Loading...
HomeMy WebLinkAbout34 • • BRAUN I NTE RTEC Letter of Transmittal 34 The Science You Build On Client: Stillwater Area Public Schools Project No: 81602671 Project: Stillwater High School Renovations and Additions Date: November 04, 2016 Braun Intertec Corporation 11001 Hampshire Ave. S. Bloomington, MN 55438 To: Kristen Hoheisel Phone: 651-351-3840 Stillwater Area Public Schools Email: hoheiselk@stillwaterschools.org Independent School District#834 1875 Greeley St S Stillwater, MN 55082 Re: Stillwater BLVD N, Oak Park Heights, MN (Documents Sent Comments Concrete Tests Sets 87-88 (Copy List Jared Olson,BKBM Engineers Jack Bronczyk,Kraus-Anderson Construction Company Daniel Martin,Braun Intertec Corporation Jeff Moore, Kraus-Anderson Construction Company Steven Martin, Braun Intertec Corporation Kristy Casper,Kraus-Anderson Construction Company Aaron Fields,BWBR Architects, Inc. Randy LaFaive,Market&Johnson Michael Smunty, BWBR Architects, Inc. Julie Hultman,City of Oak Park Heights Dustin Phillips,Kraus-Anderson Construction Company Contact Information: Sent By: Laurie Dudero Email: Idudero@braunintertec.com Phone: (651)487-7003 Rev:05/05/2014 Providing engineering and environmental solutions since 1957 BRAUN Com ressive of Concrete Report Date:10/31/2016 INTERTEC Test Method:ASTM C39 StrengthSample:123344 TM!de,oeTonMWOn. 1826 Buerkle Road Client: Project: Saint Paul,MN 55110 Stillwater Area Public Schools B1602671 Phone:651-487-3245 Independent School District#8341875 Greeley St S Stillwater High School Renovations and Additions Stillwater,MN 55082 Stillwater BLVD N Oak Park Heights,MN Sample Details Set#: 87 Technician: Singer,Zach Batched: Specimen Size: 4"X 8" Cast By: Singer,Zach Sampled: 07:10 CDT Specimens In Set: 5 Date Cast: 10/03/16 Cast: 07:25 CDT Truck/Ticket#: 875/03895358 Sampled From: Chute Truck Empty: Contractor: Market and Johnson Placement Method: Pump Placement Time: Location Placement Location: Building Interior-Footing Location Details: At girds D.1 to D.15 between 2.5 and 4.2 also C.4 between 2.5 and 3.6 Sample Location/Notes: At grids D.1-4 Batch Log Specifications Supplier: Gemstone Mix Design: SHS5065 Strength: 4000(psi) Plant: 3 Lakeland,MN Air: Not Required- (%) On-Site Admixtures: None Field Measurements Weather: Clear Slump(in): 6-1/2(ASTM C143) Plastic Unit Weight: Air Temperature(F): 56 Concrete Temp(F): 66(ASTM C1064) Air Content: 2.9(ASTM C231) Load Volume: 10.5(yds) Lab Test Results Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438 Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping Number Age Days Date Cure Days Diameter(in) Area(in2) (Ibs) (psi) Type Remark Method 87-1 7 10/10/16 1/6 4.00 12.57 71,500 5,690 3 1A N 87-2 28 10/31/16 1/27 4.01 12.63 87,960 6,960 3 1B N 87-3 28 10/31/16 1/27 4.01 12.63 85,750 6,790 3 1B N 87-4 28 10/31/16 1/27 4.01 12.63 86,860 6,880 3 1B N 87-5 35 H 11/07/16 1/34 Test Age Average Strengths(psi):7 Day-5690,28 Day-6880 Break Remarks Capping Methods 1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps 1 B:The result meets or exceeds the specified compressive strength. x \ r/1\ ON1)\1\ \ rn TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 Steve Martin 10/31/2016 Page 1 of 1 i BRAUN Compressive Strength of Concrete Report Date:10/31/2016 Sample:123347 INTERTEC Test Method:ASTM C39 Client: Project: 1826 Buerkle Road B1602671 Saint Paul,MN 55110 Stillwater Area Public Schools Phone:651-487-3245 Independent School District#8341875 Greeley St S Stillwater High School Renovations and Additions Stillwater,MN 55082 Stillwater BLVD N Oak Park Heights,MN Sample Details Set#: 88 Technician: Singer,Zach Batched: Specimen Size: 4"X 8" Cast By: Singer,Zach Sampled: 08:00 CDT Specimens In Set: 5 Date Cast: 10/03/16 Cast: 08:15 CDT Truck/Ticket#: 806/3895455 Sampled From: Chute Truck Empty: Contractor: Market and Johnson Placement Method: Pump Placement Time: Location Placement Location: Building Interior-Footing Location Details: At girds D.1 to D.15 between 2.5 and 4.2 also C.4 between 2.5 and 3.6 Sample Location/Notes: At grids D.1-2.7 Batch Log Specifications Supplier: Gemstone Mix Design: SHS5065 Strength: 4000(psi) Plant: 3 Lakeland,MN Air: Not Required- (%) On-Site Admixtures: None l Field Measurements Weather: Clear Slump(in): 6-1/4(ASTM C143) Plastic Unit Weight: Air Temperature(F): 57 Concrete Temp(F): 67(ASTM C1064) Air Content: 4.3(ASTM C231) Load Volume: 10(yds) Lab Test Results Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438 Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping Number Age Days Date Cure Days Diameter(in) Area(In') (lbs) (psi) Type Remark Method 88-1 7 10/10/16 1/6 4.00 12.57 66,840 5,320 4 1A N 88-2 28 10/31/16 1/27 4.01 12.63 81,230 6,430 3 1B N 88-3 28 10/31/16 1/27 4.01 12.63 80,040 6,340 3 1B N 88-4 28 10/31/16 1 /27 4.01 12.63 83,490 6,610 3 1B N 88-5 35 H 11/07/16 1/34 Test Age Average Strengths(psi):7 Day-5320,28 Day-6460 Break Remarks Capping Methods 1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps 1 B:The result meets or exceeds the specified compressive strength. x \ r W\ n TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 Steve Martin 10/31/2016 Page 1 of 1