INTE BTEC Letter of Transmittal 45
The Science You BuildOn.
Client: Stillwater Area Public Schools Project No: B1602671
Project: Stillwater High School Renovations and Additions
Date: March 31, 2017 Braun Intertec Corporation
11001 Hampshire Ave. S.
Bloomington, MN 55438
To: Kristen Hoheisel Phone: 651-351-3840
Stillwater Area Public Schools Email: hoheiselk@stiltwaterschools.org
Independent School District#834
1875 Greeley St S
Stillwater, MN 55082
Re: Stillwater BLVD N, Oak Park Heights, MN
[Documents Sent IComments 1
Fireproofing Fireproofing Report 9 dated 3/30/17
Structural Steel Steel Report 14 dated 3/27/17
!Copy List
Jared Olson, BKBM Engineers Jack Bronczyk, Kraus-Anderson Construction Company
Daniel Martin, Braun Intertec Corporation Jeff Moore, Kraus-Anderson Construction Company
Steven Martin, Braun Intertec Corporation Laurie Fronk, Kraus-Anderson Construction Company
Aaron Fields, BWBR Architects, Inc. Randy LaFaive, Market&Johnson
Michael Smunty, BWBR Architects, Inc.
Julie Hultman, City of Oak Park Heights
Dustin Phillips, Kraus-Anderson Construction Company
Contact Information:.
Sent By: Sarah Madsen
Email: smadsen@braunintertec.com
Phone:
Rev:05/05/2014 Providing engineering end environmental solutions since 1957
BRAUN 6.32.4 Rev,1 Issue;6123/15
I NTERTEC
Special Inspection Daily Report
City of: Oak Park Heights Page 1 of 1
Report No.: Fireproofing#9 Observation Date: 3/30/2017
Project Name: Stillwater High School&Pony Activity Center Project No.: B1602671
Project Address: Stillwater Blvd. N Braun intertec PM: D. Martin
Client: ISDN 834 Client Project No.:
Weather: Sunny Temperature: 50 °F
Frequency Inspection Coverage,.i
(Notes)
Periodic Sprayed fire-resistant materials
Did the architect or engineer authorize changes to approved plans? (If yes,list details below)
Description and location of work performed:
1)Performed visual and Thickness observations Flame Seal TB Fire Retardant Coating on Spray foam. Roof Level Zone 1&2
grid A.1,3-8.Thickness meet or exceed the thickness requirements supplied by product manufacture. 17 Mils.No
Discrepancies Noted.
2)Set up Adhesion/Cohesion tests in Zone 1 Roof grid B-C,3-8,Zone 2 Roof grid C.1-C.4,1-4,and Zone 3 Roof grid E-F,5,6-
11.3.
List tests performed:
Visual
•Are there any discrepancies noted from this day's observations? No
•Are there any outstanding discrepancies on this project? No
-If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor? Yes
Report Emalled to:
Jeff Moore jeff.moore@krausanderson.com 612-790-6711
Jack Bronczyk Jack.bronczyk@krausanderson.com 612-812-3972
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current IBC,except as noted above.
Signed: Baumann, troy I.D.No.: 5067860 S1&S2
/(14....,_
• Providing engineering and environmental solutions since 1957
BRAUN 6.32.4 Rev.1 issue:6/23/15
I NTERTEC
Special Inspection Daily Report
City of: Oak Park Heights Page 1 of 1
Report No.: Steel#14 Observation Date: 3/27/2017
Project Name: Stillwater High School&Pony Activity Center Project No.: 131602671
Project Address: Stillwater Blvd. N Braun Intertec PM: D. Martin
Client: ISD#834 Client Project No.:
Weather: Sunny Temperature: 50 •F
Frequency Inspection Coverage (Notes)
Periodic Steel construction
Did the architect or engineer authorize changes to approved plans? No Of yes,list details below)
Description and location of work performed:
1) Performed visual observations of fillet welds on Bar-Joist Reinforcing. Roof Framing Zone 4 grid E-E.1,S.5-1.4. No
Discrepancies Noted.
List tests performed:
Visual
•Are there any discrepancies noted from this day's observations? No
•Are there any outstanding discrepancies on this project? No
-If yes,see attached Summary Sheet.
• Report Discussed with and Given to Contractor? Yes
Report Emailed to:
Jeff Moore jeff.moore@krausanderson.com 612-790-6711
Jack Bronczyk jack.bronczyk@krausanderson.com 612-812-3972
To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable
workmanship provisions of the current IBC,except as noted above.
Signed: Baumann, Troy
I.D.No.: 5067860 S1&S2
Providing engineering and environmental solutions since 1957