t •I ti
0 144 14 14 li!I 1
il lli ii il il ii
•
J ,..;....
A • •
r", 11 ill 0 li 1 11 .
1 ( tI kiiiii
i' • - t ' . 4 i i ,
I Ig i
. ,
4 ,
1 11
ll N
311 1
1V g
. - - t: 1 • 1 z 1 1 I
•,,,.
- . . • 1
! i •
• .
,
', .1. ,•,.. 1., • •
i a. .I 4 I
, ....,.
1
I ,
,e a
i el a)
OPage 2 of 2
coN ill, i' I, Ili': 1 I If 7•1,,. 1;11i1,
CI
1 I 11 I:i• PI :".*; 11111/1
,,wp .,
BRAUN Special Inspection Daily Report 45
INTERTEC
The Science You Build On.
1826 Buerkle Road Client: Project:
Saint Paul,MJ 55110
Phone:651-487-3245 Stillwater Area Public Schools B1602671
1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,My 55117 Stillwater BL\,1:)N
Oak Park Heights,Md
Activity Date:07/27/2016 City of:Oak Park Heights Report Number:45
Technician:Matheson, Kyle Braun Intertec PM:Mark Flynn Weather:Cloudy/rain 77
Coverage Frequency Notes
Concrete Construction Periodic Reinforcement and concrete placement
Architect/engineer authorized changes to approved plans?: No
Work Completed Description:
Observed reinforcement and concrete placement of piers at grids D*-5.9"to D"-3.7".Cemstone concrete mix 4666 was placed by
bucket and consolidated by mechanical vibration.Cast 1 set of concrete cylinders for laboratory analysis.
Observed proof roll on aggregate base using a fully loaded tandem axel dump truck.Approximately 60'x80'area with rutting and deflection
over the industry standard 1".Informed geo engineer Steve Martin and it was recommended to excavate at an additional 8"of aggregate
base.Area corrected but 2nd proof roll was not observed due to paving taking place same day.Other areas observed appeared to have
to no deflection or rutting.See attachment for area observed and circled area of approximate location of recommended correction.
Tests Performed:
Concrete test set#59
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
Photos
See SHS Roll Test 7-27-16.pdf in the documents section at the end of this report.
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current IBC,except as noted above.
ICC Certification #: 8254814
Page 1 of 3
Ns.
j� : 1, \ 4q�yry'�' \
''a se\
sge
f \
se
1i / N
sse \
S.7
' j •
t_ r
t-
1
1 ' -,N,
A... 1 w _ �
/
/
rev
• , ig r
• s
i -'c`, /
C i LL / f f ��4
r I i ...3 i `
.( /
Id *s I /
11' r f
t • • \\I ! /
.a , `'� p. iii li 1 ii it
_ 2t i, p wil
L; ter„ I � f � ����
:*.
I '!
/t� 1 9 III
f r r 4 �>/,), i ��C YL i C\\ A
u.
!, R .� \ r _ ,JJ._ r X25
fII
tit , , ., L II -
1..) yt ' t
Z
• 1 i o',-.., _ -.._'.\'�.\x•••-••Ot.LIN. Cl X +V•Z ..,'} y
al
i 4i . I _, 0
S v , 1` 1 i'ifi ^n o= ^ Page 2 of 3
o n
A Z
BRAUN Special Inspection Daily Report 45
INTE RTEC
The BdemeYoe Build On.
1826 Bueride Road aient: Project:
Saint Paul,MJ 55110
Phone:651-487-3245 Stillwater Area Public Schools B1602671
1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,NN 55117 Stillwater BLVD N
Oak Park Heights,My
Activity Discrepancy
Open Discrepancies
Form Special Inspections
Activity#:41
Activity Date:07/21/2016
Discrepancy Number:59
Discrepancy Description:Wrong embeds at BP 9 locations.
