Loading...
HomeMy WebLinkAbout2001-05-10 MN S&WCD Ltr Re WalgreensMINNESOTA FILE COPY WA NGTON SOIL AND WATER G% NSERVATION DISTRICT SOIL AND WATER CONSERVATION DISTRICTS Ma 10, 2001 Mr. Ken Hartun Cit Administrator Cit of Ba 294 North Third Street Ba MN 55003 RE: Proposed Wal project — Cit of Oak Park Hei Dear Ken: 1825 Curve Crest Blvd., Room 101 Stillwater, MN 55082 (651 430-6820 Fax: (651) 430-6819 I 2001 � I 1 I� I� MAYS ---�J FAXED AND MAILED FAX # 439-7188 Our office has received and reviewed the construction plans and specifications dated April 20, 2001, for the proposed Wal project site, located at the existin Bradshaw Funeral Home in Section 34, Town 30 North, Ran 20 West, Cit of Oak Park Hei This project is the redevelopment of an existin propert As part of our review we visited the site and discussed the plans with project representative, Janele Tave of Landform En Since our a has no direct approval authorit over the project, our review is bein made on behalf of the Middle St. Croix Watershed Mana Or Based upon the site conditions observed and the proposed plans we would offer the followin comments: 1 Stormwater Mana There appears to be an increase of 0.36 acres of impervious area for the proposed site. The site is 1.45 acres of which currentl 0.85 acres (59%) is impervious. The proposed project would have 1.21 acres (83%) of impervious surfaces. No water q uantit y or q ualit y pondin is currentl used or proposed for this site. We would recommend that the a on-site, or pg ppl.icant provide water q un l it y / q uanit y ponding document wh on -site ondin is infeasible... If on-site pondin.gr is not feasibh',, then the , aip-pli cant should lement stonrwater best management practices such as ass swales, infiltration trenches and in-line structural stormwater treatment (trade names such as "Ston-nceptor",_"V2B.1_D. Based on m observation of the site and the proposed plan, g rass swales I infiltration trenches and in-line structural stormwater treatment s would ver likel address the incremental increases in stormwater runoff from this site. The followin table summarizes the incremetnal chan in runoff from the pre and post development condition. Walgreens — Oak Park Hei Pre and Post Development Dischar Summar Condition I Year Storm. 2.3" Rain124 hrs 10 Year Ston'n 4.2" Rairb')4 hrs 100 Year Storm 5.9" Rain/24 hrs Development Dischar (Cubic Ft/Sec) 0. 8 2 2. 0 3.80 - Pre Post Development ( Cubic Ft/Sec) - 1.50 1 0 4.90 Difference ( Increase) ( Cubic Ft/Sec & %) 0.68 cfsl,. 1.00 cfs. 43% 1.10cfs,29% AN EQUAL OPPORTUNITY EMPLOYER Mr. Ken Hartun Ma 10, 2001 Pa Two 2 Gradin and Erosion Control Since much of the site work is located adjacent to impervious areas steep slopes and or fra soils erosion control re will need to be closel followed to minimize soil erosion. If a straw mulch is used for tempor must be weed and seed free, It has been our experience that straw or ha bales are not effective in reducin sediment from leavin construction sites. Due to the slopes and sand soil conditions prevalent on this site, we recommend substitutin heav dut ' geotexti le silt fence in p e of the straw or ha "bale checks". We believe that the location of these practices is appropriate, just simpl replace bale checks with silt fence and keep the other existin silt fence as shown. In. the event of concentrated flow leavin the site, we would recommend that the contractor be prepared to place an additional row of silt fence in low areas to minimize sediment from leaving the site. Silt fence alon the project perimeter should remain in place until the site is restored and stabilized. The specifications should re the mechanical anchorin of straw mulch on the contour, however, most e can not operate safel on slopes steeper that 4:1. Therefore, we recommend that all s lopes ste that 4:1 be covered with erosion control mattin such as a wood fiber blanket, instead of straw mulch. I hope that these comments will assist y ou with the review and comment on this project. If y ou have an q uestions, please feel free to call me at 430-6826. Sincerel -r, C, SC r. , Mark J. Doneux, CPE, Water Resource Coordinator cc David Beaudet, Middle St. Croix Watershed Mana Or Tom Malena, Cit of Oak Park Hei JaneleTavecrcria � En g ineerin g , LandformEncrineerincy 0 cr 650 Butler North Buildin 510 First Avenue North C�0� Minneapolis, MN 55043 * Certified Professional in Erosion and Sediment Control E:\wp\wp\WSD\N1SCWN10\Wal 5-10-01 Comment letter.DOC