Loading...
HomeMy WebLinkAboutUntitled 411 411 • Parking Lot: Paving, 60 stalls, 24, 000 sf, 3 " finish layer w/ 4" asphaltic base and gravel subgrade 1.35/SF 32 , 400 Curbing, 6x18 concrete, 1000 linear feet 7.00/LF 7, 000 Striping, 4" wide .20/LF 1, 500 300 $39,700 Structures: Restroom, storage, warming house building, picnic shelter, 50x75 wood construction 65/SF 3 , 800 247, 000. Footbridges, steel arch type w/ wood deck, 8 feet wide, 60 ' span 50/SF 480 24, 000 . 80 ' span 50/SF 640 32, 000 Landscaping, Signage, and Lighting: (Estimated High Total) *$100,000 Subtotal - Park Facilities/Improvements $769, 680 Land Cost: East Area 16 Acres $43 ,560/Acre 696, 960 West Area 8 Acres $43, 560/Acre 348, 480 • Wetlands 11 Acres 0 0 Subtotal - Land $1, 045,440 TOTAL $1, 815, 120 * Indicates options, types or quantities of items which are currently unknown which will vary depending upon what is chosen by the Park Board/City 3