Page 3 of 3
BRAUN Daily Field Notes
• IN'TERTEC
1826 Buedde Road orient Project:
Saint Paul,NN 55110
Phone:651-487-3245 Stillwater Area Public Scuds B1602671
1381 North Rice Street Stillwater High School Reno alons and Additions
St Paul,FM 55117 Stillwater BOA)N
Oak Park Heights,AN
Activity Date:07/28/2016 PM:Mark Flynn Report Number:37
Temperature:78 Technician:Thomas,Nathaniel Mather:Cloudy
Services Performed:Soil Density Testing/Cylinder Pickup/Other
Describe Other:Bituminous Sample
Density Testing Method:Nuclear-ASTM D6938 Areas Tested:Wall Backfill/Other
Number of tests performed:5 Tests that met density requirements:5
Tests that did not meet density requirements:0 Tests with results pending:0
Fill source:Unknown Type and source of imported fill:
Contractor notified of test results:Yes
Remarks/Comments
1Mere all scheduled activities completed:Yes
Were there any delays affecting our activities:No
Report emailed to client or contractor:No
General Comments:Performed nuclear density testing.All tests appeared to meet project specifications.
Tomas,Nathaniel
Nathaniel
Thomas
Page 1 of 1
BRAUN Special Inspection Daily Report as
INTERTEC
1826 Busdde Road Client: Pray
Saint Paul,AM 55110
Phone:651-487-3245 Stillwater Area Public Schools 81602671
1381 North Rice Street Stith ater High School Renovations and Additions
St Paul,M4 55117 Stiirwtsr BLD N
Oak Park Heights,AM
Activity Date:07/29/2016 City of:Oak Park Heights Report Number:46
Technician:Matheson,Kyle Braun httertec PM:Mark Flynn Weather:Clear 63
Coverage Frequency Notes
Masonry Construction Periodic Reinforcement
Architect/engineer authorized changes to approved plans?:No
V1,rk Completed Description:
Observed reinforcement of CMJ wall at grids C.38-1.2 to C.38-4.2 at elevation 108'.Cast 1 set of mortar cylinders for laboratory analysis.
Performed nuclear compaction tests on interior and exterior wall backfill at grids HH-25 to HH•28.Tests taken appeared to meet
compaction specs.
Tests Performed:
Masonry observations
Mortar test set#1
Nuclear compaction tests
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ICC Certification #: 8254814
Page 1 of 1
BRAUN Special Inspection Daily Report 47
INTERTEC
The 5deKeYou kind On.
1826 Buerlde Road Geri: Project
Saint Paul,Nd 55110
Phone:651487-3245 Stillwater Pres Public Schools B1602671
1381 North Rice Street Stillwater High School Renoretions and Pdditions
St Paul,NN 55117 Stillwater BLVD N
Oak Park Heights,Nd
Activity Date:08/01/2016 City of:Oak Park Heights Report Number:47
Technician:Matheson,Kyle Braun Intertec PM:Mark Flynn Mather:Mostly Cloudy 80
Coverage Frequency Notes
Masonry Construction Periodic Reinforcement and grout placement
Architect/engineer authorized changes to approaed plans?:No
Work Completed Description:
Observed reinforcement and grout placement of CMU wafts at grids E.08-11 to E.08-9 and E.08-9 to E-9 at elevation 100'Spec mix grout
mixed on site from grout tower and placed by buckets.
Tests Performed:
Masonry observations
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ICC Certification #: 8254814
Page 1 of 1
BRAUN Special Inspection Daily Report 48
INTERTEC
1826 Buerlde Road Client Prajeat:
Seat Paul,M4 55110
Phone:651-487-3245 Stillwater Area Public Schools B1602671
1381 North Rice Street Stillwabr High School Reno%ations and Additions
St Paul,MV 55117 Sliiweter BUD N
Oak Park Heights,ts,im
Activity Date:08/02/2016 City of:Oak Park Heights Report Number.48
Technician:Matheson,Kyle Braun Mteertec PM:Mark Flynn VVeather:Mostly cloudy 73
Coverage Frequency Notes
Masonry Construction Periodic Reinforcement and grout placement
Architect/engineer authorized changes to approaed plans?:No
Work Completed Description:
Observed reinforcement and grout placement of CMJ waw at grids C.2-5.5 to C.35-5.5 at precast bearing elevation.Spec mix grout
mixed on site,placed by buckets,and consolidated by mechanical vibration.Cast 1 set of grout prisms for laboratory analysis.
