HomeMy WebLinkAbout41 BRAUN
I NTE BTEC Letter of Transmittal 41
The Science You Build On.
Client: Stillwater Area Public Schools Project No: B1602671
Project: Stillwater High School Renovations and Additions
Date: January 04, 2017 Braun Intertec Corporation
11001 Hampshire Ave. S.
Bloomington, MN 55438
E
To: Kristen Hoheisel Phone: 651-351-3840
Stillwater Area Public Schools Email: hoheiselk@stillwaterschools.org
Independent School District#834
1875 Greeley St S
Stillwater, MN 55082
Re: Stillwater BLVD N, Oak Park Heights, MN
'Documents Sent Comments
Concrete Tests Sets 110&111 (28-Day Break)
Sets 112&113(7-Day Break)
Fireproofing Fireproofing Report 7 dated 12/27116
`Copy List
Jared Olson, BKBM Engineers Jack Bronczyk, Kraus-Anderson Construction Company
Daniel Martin, Braun Intertec Corporation Jeff Moore, Kraus-Anderson Construction Company
Steven Martin, Braun Intertec Corporation Kristy Casper, Kraus-Anderson Construction Company
Aaron Fields, BWBR Architects, Inc. Randy LaFaive, Market&Johnson
Michael Smunty, BWBR Architects, Inc.
Julie Hultman, City of Oak Park Heights
Dustin Phillips, Kraus-Anderson Construction Company
Contact Information:
Sent By: Sarah Madsen
Email: smadsen@braunintertec.corn
Phone:
Rev:05/05/2014 Providing engineering end environmental solutions since 1957
BRAUN Compressive Strength of Concrete Report Date:12/19/2016 '
I NTE RTEC Test Method:ASTM C39 Sample:130493
The Hclenoe You H,Hd O.
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 Independent School District#8341875 Greeley St S Stillwater High School Renovations and Additions
Stillwater,MN 55082 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 110 Technician: Singer,Zach Batched:
Specimen Size: 4"X 8" Cast By: Singer,Zech Sampled: 08:20 CST
Specimens In Set: 5 Date Cast: 11/16/16 Cast: 08:35 CST
Truck/Ticket#: 849/03945712 Sampled From: Chute Truck Empty:
Contractor: Market and Johnson Placement Method: Chute Placement Time:
Location
j Placement Location: Building Interior-Slab on Metal Deck
Location Details: Running track at grids,C to E-5.5 to 5.9
Sample Location/Notes: At girds D.6-5.6
x Lcil .., . $padit<icatidl�
Bitch , ..
Supplier: Cemstone Mix Design: 5065PM Strength: 3500(psi)
Plant: 3 Lakeland,MN Air: Not Required- (%)
On-Site Admixtures: 10.00 Gal Water(10 yd3)
field Moaattrententas £ .a
Weather: Sunny Slump(In): 7-1/2(ASTM C143) Plastic Unk Weight:
Air Temperature(F): 40 Concrete Temp(F): 67(ASTM C1064) Air Content: 2.3(ASTM C231)
Load Volume: 10(yd3)
ab festRes. 1 l ice,
� � _. ._sou-�.w.. .� m _.
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field 1 Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(In') (ibs) (psi) Type Remark Method
110-1 7 11/23/16 1/6 4.01 12.63 69,020 5,470 4 1A N
110-2 28 12/14/16 1/27 4.00 12.57 82,150 6,540 4 1B N
110-3 28 12/14/16 1/27 4.00 12.57 79,540 6,330 3 1B N
110-4 28 12/14/16 1/27 4.00 12.57 84,260 6,700 4 1B N
110-5 35 H 12/21/16 1/34
Test Age Average Strengths(psi):7 Day-5470,28 Day-6520
Break Remarks sapping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1 B:The result meets or exceeds the specified compressive strength.
III i
il
FAR /t\ Ikti t i \ r
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
Steve Martin
12/19/2016
Page 1 of 1
BRAUN Compressive Strength of Concrete Report Date:12/19/2(116
p 9 Sample:130630
I NT E RT E C Test Method:ASTM C39
The scup.Wo Fink]on.
