Loading...
HomeMy WebLinkAbout2017-05-16 OPH Ltr to Mark Dahlke Re City Water Service Connection 0.4 CITY OF OAK PARK HEIGHTS 14168 Oak Park Boulevard No. • P.O.Box 2007 • Oak Park Heights,MN 55082-2007 • Phone:651/439-4439 • Fax:651/439-0574 , .: c?� Hand Delivered May 16, 2017 •.52pin v,11 Mr. Mark Dahlke Dahl-Tech 5805 St. Croix Trail, N. Oak Park Heights, MN 55082 Re: City Water Service Connection—5805 St Croix Trail N. Dear Mr. Dahlke, On April 20, 2017, Public Works Director Kegley and I met with you regarding the connection you made to City water without a permit and to discuss plumbing permit and water meter needs. The City did receive a permit application from Haussner Plumbing to install the meter on April 25, 2017 Note that response was received back from the State Plumbing division on May 1, 2017 that plan review of the connection was required by them. I notified you and Mr. Haussner of this requirement May 1, 2017. I did speak with Mr. Haussner on 5/10 as to the status of the plan being sent to the State. As of that date, he had not been able to find time to get it drawn and stated that he would have it in this week. I have not yet heard from him as to it having been submitted to Mr. Sawyer at the State for review. That being said, Dahl-Tech has been tapped into City Water at least since early February, per the well and boring sealing record I obtained from the MN Dept. of Health. The connection was made without contacting any City Personal, without approval or inspection and is a violation of City Ordinance 1001. While the plan is in the works of preparation and review, the water meter will need to be paid for and installed—no later than Friday May 19,2017. Tree City U.S.A. The water meter and initial installation permit fee due is $516.61. The permit and meter shall be collected and installed by no later than Friday May 19,2017. Public Works Director Kegley should be contacted to verify the meter installation (651) 775-5759. If the meter is not collected, installed and verified as noted above,water service to Dahl Tech will be turned off at the City's main on Monday May 22,2017 until the water meter is installed and recording water usage. The installation of the water meter does not constitute a resolution to the service connection and the plan review from the State and installation permit are still required. The plans shall be remitted to the State for review, this week as indicted by Mr. Haussner and processed. If the Plan review from the State comes back with requirements that differ from the installation performed, the corrective action(s) shall be required. Upon receipt of the State Review and any needed compliance work, a final inspection is to be scheduled for final approval and closure of the matter. Please contact me immediately with any questions. Sincerely, Ju Hultman Building Official c: Eric Johnson, City Administrator Andy Kegley, Public Works Director