Tests Performed:
Masonry observations
Grout test set#1
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ICC Certification #: 8254814
Page 1 of 1
BRAUN Special Inspection Daily Report
INTERTEC
11001 Hampshire A.enue S Ghent: Project:
Mnneapolis,Md 55438
Phone:952-995-2000 Stillwater Mea Public Schools B1602671
1381 North Rice Street Stillwater High School Renmetions and Additions
St Paul,Md 55117 Stillwater BLED N
Oak Park Height,MV
Activity Date:08/03/2016 City of:Oak Park heights,MN Report Number:49
Technician:Gross,Jason Braun Intertec PM:Mark Flynn Mather:Sunny 78
Coverage Frequency Notes
Special Cases Continuous
Masonry Construction Continuous
Architect/engineer authorized changes to appraed plans?:No
Work Completed Description:
Observed epoxy anchors for dowels between footing,foundation wall and masonry wall Grid 1.05-4.5 to D.6-4.5,D.25 to D.6-4.2 to 4.5.
Contractor placed reinforcing athe 48"O.C.rather than 16"O.C.
Braun spoke with Jared Olson(SER)who said they need 9"embedment for epoxy anchor#5 rebar dowels in this area.(see epoxy
anchors checklist).
Observed reinforcing and grout placement for masonry wall Grid C.4 to C.5-4.3 to 4.5.elevation 108 to 112.
Tests Performed:
Measured hole depth
Visual
Outstanding discrepancies on this project?:No Report discussed with and sent to contractor?:Yes
Photos
See Epoxy Anchor Checklist(1).pdf in the documents section at the end of this
report.
Epoxy anchor checklist
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
:7404-s-/7"
ICC Certification#:5307203
Page 1 of 2
BRAUN Adhesive Anchors Inspection Checklist ,
I NTE RTEC for Concrete & Masonry
Special inspection shall be in compliance with Section 1701 of the UBC and Section 1704 of the IBC
as described below(see Structural Drawings for inspection requirements).
Project Name: Stillwater high school
Weather: Sunny Air Temperature: 82 (°F/°C)
Product Name/Manufacturer: Hillti hit hy200
Lot No.: 0505091.2
ICC-ES Report No.: 3187
Adhesive Expiration Date: 2 / _ / 2017 O Specified Dispenser C3 Specified Mixer
o Discard Initial Adhesive: 3 (#trigger pulls)
a Adhesive Temperature: 78 (°F/°C)
Gel Time: 4 min. Cure Time: 30 min
(per manufacturers installation instructions)
Type: O All-Thread ❑Internally Threaded O Torque-Controlled 0 Rebar O Other
Material: C)Standard O Stainless Steel OHigh Strength
Steel Grade/Coating: 60
Length: 60 (in/mm)
Rod Diameter: ❑3/8" O 1/2" I:3 5/8" ❑3/4" ❑7/8" O 1" la 1 1/4"
Rebar: 0#3 ❑#4 El#5 ❑#6 ❑#7 O#8 ❑#9 ❑#10
O#11 O Other
Base Material Type: 0 NW Concrete O LW Concrete ❑Brick O CMU O Other
0
Base Material Strength: O 2000psi 0 3000psi 04000psi ❑Other
Base Material Thickness: 12„ (in/mm)
Base Material Temperature: 65 (°F/°C)
1
" Drill Bit Diameter: 3/4" (in/mm) Hole Depth: 9.. (in/mm)
c
'E (core bit diameter,if approved)
fp
3 Drill Bit Type: v Carbide-Tip Drill Bit O Diamond Core Bit 0 Other
v (ANSI B212.15-1994) (If appropriate and allowed)
= Hole Condition: 0 Dry 0 Water Saturated ❑Water Filled U Under Water
tzHole Cleaning: 0 Compressed Air 0 Hand Pump l Wire brush ❑Nylon Brush O Other
Hole cleaning in accordance with manufacturers'printed installation instructions: O Yes O No
O
Anchor Application:(please check all that apply) 0 Tension D Shear O Overhead ❑Other
Anchor Insertion: IZI Twisting motion ❑ Annular gap filled with adhesive C'�Air void free injection
Anchor Spacing: 16 (in/mm) Edge Distance: 4' (in/mm)
Embedment /mm) Installation Torque(if required):
(ft-lb/Nm)
Completed by: (Signature) Date: 8/3/2016
Jason L.Gross (Print)
Page 2 of 2
w:\FORMS\FORM-Adhesive Anchors Inspection Checklist for Concrete&Masonry
Issue Date: 2016/07/20 Rev.: 2
I
BRAUN Daily Field Notes
INTERTEC
1826 Buedde Road Chem: Project:
Saint Paul,Md 55110
Phone:651-487-3245 Stillwater Area Public Schools B1602671
1381 North Rice Street Stillwater High School Remotions and Additions
St Paul,M'1 55117 Stillwater BL W N
Oak Park Heights,NN
Activity Date:08/03/2016 PM:Mark Flynn Report Number:38
Temperature:90 Technician:Thomas,Nathaniel Weather:Partly Cloudy
Services Performed:Concrete Testing
Concrete Testing Proposed total yardage:30 Areas Tested:Pavement
placement location:West side parking lot pavement between curbs.