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools 81602671
Phone:651-487-3245 Independent School District#8341875 Greeley St S Stillwater High School Renovations and Additions
Stillwater,MN 55082 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 111 Technician: Thomas,Nathaniel Batched:
Specimen Size: 4"X 8" Cast By: Thomas,Nathaniel Sampled: 15:00 CST
Specimens In Set: 5 Date Cast: 11/16/16 Cast: 15:10 CST
Truck/Ticket#: 743/3946834 Sampled From: Chute Truck Empty:
Contractor: Market and Johnson Placement Method: Buggy Placement Time:
Location yr<
Placement Location: Building Exterior-Stoop
Location Details: Main entrance zone 10,zone 12 adjacent to grids C.7'-12"to 6.7"-12"
Sample Location/Notes: Main entrance zone 10.
-'•'
Specifications
Supplier: Cemstone Mix Design: 5036F Strength: 3500(psi)
Plant: 3 Lakeland,MN Air: 4.5-7,5(%)
On-Site Admixtures: 5.00 Gal Water(7 yd3)
cell 'tilleasstrremj h,
Weather: Clear Slump(in): 5-3/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 57 Concrete Temp(F): 64(ASTM C1064) Alr Content: 7.1(ASTM C231)
Load Volume: 7(yd3)
alb teat Res_plrs
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days, Date Cure Days Diameter(in) Area(Ire) (lbs) (psi) Type Remark Method
111-1 7 11/23/16 1/6 4.01 12.63 66,960 5,300 4 1A N
111-2 28 12/14/16 1/27 4.00 12.57 84,260 6,700 3 1B N
111-3 28 12/14/16 1/27 4.00 12.57 83,210 6,620 3 1B N
111-4 28 12/14/16 1/27 4.00 12.57 82,860 6,590 3 1B N
111-5 35 H 12/21/16 1/34
Test Age Average Strengths(psi):7 Day-5300,28 Day-6640
Break Remarks CappingMsthod M
1A:The test result is for Informational purposes. N:ASTM C1231,Unbonded Caps
1B:The result meets or exceeds the specified compressive strength.
ir..\
>c1i \ r
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
Steve Martin
12/19/2016
Page 1 of 1
BRAUN Compressive Strength of Concrete Report Date:12/19/2016
INTERTEC Test Method:ASTM C39 Sample:132619
The Science Yon Bond On
1826 Buerkle Road Client: Prot:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 Independent School District#8341875 Greeley St S Stillwater High School Renovations and Additions
Stillwater,MN 55082 Stillwater BLVD N
Oak Park Heights,MN
I
Sample petals
Set#: 112 Technician: Matheson,Kyle Batched:
Specimen Size: 4"X 8" Cast By: Matheson,Kyle Sampled: 08:20 CST
Specimens in Set: 5 Date Cast: 12/09/16 Cast: 08:30 CST
Truck/Ticket#: 874/3958630 Sampled From: Chute Truck Empty:
Contractor: Market and Johnson Placement Method: Buggy Placement Time:
Location
Placement Location: Building Interior-Slab on Grade
Location Details: At grids EE to KK.2-16 to 17,FF to KK.2-25 to 26,B'-7.1'to C'-7.1'
Sample Location/Notes: At grids EE-16.2
Batch
Supplier: Gemstone Mix Design: SHS5065 Strength: 4000(psi)
Plant: 3 Lakeland,MN Air: Not Required- (%)
On-Site Admixtures: 1.00 Gal HRWRA-High Range Water Reducing Admixture(11 yd')
field Meeeureitlitlta 5;
Weather: Mostly cloudy/inside Slump(in): 7-1/4(ASTM C143) Plastic Unit Weight:
Alr Temperature(F): 50 Concrete Temp(F): 59(ASTM Cl(>64) Air Content: 4.7(ASTM C231)
Load Volume: 11(yd')
l.ab Telt WffitS
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(In2) (lbs) (psi) Type Remark Method
112-1 7 12/16/16 3/4 4.00 12.57 75,660 6,020 4 1A N
112-2 28 01/06/17 3/25
112-3 28 01/06/17 3/25
112-4 28 01/06/17 3/25
112-5 35 H 01/13/17 3/32 _
Test Age Average Strengths(psi):7 Day-8020
Eke* �g T ,
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
X ' \ 1 `\
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
Steve Martin
