HomeMy WebLinkAbout1998-07-30 Architect Ltr to OPH Re Preliminary Cost Estimate10249 y ellow circle drive
minnetonka, non. 55343
612-935-6337 fax 612-935-0878
Jul 30, 1998
Mr. Tom Melena
Cit Administrator
Oak Park Hei
14168 North 57h Street
P.O. Box 2007
Oak Park Hei NIN 55082
ENGLOSI&iE 8
M
Re: Surnmar of Preliminar Cost Estimate for Senior Life Communit Valle Senior
Services Alliance, Oak Park Hei
Year Mr. Melena,
Skip Sorensen asked me to forward to y ou the attached cost estimate for the park area done b
our Civil En as well as catalo cuts of pla e for y ou to review. This
e is presentl bein used in Lake Elmo in all parks as well as their present school
projects.
Please for-ward copies to the Parks Commission, Plannin Commission, and Cit Council for their
review. Skip will be re an intake meetin with Scott Richards and Joe Anderlik the week
of Au 10, 1998 at their weekl staff meetin for processin the g eneral development plan
exhibits. Charlie Melcher of Ultei En will also attend.
If y ou have an q uestions, please feel free to contact Skip or m
Sincerel
Dan Neudecker
JOHNSON SHELDON, SORENSEN & HAFNER
ARCHITECTS INC.
cc: Dan Lindh, Charlie Melcher, Barb Barr
19'72 -199'7 - Celebratiia 25 'Y'e.-xrs of Professioziai Ser-rice to 0X11r ClieXits
minnetonka office P17: 612-935-6337 Fax: 612-935-0878 Willmar office Ph: 320-235-7775 Fax: 320-235-8673
CONSULTING ENGINEERS
LfLTE .....¢B�
J u lAy . $ ; .. 8
Mr. Skip Sorenson, AIA
JSSH Architects, Inc.
10249 Yellow Circle Drive
Minnetonka, MN 55343
ULTEIG ENGINEERS, INC
5201 EAST RIVER ROAD, SUITE 308 MINNEAPOLIS, MN 55421
Re. Summary of Preliminary Cost Estimate for Senior Life Community
Valley Senior Service Alliance, Oak Park Heights, MN
UEI Project No. 98729
Dear Skip:
PHONE 612- 571 -2500
FAX 612- 571 -1168
Below summarizes some preliminary cost estimates relating to the line items shown for
the proposed project listed above. These estimates are based on the Concept Plans as
submitted to the City. Our current plan has some adjustments made to the boulevard at
the southern end of the park, and therefore, the total "Greater Park" area will be larger
than that used in these estimates.
1.
Estimated Rough Grading Cost Within the Greater Park
$ 12000
2.
Estimated Cost to Stub Utilities ( Per Location )
$
2
3.
Estimated Cost for walking Path within Greater Park
$
32,000
4.
Estimated Cost For Bituminous, Concrete Curb, Class 5, and
$
23,000
Grading of Parking Lot Near Tot Lot
5.
Light Standards within Tot Lot Parking Lot and Play Area
$
6
6.
Tot Lot Playground Facility and Grading for Play Area
$
20
7.
Twenty ( 20 ) foot Bituminous Fire Lane
$
7,000
8.
Estimated watershed District Permit Fees
S
500
9.
Sodding in Greater Park
$
1 9,000
1 0.
Seeding in Greater Park
$
14,000
1 1.
Sodding Near Tot Lot Park
$
1 6,000
12.
Seeding Near Tot Lot Park
$
2.000
SUBTOTAL $ 261, 500
Contingency ( 1 O ) $ 26
Engineering, Legal, Administrative ( 23 %) $ 66,1 d0
ESTIMATED TOTAL $ 3�3�810
Sincerely,
Charlie F. Melcher, P.E.
o . ect Engineer
G EI
EQUAL OPPORTUNITY EMPLOYER
CONSULTING ENGINEERS
DLTE /G�f�
July 24, 1998
Mr. Skip Sorenson, AIA
JSSH Architects, Inc.
10249 Yellow Circle Drive
Minnetonka, MN 55343
ULTEIG ENGINEERS, INC.
5201 EAST RIVER ROAD, SUITE 308 MINNEAPOLIS, MN 55421
Re. Summary of Preliminary Data for Senior Life Community
Valley Senior Service Alliance, oak Park Heights, MN
UE1 Project No. 98729
Dear Skip:
PHONE 612 - 571 -2500
FAX 612 - 571 -1168
As you requested, below surnmarizes some preliminary information relating to the
proposed project listed above. These figures are based on the Concept Plans as submitted
to the City. As you know, we have made some adjustments to the boulevard at the
southern end, and therefore, the total "Greater Park" area will be larger than shown
below. The boulevard staked in the field is the revised one, creating a larger park.
A. Proposed Greater Park Area = 14.74 Acres
Proposed Boulevard Park Area = 2.52 Acres
B. Estimated Total Bituminous Trail Length for Total Project = 13,200 Lineal Feet
Estimated Bituminous Trail Length Within Greater Park = 3584 Lineal Feet
Estimated Bituminous Trail Length outside Greater Park = 96 Lineal Feet
C. Sum of Existing wetland Areas Within Proposed Greater Park = 3.56 Ac.
D. Proposed Created wetland To Achieve Large wetland in Greater Park = 0.56 Ac.
Proposed Created 'wetland Fringe Areas Within Greater Park ( X 0.75 ) = 1.47 Ac.
Proposed Wetland Credit Areas for Sedimentation Ponds ( X 0.75 } = 1.38 Ac.
Total Proposed Created Wetlands Within the Greater Park Area = 3.41 Ac.
E. Area of Proposed Large Wetland within Greater Park Area( At NWL) =4-12 Ac.
Area of Proposed Large wetland Within Greater Park Area ( At HWL) = 4.89 Ac.
Sincerely,
Charlie F. Melcher, P.E.
Project Engineer