Fresh concrete tests perfumed:Temperature/Slump/Air Content/Cast Cylinders
Contractor notified of test results:Yes
Remarks/Comments
Were all scheduled activities completed:Yes
Were there any delays affecting our activities:No
Report emailed to Went or contractor:No
General Comments:
Observed concrete pour for pavement between curbs.Tested concrete for slump/air/temp and casted cylinders for compressive
strength.All tests appeared to meet project requirements.
Thomas.Nxhauel
Nathaniel
Thomas
Page 1 of 1 •
BRAUN Daily Field Notes
INTERTEC
1826 Buedde Road Client Prcjact:
Saint Paul,bN 55110
Phone:651-487-3245 Stillwater hes Public Schools 81602671
1381 North lice Street Stillwater High School Reno lions and Additions
St Paul,IN 55117 Stillwater BOO N
Oak Park Heights,Md
Activity Dake:08/05/2016 PM:Mark Flynn Report Number.39
Temperature:64 Tedwtidan:Thomas,Nathaniel Weather:Sunny
Services Performed:Concrete Testing
Concrete Testing Proposed total yardage:10 Areas Tested:Pavement
placement location:Sidewalk running along the North side of grids RA to RB.
Fresh concrete tests performed:Temperature/Slump/Air Content/Cast Cylinders
Contractor notified of test results:Yes
Remarks/Comments
Were all scheduled activities completed:Yes
IMare there any delays affecting our activities:No
Report emailed to client or contractor:No
General Comments:
Observed concrete pour for sidewalk along grids RA to RB.Tested concrete for slump/M./temp and casted cylinders for compressive
strength.All tests appeared to meet project requirements.
Thomas,Nathaniel
Nathaniel
Thomas
Page 1of1
BRAUN Special Inspection Daily Report
INTERTEC
The Science You Build 0.
11001 Hampshire A"enue S Client: Project:
Mnneapolis,M1 55438
Phone:952-995-2000 Stillwater Area Public Schools B1602671
1381 North Rice Street Stillwater High School Remetions and Additions
St Paul,MV 55117 Stillwater BLVD N
Oak Park Heights,MJ
Activity Date:08/05/2016 City of:Oak Park heights,MN Report Number:50
Technician:Gross,Jason Braun Intertec PM:Mark Flynn Weather:Partly Cloudy 70
Coverage Frequency Notes
Masonry Construction Continuous
Architect/engineer authorized changes to approtied plans?:No
Work Completed Description:
Observed reinforcing and grout placement for masonry wall Grid C.4 to C.5-4.3 to 4.5 elevation 128 to 132.
Tests Performed:
Visual
Outstanding discrepancies on this project?:No Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ICC Certification it 5307203
Page 1 of 1
BRAUN Special Inspection Daily Report 51
INTERTEC
The SdeoeeYoe IMMO.
1826 Buedde Road Client Prajact:
Saint Paul,AN 55110
Phone:651-487-3245 Stillwater kW Public Schools 81602671
1381 North Rice Street Stillwater High School Renowdions and Additions
St Paul,WM 55117 Stillwater BLVD N
Oak Park Heights,MJ
Activity Date:08/08/2016 City of:Oak Park Heights Report Number:51
Technician:Matheson,Kyle Braun lntertec PM:Mark Flynn Weather:Sunny 74
Coverage Frequency Notes
Masonry Construction Periodic Reinforcement
Architect/engineer authorized changes to approved plans?:No
Work Completed Description:
Observed reinforcement prior to grout placement of CMJ wall at grids D.05-4.5 to D.6-4.5 at elevation 104'.
Tests Performed:
Masonry observations
Outstanding discrepancies on this project?:No Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ICC Certification #: 82548144`"
Page 1 of 1
BRAUN Special Inspection Daily Report 52
INTERTEC
The Science You ldIAOn.
