Loading...
HomeMy WebLinkAbout2001-05-14 BCWD Ltr to Landform EngineeringBROWN'S CREEK lo t WATERS ED DISTRICm 1825 Curve Crest Boulevard, Stillwater, MN 55082 Tel: 651-430-6826 Ma 14, 2001 Ms. Jancle Tave Project Representative Landfon-n En 650 Butler North Buildin 510 First Avenue North Minneapolis,, MN 55043 RE: Proposed Wal pro — Cit of Oak Park Hei Dear Janelle: C�C�C- pb��� �- 12001 �D Fax: 651-43 Our office has received and reviewed the construction plans and specifications dated April 20, 2001, for the proposed Wal project site, located at the existin Bradshaw Funeral Home in Section 34, Town 30 North, Ran 20 West, Cit of Oak Park Hei This project is the redevelopment of an existin propert As part of our review we visited the site and discussed the plans with y ou. In Januar of 2001, the Minnesota Board of Water and Soil Resources approved an Order for the enlar of the BCWD that expands the watershed district's boundar to include the land for the proposed Wal site. However, the BCWD Board of Mana has dela permittin in this new area. Permittin has been dela until issues uni to the enlar area have been resolved with local communities, the precise boundar has been delineated and a upon and pendin resolution of le action b the Middle St. Croix Watershed Mana Or in opposition to the enlar Order. Therefore, while these comments provide a g reater level of compliance with the BCW` Rules, the are advisor and ma be incorporated into approvals b the Cit of Oak Park Hei Based upon the site conditions observed and the proposed plans we would offer the followin comments: 1 Stormwater Mana There appears to be an increase of 0.36 acres of impervious area for the proposed site. The site is 1.45 acres of which currentl 0.85 acres (59%) is impervious. The proposed project would have 1.21 acres (83%) of impervious surfaces. No water q uantit y or q ualit y pondin is currentl used or proposed for this site. We would recommend that the applicant -provide water q ualit y / q uani ty _-pondinv.. on -site ., or document W h y .on-site ponding is infeasible. If on -site ,._p not feasible, then the q pplicant should implement stormwater best mana practices such as grass swales!,-.. infiltration trenches and in-line structural stormwater treatment ( trade names such as "Stormceptor", "V2B I'D.- -Based on m observation of the site and the proposed plan, g rass swales, infiltration trenches and in-line structural stormwater treatment s would ver likel address the incremental increases in ston-nwater runoff from this site. The followin table summarizes the incremetnal chan in runoff from the pre and post development condition. A/lana Crai Leiser, President Karen Kilbercy, Vice-President Don Peterson, CAC Liaison E. J. Gordon., Treasurer * Jerry Turri Secretary N/Is. Jancle'-Fave C7 Ma 14, '200 1 Pa Two Wal — Oak Park Hei Pre and Post Development Dischar Summar Condition I Year Storm 2.3" Rain124 hrs 10 Year Storm 4.2" Rain124 hrs 100 Year Storm 5.9" Rain124 hrs Pre Development Dischar (Cubic Ft/Sec 0.82 2.30 3.80 Post Development ( Cubic Ft/Sec) 11 1.50 3.30 4.90 Difference (Increase (Cubic Ft/Sec & %) 0.68 cfs, 83% 1.00 cfs, 43% 1.10 cfs, 29% 2 Gradin and Erosion Control Since much of the site work is located adjacent to impervious areas, steep slopes and or fra soils erosion control re will need to be closel followed to minimize soil erosion. If a straw mulch is used for temporar protection, it must be weed and seed free. ' It has been our experience that straw or ha bales are not effective in reducin sediment from leavin construction sites. Due to the slopes and sand soil conditions prevalent on this site, we recommend substitutin heav dut eotextile silt fence in place of the straw or ha "bale checks". We believe that the location of these practices is appropriate, just simpl replace bale checks with silt fence and keep the other existin silt fence as shown. In the event of concentrated flow leavin the site, we would recommend that the contractor be pr to,.place an additional row of silt fence in low areas to minimize sediment from leavin the site. Silt fence alon the project perimeter should remain in place until the site is restored and stabilized. The specifications should re the mechanical anchorin of straw mulch on the contour, however, most e can not operate safel on slopes steeper that 4:1. Therefore, we recommend that all slopes steeper that 4:1 be covered with erosion control mattin such as a wood fiber blanket, instead of straw mulch. I hope that these comments will assist y ou with the review and comment on this project. If y ou have an q uestions, please feel free to call me at 430-6826. Sincerel V Mark J. Doneux, CPESC* Administrator cc: David Beaudet, Middle St. Croix Watershed Mana Or Tom Malena, Cit of Oak Park Hei * Certified Professional in Erosion and Sediment Control E-.\wp\wp'\WSD\BCWMO\WD\RULES\permlt\5-14-01 Wal Comment Letter.doc