Loading...
HomeMy WebLinkAbout23 BRAUN INTERTEC The Science You Build On. Letter of Transmittal 23 Client: Stillwater Area Public Schools Project No: B1602671 Project Name: Stillwater High School Renovations and Additions Date: August 24, 2016 Braun Intertec Corporation 11001 Hampshire Ave. S. Bloomington, MN 55438 To: Kristen Hoheisel Phone: 651-351-3840 Stillwater Area Public Schools Email: hoheiselk@stillwaterschools.org Independent School District#834 1875 Greeley St S Stillwater, MN 55082 Re: Stillwater BLVD N, Oak Park Heights, MN Documents Sent Comments Asphalt Tests Structural Steel Report 7 Copy List Dustin Phillips,Kraus-Anderson Construction Company Jared Olson, BKBM Engineers Jeff Moore,Kraus-Anderson Construction Company Julie Hultman,City of Oak Park Heights Kristy Casper,Kraus-Anderson Construction Company Aaron Fields, BWBR Architects, Inc. Jack Bronczyk,Kraus-Anderson Construction Company Randy LaFaive, Market&Johnson Michael Smunty, BWBR Architects, Inc. Contact Information: Sent By: Laurie Dudero Email: Idudero @ braunintertec.com Phone: (651)487-7003 Rev:05/05/2014 Providing engineering and environmental solutions since 1957 Braun Intertec Corporation BRAUN 11001 Hampshire Avenue South IN-EF'-E_ Minneapolis,MN 55438 Phone:952.995.2000 Report No:ASP:w1e.005503a1 Asphalt Test Report Issue No: 1 Client: Kristen Hoheisel Laboratory Results Reviewed by: Stillwater Area Public Schools Independent School District#834 Stillwater,MN,55082 Project: B1602671 Stillwater High School Renovations and Additions Stillwater BLVD N Sam Lundquist Oak Park Heights,MN, Laboratory Supervisor TR: Mark Flynn,mflynn@braunintertec.com Date of Issue: 8/2/2016 Sample Details Particle Size Distribution Sample ID: W16-005503-A1 Method: MnDOT 1203-054 Alternate Sample ID: Drying by: Oven Sampled By: Nathan Thomas Date Tested: 8/2/2016 Sampling Method: ASTM D979/AASHTO 1168-Roadway Before Compaction Date Sampled: 7/28/2016 Date Submitted: 7/29/2016 Specification: SPNWB330(R)-MnDOT 2360 Sieve Size %Passing Limits Supplier: Commercial Asphalt 1 in(25.0mm) 100 100 Plant No: Commercial Asphalt-Red Rock %in(19.0mm) 100 97-100 Mix No: 0-2015-040 %In(12.5mm) 95 85-100 Sample Location: Water Collection System Area 3/8in(9.5mm) 89 35-90 No.4(4.75mm) 75 30-80 Other Test Results No.8(2.36mm) 58 25-65 No.16(1.18mm) 42 Description Method Result Limits No.30(600pm) 28 I Finer 75pm(Washing Only)(%) MnDOT 1203-05" 4.6 No.50(300pm) 15 Test Method MnDOT 1853-07^ A No.100(150pm) 8 Test Temperature(°C) 482.0 No.200(75pm) 5.1 2-7 Mix Correction Factor 0.61 Asphalt Content(%) 5.5 • Date Tested 8/1/2016 Chart I i? ! ! F1 ! I-1 t awe Comments "Only ASTM and AASHTO equivalent test methods are covered by our current ISO accreditation. The test results meet the above referenced specifications. For,No:18979.Report No:ASP:W18A0550341 0 2000.2011 QESTLeb by Spec traQEST corn Page 1 of 1 B RAV N 6.32.4 Rev.1 Issue:6/23/15 INTERTEC Special Inspection Daily Report City of: Oak Park Heights Page 1 of 1 Report No.: Steel#7 Observation Date: 8/23/2016 Project Name: Stillwater High School&Pony Activity Center Project No.: B1602671 Project Address: Stillwater Blvd.N Braun Intertec PM: M.Flynn Client: ISD#834 Client Project No.: Weather: Sunny Temperature: 70 °F Frequency Inspection Coverage (Notes) Periodic Steel construction Did the architect or engineer authorize changes to approved plans? (If yes,list details below) Description and location of work performed: 1)Performed visual observations of Anchor bolts looking for full nut engagement. Foundations Zone 1 grid B-D,5-8,and Zone 2 B-D.6,1-5. No Discrepancies Noted. 2)Performed observations of A325 TC Bolts in Beam to Beam and Beam to Column connections.2nd level framing. Zone 1 grid B-D,5-8,Zone 2 grid B-D.6,1-5. No Discrepancies Noted. 3)Performed visual observations of fillet welds on Beams to Embeds,Angles to Embeds. 2nd level framing. Zone 1 grid B- D,5-8,Zone 2 grid B-D.6,1-5.No Discrepancies Noted. 4)Performed visual observations of fillet welds on Bar-Joist to Embeds and Beams and Deck Angle to Bar-Joist and Embeds. Roof framing.Zone 2 grid C.4-D.6,1.2-4.5. No Discrepancies Noted. 5)Performed visual observations of fillet welds on Pre-Cast to Pre-Cast and Pre-Cast to Foundation.Wells Concrete connections. Zone 1 grid B-D,5-8,Zone 2 grid B-D.6,1-5.No Discrepancies Noted. List tests performed: Visual •Are there any discrepancies noted from this day's observations? Yes •Are there any outstanding discrepancies on this project? Yes -If yes,see attached Summary Sheet. •Report Discussed with and Given to Contractor? Yes Report Emailed to: Jeff Moore jeff.moore@krausanderson.com 612-790-6711 Jack Bronczyk jack.bronczyk@krausanderson.com 612-812-3972 To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable workmanship provisions of the current IBC,except as noted above. Signed: Baumann, Troy I.D.No.: 5067860 S1&S2 • Providing engineering and environmental solutions since 1957