1826 Buedde Road Client Project•
Saint Paul,MJ 55110
Phone:651-487-3245 Stillwater Area Public Scuds B1602671
1381 North Rice Street Stillwater High School Renoretions and Additions
St Paul,Nhl 55117 Stillwater BLVD N
Oak Park Height,MJ
Activity Date:08/09/2016 City of:Oak Park Heights Report Nterber:52
Technician:Matheson,Kyle Braun Intertec PM:Mark Flynn Weather:Mostly cloudy 75
Coverage Frequency Notes
•
Masonry Construction Periodic Reinforcement and grout placement
Architect/engineer authorized changes to apps ed plans?:No
Work Completed Description:
Observed reinforcement and grout placement of CMU wall at grids D.26-4.25 to D.6-4.25 and D.26-4.25 to D.26-4.5 at elevation 104'.
Spec mix grout mixed on site,placed by buckets and consolidated by mechanical vibration.
Observed anchor bolts on Zone 12 that were not at correct projections or embedment.See discrepancy.
Discrepancy Description:
Anchor bolts at grids B*-10.3*2 bolts with 4"projection;at grids FF-7.1*2 bolts with only 4"projection;at grids FF.3-25.1 1 bolt with 7"
projection,at grids KK-26 1 bolt with only 4"projection;at grids KK-25 2 bolts with only 4.5"projection.
Tests Performed:
Masonry observations
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ICC Certification #: 8254814
Page 1 of 2
BRAUN Special Inspection Daily Report 52
INTERTEC
The&dwwYou Build Oe.
1826 BueMe Road Client Project
Saint Paul,AM 55110
Phone:651-487-3245 Stillwater Area Public Schools B1602671
1381 North Rice Sheet Stillwater High School Relolations and Additions
St Paul,AM 55117 StiRwMsr BOO N
Oak Park Heights,AM
Activity Discrepancy
Open Discrepancies
Form Special hspections
Activity#:41
Activity Date:07/21/2016
Discrepancy Number:59
Discrepancy Description:Wrong embeds at BP 9 locations.
Form Special hspections
Activity#:52
Activity Date:08/09/2016
Discrepancy Number:58
Discrepancy Description:
Anchor bolts at grids B*-10.3*2 bolts with 4"projection;at grids FF-7.1*2 bolts with only 4"projection;at grids FF.3-25.1 1 bolt with 7"
projection,at grids KK-26 1 bolt with only 4"projection;at grids KK-25 2 bolts with only 4.5"projection.
Page 2 of 2
II
BRAUN Special Inspection Daily Report 53
' INTERTEC
1826 Buerlde Road Chert Project
Saint Paul,M•155110
Phone:651-487-3245 Stillwater Area Public Schools B1602671
1381 North Rice Street Stillwater ligh School Renovations and Aditions
St Paul,MV 55117 Stillwater BLVD N
Oak Park Heights,M'l
Activity Date:08/10/2016 City of:Oak Park Heights Report Number:53
Technician:Matheson,Kyle Braun Intertec PM:Mark Flynn Weather:Partly cloudy 78
Coverage Frequency Notes
Masonry Construction Periodic Reinforcement and grout placement
Architect/engineer authorized changes to apprcwed plans?:No
Work Completed Description:
Observed reinforcement of CIvi1 wall at grids D.26-4.2 to D.6-4.2 at elevation 112'.Spec mix grout mixed on site,placed by buckets,and
consolidated by mechanical vibration.
Spoke with SER about anchor bolt discrepancy noted in previous days report.Embedment depths and projections are acceptable and
discrepancy of anchor bolt placement can be closed.
Tests Performed:
Masonry observations
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above. 1111111111111
ICC Certification #: 8254814
Page 1 of 2
BRAUN Special Inspection Daily Report 53
INTERTEC
1826 Buer de Road Curt Prajset
Stint Paul,PM 55110
Phone:651-487-3245 Stillwater Area Public Schools B1602671
1381 North liioe Street Stillwater Kph School Renoudions and Additions
St Paul,NN 55117 Stillwater BLVD N
Oak Perk Heights,AM
Activity Discrepancy
Open Discrepancies
Form Special inspections
Activity#:41
Activity Date:07/21/2016
Discrepancy Number.59
Discrepancy Description:Wrong embeds at BP 9 locations.
Closed Discrepancies
Form Special Inspections
Activity#52
Discrepancy Number:58
Activity Date:08/09/2016
Status:Closed
Discrepancy Description:
Anchor bolts at grids B*-10.3`2 bolts with 4"projection;at grids FF-7.1*2 bolts with only 4"projection;at grids FF.3-25.1 1 bolt with 7"
projection,at grids KK-26 1 bolt with only 4"projection;at grids KK-25 2 bolts with only 4.5"projection.