12/19/2016
Page 1 of 1
BRAUN Compressive Strength of Concrete Report Date:12/19/2016
I NTE RTEC Test Method:ASTM C39 9 Sample:132753
1M Hti,wYon Had On
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 Independent School District#8341875 Greeley St S Stillwater High School Renovations and Additions
Stillwater,MN 55082 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 113 Technician: Singer,Zech Batched:
Specimen Size: 4"X 8" Cast By: Singer,Zach Sampled: 10:45 CST
Specimens In Set: 5 Date Cast: 12/12/16 Cast: 11:00 CST
Truck/Ticket#: 829/03959367 Sampled From: Chute Truck Empty:
Contractor: Market and Johnson Placement Method: Bucket Placement Time:
Location
Placement Location: Building Exterior-Slab on Grade
Location Details: SOG connecting stoop to interior sog on the SE and SW corner of zone 12 at grids DD.7 to EE-25.1 to 26 and KK.1 to
KK.2-25.1 to 26
Sample Location!Notes: SOG connecting stoop to interior sog on the SW corner of zone 12 at grids DD.7 to EE-25.1 to 26
-Batch Log "
ne
Supplier: Gemstone Mix Design: 5036F Strength: 4500(psi)
Plant: 8 Midway St.Paul,MN Air: 4.5-7.5(%)
On-Site Admixtures: 10.00 Gal Water(6 yd3),24.00 Oz AEA-Air Entraining Admixture(5.5 yd3)
Rad Measurements: ; ,
Weather: Partly sunny Slump(in): 7-1/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 2 Concrete Temp(F): 58(ASTM C1064) Air Content: 5.8(ASTM C231)
Load Volume: 6(yd3)
Test Results §`
Testing Lab:Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Teat Field I Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days, Date Cure Days Diameter(In) Area(Ina) (lbs) (psi) Type Remark Method
113-1 ' 7 12/19/16 1/6 4.01 12.63 45,140 3,570 5 1A N
113-2 28 01/09/17 1/27
113-3 28 01/09/17 1/27
113-4 28 01/09/17 1/27
113-5 35 H , 01/16/17 1/34
Test Age Average Strengths(pal):7 Day-3570
Break Remarks ethods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
X j kik I, \ it
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
Steve Martin
12/19/2016
Page 1 of 1
BRAUN 6.32.4 Rev.1 Issue:6/23/15
I NTE RTEC
Special Inspection Daily Report
City of: Oak Park Heights Page 1 of 1
Report No.: Fireproofing#7 Observation Date: 12/27/2016
Project Name: Stillwater High School& Pony Activity Center Project No.: B1602671
Project Address: Stillwater Blvd. N Braun Intertec PM: D. Martin
Client: ISD#834 Client Project No.:
Weather: Sunny Temperature: 15 "F
Frequency Inspection Coverage (Notes)
Periodic Sprayed fire-resistant materials
Did the architect or engineer authorize changes to approved plans? (If yes,list details below)
Description and location of work performed:
1) Performed visual and Thickness observations of Cafco 300AC spray applied fireproofing on Beams,Columns,Deck and
Angles.Zone 3 Roof level grids E-F,5.5-11.All thickness meet or exceed the thickness requirments supplied by Custom
Drywall. No Discrepancies Noted,
Thickness requirments
Beams 1/2"
Columns 1/2"
Angles 1/2"
Bar-Joist 3/4"
2 Density Sample taken
List tests performed:
Visual
•Are there any discrepancies noted from this day's observations? No
•Are there any outstanding discrepancies on this project? No
-If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor? Yes
Report Emailed to:
Jeff Moore jeff.moore@krausanderson.com 612-790-6711
Jack Bronczyk jack.bronczyk@krausanderson.com 612-812-3972
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current IBC,except as noted above.
--- Baumann, Tro
Signed: f --�''"- Y I.D.No.: 5067860 S1&S2
• Providing engineering and environmental solutions since 1957