Loading...
HomeMy WebLinkAbout45 BRAUN INTE BTEC Letter of Transmittal 45 The Science You BuildOn. Client: Stillwater Area Public Schools Project No: B1602671 Project: Stillwater High School Renovations and Additions Date: March 31, 2017 Braun Intertec Corporation 11001 Hampshire Ave. S. Bloomington, MN 55438 To: Kristen Hoheisel Phone: 651-351-3840 Stillwater Area Public Schools Email: hoheiselk@stiltwaterschools.org Independent School District#834 1875 Greeley St S Stillwater, MN 55082 Re: Stillwater BLVD N, Oak Park Heights, MN [Documents Sent IComments 1 Fireproofing Fireproofing Report 9 dated 3/30/17 Structural Steel Steel Report 14 dated 3/27/17 !Copy List Jared Olson, BKBM Engineers Jack Bronczyk, Kraus-Anderson Construction Company Daniel Martin, Braun Intertec Corporation Jeff Moore, Kraus-Anderson Construction Company Steven Martin, Braun Intertec Corporation Laurie Fronk, Kraus-Anderson Construction Company Aaron Fields, BWBR Architects, Inc. Randy LaFaive, Market&Johnson Michael Smunty, BWBR Architects, Inc. Julie Hultman, City of Oak Park Heights Dustin Phillips, Kraus-Anderson Construction Company Contact Information:. Sent By: Sarah Madsen Email: smadsen@braunintertec.com Phone: Rev:05/05/2014 Providing engineering end environmental solutions since 1957 BRAUN 6.32.4 Rev,1 Issue;6123/15 I NTERTEC Special Inspection Daily Report City of: Oak Park Heights Page 1 of 1 Report No.: Fireproofing#9 Observation Date: 3/30/2017 Project Name: Stillwater High School&Pony Activity Center Project No.: B1602671 Project Address: Stillwater Blvd. N Braun intertec PM: D. Martin Client: ISDN 834 Client Project No.: Weather: Sunny Temperature: 50 °F Frequency Inspection Coverage,.i (Notes) Periodic Sprayed fire-resistant materials Did the architect or engineer authorize changes to approved plans? (If yes,list details below) Description and location of work performed: 1)Performed visual and Thickness observations Flame Seal TB Fire Retardant Coating on Spray foam. Roof Level Zone 1&2 grid A.1,3-8.Thickness meet or exceed the thickness requirements supplied by product manufacture. 17 Mils.No Discrepancies Noted. 2)Set up Adhesion/Cohesion tests in Zone 1 Roof grid B-C,3-8,Zone 2 Roof grid C.1-C.4,1-4,and Zone 3 Roof grid E-F,5,6- 11.3. List tests performed: Visual •Are there any discrepancies noted from this day's observations? No •Are there any outstanding discrepancies on this project? No -If yes,see attached Summary Sheet. • Report Discussed with and Given to Contractor? Yes Report Emalled to: Jeff Moore jeff.moore@krausanderson.com 612-790-6711 Jack Bronczyk Jack.bronczyk@krausanderson.com 612-812-3972 To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable workmanship provisions of the current IBC,except as noted above. Signed: Baumann, troy I.D.No.: 5067860 S1&S2 /(14....,_ • Providing engineering and environmental solutions since 1957 BRAUN 6.32.4 Rev.1 issue:6/23/15 I NTERTEC Special Inspection Daily Report City of: Oak Park Heights Page 1 of 1 Report No.: Steel#14 Observation Date: 3/27/2017 Project Name: Stillwater High School&Pony Activity Center Project No.: 131602671 Project Address: Stillwater Blvd. N Braun Intertec PM: D. Martin Client: ISD#834 Client Project No.: Weather: Sunny Temperature: 50 •F Frequency Inspection Coverage (Notes) Periodic Steel construction Did the architect or engineer authorize changes to approved plans? No Of yes,list details below) Description and location of work performed: 1) Performed visual observations of fillet welds on Bar-Joist Reinforcing. Roof Framing Zone 4 grid E-E.1,S.5-1.4. No Discrepancies Noted. List tests performed: Visual •Are there any discrepancies noted from this day's observations? No •Are there any outstanding discrepancies on this project? No -If yes,see attached Summary Sheet. • Report Discussed with and Given to Contractor? Yes Report Emailed to: Jeff Moore jeff.moore@krausanderson.com 612-790-6711 Jack Bronczyk jack.bronczyk@krausanderson.com 612-812-3972 To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable workmanship provisions of the current IBC,except as noted above. Signed: Baumann, Troy I.D.No.: 5067860 S1&S2 Providing engineering and environmental solutions since 1957