Resolution Date:08/10/2016
Resolution Description:SER approved anchor bolt projections and embedment depths.
Page 2 of 2
BRAUN Special Inspection Daily Report 54
INTERTEC
The Science You Build On.
1826 Buerkle Road orient: Project:
Saint Paul,ARV 55110
Phone:651-487-3245 Stillwater Area Public Schools B1602671
1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,ARV 55117 Stillwater BLVD N
Oak Park Heights,MV
Activity Date:08/12/2016 City of:Oak Park Heights Report Number:54
Technician:Matheson, Kyle Braun Intertec PM:Mark Flynn Weather:Partly cloudy 75
Coverage Frequency Notes
Masonry Construction Periodic Reinforcement
Architect/engineer authorized changes to approved plans?: No
Work Completed Description:
Observed reinforcement of CMU wall at grids D.26-4.2 to D.6-4.2 at elevation 124'.
Observed proof roll on aggregate base of South drive,trails and parking using a fully loaded tandem axel dump truck.Aggregate base still
in the process of being placed on trails at NW corner of stadium.Appeared to be minor to no deflection.See attachment of areas
observed.South edge parking stalls along new athletic fields was not observed due to corrections being performed.
Tests Performed:
Masonry observations
Proof roll
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
Photos
See Proof Roll 8-12-16.pdf in the documents section at the end of this report.
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current IBC,except as noted above.
ICC Certification #: 8254814
Page 1 of 2
•
I u \
1
_moi O...�r� `..,,, , ,
I.
i- 1 *1
I
fi A : '
1
.qa ,� �. •
l'
'• � \` '
, _ .
... n• : 1 .
• cn0 .., 0 0 ` � V
\ t 1 1i , ,_' I®, I1j
��
1
�, I
1 til" �, _�v ,:Iii C ct, , .i..
R
:
:. ,+ i l
::;:.i. /r
1 J'
_ . i + �
t
pp Q;;,, } As :i 0 `\i � i i
orib \\
CU 0 COO 1
i
} i 1 ,
Ta t
g ‘ \ 0 i
fo if�
w .� N
X71 ID W .
He
I`I.
•
03 0
Y ( + 4
� � � ` A Page 2 of 2
X
i
BRAUN Daily Field Notes
• INTERTEC
1826 Buerlde Road alert: Project:
Saint Paul,nM 55110
Phone:651-487-3245 Stillwater Area Public Schools B1602671
1381 North Rice Street Stillwater High School Reraretions and Additions
St Paul,M 155117 Stillwater BLVD N
Oak Park Heights,MJ
Activity Date:08/15/2016 PM:Mark Flynn Report Number:40
Temperature:70 Technidan:Matheson,Kyle Mather:Mostly sunny
Services Performed:Concrete Testing/Proof Roll
Concrete Testing Proposed total yardage:50 Areas Tested:Other
Describe other areas tested:Precast topping
placement location:Zone 10 on 2nd level
Fresh concrete tests performed:Temperature/Slump/Air Content/Cast Cylinders
Contractor notified of test results:Yes
Remarks/Comments
Ware all scheduled activities completed:Yes
Ware there any delays affecting our activities:No
Report emailed to client or contractor:No
General Comments:
Observed proof roll on awregate base on South edge of drive adjacent to new fields from loading dock to drainage rock using a loaded
single axel dump truck.Aweared to be minor to no deflection orrutting.
Observed the placement of precast concrete topping on level 2 in zone 10.Gemstone mix P4595M with fibers was placed using a pump
and buggy.Cast 1 set of concrete cylinders for laboratory analysis.
Concrete test set#62
Kyle Matheson
Page 1 of 1
BRAUN Special Inspection Daily Report 55
INTERTEC
1826 Busdde Road Client Preisct:
Saint Paul,AN 55110
Phone:651-487-3245 StiliwaterArea Public Schools B1602671
1381 North Rae Street Stillwater high School Renovations and Additions
St Paul,NN 55117 Stillwater BLD N
Oak Park heights,MJ
Activity Date:08/16/2016 City of:Oak Park Heights Report Number.55
Technician:Matheson,Kyle Braun lntertec PM:Mark Flynn Weather:Mostly cloudy 82
Coverage Frequency Notes
Masonry Construction Periodic Reinforcement and grout placement
Arctitect/engineer authorized changes to approved plans?:Yes
Work Completed Description:
Observed reinforcement and grout placement of CMU wal at grids D.04-4.5 to D.2-4.5 at elevation 108'.Spec mix grout was placed by
buckets and consolidatedmechanical vibration.
