HomeMy WebLinkAbout03 BRAUN Special Inspection Daily Report 3
INTERTEC
The Worm You Build On.
1826 Buerkle Road alai Proms:
Saint Paul,MJ 55110
Phone:651487-3245 Stillwater Prea Public Schools B1602671
1381 North Rice Street Stillwater High School Renovations and Pdditions
St Paul,MJ 55117 Stillwater BLVD N
Oak Park Heights,MJ
Activity Date:05/05/2016 City of:Stillwater Report Number:3
Technician:Matheson,Kyle Braun Intertec PM:Mark Flynn Weather:Mostly cloudy 46
Coverage Frequency Notes
Soils Periodic footing bottoms
Architect/engineer authorized changes to apprc ed plans?:No
Work Completed Description:
Performed dcp's on footing bottoms at grids FF-17 to G-8.Soils consisted of silty sands and appeared to be consistent with geotechnical
report.
Tests Performed:
Excavation observations
Outstanding discrepancies on this project?:No Report discussed with and sent to contractor?:Yes
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current IBC,except as noted above.
ICC Certification #: 8254814
Page 1 of 1