Spoke with Jared Olson(SER)about placing epoxy dowels into precast for 2nd level CMU wail at grids E-5.7 to E.2-5.7.Precast planking
was grouted solid and hook dowels could not be placed per detail 10/361.Received verbal confirmation from Jared that it was acceptable
to place dowels with a 5"embedment using Hit approved epoxy.
Tests Performed:
Masonry observations
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ICC Certification #: 8254814
Page 1 of 1
1
1
BRAUN Daily Field Notes
INTERTEC
1826 Buerkle Road orient Project:
Saint Paul,MV 55110
Phone:651-487-3245 Stillwater Prea Public Schools B1602671
1381 North Rice Street Stillwater High School Renoretions and Pdditions
St Paul,MV 55117 Stillwater BLW N
Oak Park Heights,MV
Activity Date:08/16/2016 PM:Mark Flynn Report Number:41
Temperature:72 Technician:Singer,Zach Weather:Partly sunny
Services Performed:Concrete Testing/Cylinder Pickup
Concrete Testing Proposed total yardage:30 Areas Tested:Sidewalks
Placement location:
0'E to 33'E and 0'N to 6'N,33'E to 54'E 0'N to 9'N of the NE entrance to the football field closest to the tennis court.Sidewalk
leading to door 21S and 22S along with the sidewalk between doors 21S and 22S by the road.
Fresh concrete tests performed:Temperature/Slump/Air Content/Cast Cylinders
Contractor notified of test results:No
Remarks/Comments
Were all scheduled activities completed:Yes
Mire there any delays affecting our activities:No
Report emailed to client or contractor:No
General Comments:
Preformed air entrainment,slump,temperature and cast one set of cylinders on Cemstone mix CPC0415.Tests taken appeared to meet
specs.
Zach Singer
Page 1 of 1
BRAUN Special Inspection Daily Report 56
INTERTEC
The Meow You U M On.
1826 Buedde Road Ciera Project
Saint Paul,k4155110
Phone:651-487-3245 StilMwaterArea Public Schools 81602671
1381 North Rice Street Shwa r High School Reno ons and Additions
St Paul,Md 55117 SWwatar BL%0 N
Oak Park Heights,MJ
Activity Date:08/17/2016 City of:Oak Park Heights Report Number.56
Technician:Matheson,Kyle Braun Intertec PM:Mark Flynn Mather:Partly sunny 65
Coverage Frequency Notes
Special Cases Continuous Adhesive anchors
Architect/engineer authorized changes to approved plans?:Yes
Work Completed Description:
Observed adhesive anchors placed into precast floor for CMJ wall on level 2 from grids E-5.7 to E.2-5.7.Holes appeared to be drilled,
cleaned,and anchors placed in general accordance to MO specs and verbal approval from yesterdays discussion with Jared Olson
(SER).
Tests Performed:
Adhesive anchor observations
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
Photos
See Epoxy Anchor Checklist 8-17-16.pdf in the documents section at the end of
this report.
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
ICC Certification #: 8254814
Page 1 of 2
B RAM H Adhesive Anchors Inspection Checklist
I NTE RTEC for Concrete & Masonry
Special inspection shall be in compliance with Section 1701 of the UBC and Section 1704 of the IBC
as described below(see Structural Drawings for inspection requirements).
Project Name: Stillwater High School
Weather: Partly Sunny Air Temperature: 65 (°F/°C)
Product Name/Manufacturer: Hilti HIT-HY 200 A
Lot No.: 084105L2
ICC-ES Report No.: 3187
Adhesive Expiration Date: 04 / / 2017 Cl Specified Dispenser ❑Specified Mixer
2 Discard Initial Adhesive: 2 (#trigger pulls)
TS
< Adhesive Temperature: 65 (°F/°C)
Gel Time: 7 min Cure Time: 45 min
(per manufacturers installation instructions)
Type: ❑All-Thread ❑Internally Threaded ❑Torque-Controlled 0 Rebar ❑Other
Material: LI Standard ❑Stainless Steel ❑High Strength
Steel Grade/Coating: 60
Length: 70 inch (in/mm)
Rod Diameter: ❑3/8" ❑1/2" ❑5/8" ❑3/4" ❑7/8" ❑1" ❑1 1/4"
Rebar: ❑#3 Ll#4 El#5 ❑#6 ❑#7 ❑#8 ❑#9 ❑#10
❑#11 ❑Other
0 Base Material Type: CI NW Concrete ❑LW Concrete ❑Brick ❑CMU ❑Other
Base Material Strength: ❑2000psi ❑3000psi 04000psi Cl Other unknown/precast plank
Base Material Thickness: 8.25 inch (in/mm)
Base Material Temperature: 65 (°F/°C)
t, Drill Bit Diameter: 3/4 inch (in/mm) Hole Depth: 5 inch (in/mm)
c
'E (core bit diameter,if approved)
ro
Drill Bit Type: v Carbide-Tip Drill Bit ❑ Diamond Core Bit ❑Other
CU (ANSI B212.15-1994) (If appropriate and allowed)
1 Hole Condition: v Dry ❑Water Saturated ❑Water Filled ❑ Under Water
to Hole Cleaning: al Compressed Air ❑Hand Pump O Wire brush ❑Nylon Brush ❑Other
c
Hole cleaning in accordance with manufacturers'printed installation instructions: m Yes ❑No
0
Anchor Application:(please check all that apply) IBJ Tension 0 Shear ❑Overhead ❑Other
0
Anchor Insertion: El Twisting motion Cl Annular gap filled with adhesive ❑Air void free injection
Anchor Spacing: 48 inch (in/mm) Edge Distance: (in/mm)
Embedment(he): 5 inch (in/mm) Installation Torque(if required):
(ft-lb/Nm)
Completed by: (Signature) Date: 8/17/2016
Kyle Matheson (Print)
Page 2 of 2
w:\FORMS\FORM-Adhesive Anchors Inspection Checklist for Concrete&Masonry
Issue Date: 2016/07/20 Rev.: 2
BRAUN Daily Field Notes
INTERTEC
? YO.
1826 BueiWe Road siert: Proi
Saint Paul,Md 55110
Phone:651.487-3245 Stillwater Area Pudic Schools B1602671
1381 North Rice Street Stithwiter Fig,School Reno ons and Addition
St Paul,M4 55117 Stitiviatier BL'.O N
Oak Park Heights,AM
Activity Date:08/17/2016 PM:Mark Flynn Report Number.42
Temperature:65 Technldan:Singer,Zech Weather:Foggy
Services Performed:Concrete Testing/Cylinder Pickup
Concrete Testing Proposed total yardage:6 Areas Tested:Sidewalks
Placement location:
36'E to 45'E and 18'N to curb from door 18S.Also sidewalk entrance on the N side of the W entrance of the parking lot.
Fresh concrete tests performed:Temperature/Slump/Air Content/Cast Cylinders
Contractor notified of test results:No
Remarks/Comments
Were all scheduled activities completed:Yes
IMare there any delays affecting our activities:No
Report emailed to dient or contractor:No
General Comments:
Preformed air entrainment,slump,temperature and cast one set of cylinders,set 64,on Cemstone mix CPC0415.Tests taken appeared
to meet specs.
7(4
Zech Singer
Page 1 of 1
BRAUN Special Inspection Daily Report 57
,INTERTEC
1826 Buedde Road 0 Project:
Saint Paul,Md 55110
Phone:651.487-3245 Stillwater Area Public Schools B1602671
1381 North Roe Street Stillwater High School Renoretions and Additions
St Paul,MV 55117 Std RAO N
Oak Park Heights,M 1
Activity Date:08/18/2016 City of:Oak Park Heights Report Number:57
Technician:Matheson,Kyle Bract Intertec PM:Mark Flynn Mather:Clear 76
Coverage Frequency Notes
Masonry Construction Periodic Reinforcement
Architect/engineer authorized changes to approved plans?:No
Work Completed Description: •
Observed reinforcement after grout placement of CMU wan at grids E-5.7 to E.2-5.7 at elevation 125'6".
Tests Performed:
Masonry observations
Outstanding discrepancies on this project?:Yes Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current BC,except as noted above.
e ,,•0111161111.1111- 111"11111111111111111111111111
ICC Certification #: 8254814
Page 1 of 1