Loading...
HomeMy WebLinkAbout50 BRAUN I NTE BTEC Letter of Transmittal 50 The Science You Build On. Client: Stillwater Area Public Schools Project No: 81602671 Project: Stillwater High School Renovations and Additions Date: June 15, 2017 Braun Intertec Corporation 11001 Hampshire Ave. S. Bloomington, MN 55438 To: Kristen Hoheisel Phone: 651-351-3840 Stillwater Area Public Schools Email: hoheiselk@stillwaterschools.org Independent School District#834 1875 Greeley St S Stillwater, MN 55082 Re: Stillwater BLVD N, Oak Park Heights, MN Documents Sent Comments Concrete Tests Sets 137-139(28-Day Break) Sets 140-142(7-Day Break) Copy List Jared Olson, BKBM Engineers Jack Bronczyk, Kraus-Anderson Construction Company Daniel Martin, Braun Intertec Corporation Jeff Moore, Kraus-Anderson Construction Company Steven Martin, Braun Intertec Corporation Laurie Fronk, Kraus-Anderson Construction Company Aaron Fields,BWBR Architects, Inc. Randy LaFaive, Market&Johnson Michael Smunty, BWBR Architects, Inc. Julie Hultman,City of Oak Park Heights Dustin Phillips, Kraus-Anderson Construction Company Contact Information: Sent By: Sarah Madsen Email: smadsen@braunintertec.com Phone: Rev:05/05/2014 Providing engineering and environmental solutions since 1957 BRAUN Compressive Strength of Concrete Report Date: 6/9/20017 INTERTEC Test Method:ASTM C39 The Spence You Hudd On. 1826 Buerkle Road Client: Project: Saint Paul, MN 55110 Stillwater Area Public Schools B1602671 Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions St Paul,MN 55117 Stillwater BLVD N Oak Park Heights, MN Sample Details Set#: 137 Technician: Rous, Derrick Batched: Specimen Size: 4"X 8" Cast By: Rous, Derrick Sampled: 07:45 CDT Specimens In Set: 5 Date Cast: 05/08/17 Cast: 08:00 CDT Truck/Ticket#: 858/4034900 Sampled From: Chute Truck Empty: Contractor: Curb Masters Inc. Placement Method: Buggy Placement Time: Location Placement Location: Paving-Sidewalk Location Details: West end of colored slab south of wide maintenance gate Sample Location/Notes: North east corner of poured portion Batch Log Specifications Supplier: Gemstone Mix Design: 3A3268 Strength: 4500(psi) Plant: 3 Lakeland,MN Air: 4.5-7.5(%) On-Site Admixtures: 12.00 Gal Water(9.5 yd3) Field Measurements Weather: Clear Slump(in): 4-3/4(ASTM C143) Plastic Unit Weight: Air Temperature(F): 47 Concrete Temp(F): 65(ASTM C1064) Air Content: 7.5(ASTM C231) Load Volume: 10(yd3) Lab Test Results Testing Lab: Bloomington, 11001 Hampshire Ave S, Bloomington, MN,55438 Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping Number Age Days Date Cure Days Diameter(in) Area(int) (lbs) (psi) Type Remark Method 137-1 7 05/15/17 2/5 4.00 12.57 39,830 3,170 6 1A N 137-2 28 06/05/17 2/26 4.01 12.63 57,920 4,590 3 1B N 137-3 28 06/05/17 2/26 4.01 12.63 58,930 4,670 2 1B N 137-4 28 06/05/17 2/26 4.01 12.63 58,750 4,650 3 1B N 137-5 35 H 06/12/17 2/33 Test Age Average Strengths(psi):7 Day-3170,28 Day-4640 Break Remarks Capping Methods 1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps 1 B:The result meets or exceeds the specified compressive strength. X I /\ /A \ \ 7 /-. TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 -;,,7 Steve Martin 06/09/2017 Page 1 of 1 BRAUN ress Com ive Stren th of Concrete Report Date:6/9/2017 I NTE RTEC Test Method:ASTM C39 The 6dence You Build On. 1826 Buerkle Road Client: Project: Saint Paul,MN 55110 Stillwater Area Public Schools B1602671 Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions St Paul,MN 55117 Stillwater BLVD N Oak Park Heights,MN Sample Details Set#: 138 Technician: Rous,Derrick Batched: Specimen Size: 4"X 8" Cast By: Rous,Derrick Sampled: 07:40 CDT Specimens In Set: 5 Date Cast: 05/10/17 Cast: 07:55 CDT Truck/Ticket#: 875/4038115 Sampled From: Chute Truck Empty: Contractor: Curb Masters Inc Placement Method: Buggy Placement Time: Location Placement Location: Paving-Sidewalk Location Details: Outer slabs of colored concrete south of entry way in Southwest corner of new building addition. Sample Location/Notes: Northeast corner of east slab Batch Log Specifications Supplier: Cemstone Mix Design: 3A3268 Strength: 4500(psi) Plant: 1 Childs Road St.Paul, Air: 4.5-7.5(%) MN On-Site Admixtures: 10.00 Gal Water(8.5 yd3) Field Measurements Weather: Clear Slump(in): 4(ASTM C143) Plastic Unit Weight: Air Temperature(F): 48 Concrete Temp(F): 69(ASTM C1064) Air Content: 7.4(ASTM C231) Load Volume: 8.5(yd3) Lab Test Results Testing Lab:Bloomington, 11001 Hampshire Ave S,Bloomington,MN,55438 Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method 138-1 7 05/17/17 2/5 4.00 12.57 41,930 3,340 5 1A N 138-2 28 06/07/17 2/26 4.01 12.63 63,280 5,010 3 1B N 138-3 28 06/07/17 2/26 4.01 12.63 61,650 4,880 3 1B N 138-4 28 06/07/17 2/26 4.01 12.63 61,100 4,840 3 1B N 138-5 35 H 06/14/17 2/33 Test Age Average Strengths(psi):7 Day-3340,28 Day-4910 Break Remarks Capping Methods 1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps 1 B:The result meets or exceeds the specified compressive strength. X /\ ,,\)\1\ \ f / \ TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 .„--Z,-__-, 47404-- Steve Martin 06/09/2017 Page 1 of 1 BRAUN Compressive Strength of Concrete Report Date:6/9/2017 INTERTEC Test Method:ASTM C39 Sample: 145009 The Science You Bulla On. 1826 Buerkle Road Client: Project: Saint Paul,MN 55110 Stillwater Area Public Schools B1602671 Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions St Paul,MN 55117 Stillwater BLVD N Oak Park Heights,MN Sample Details Set#: 139 Technician: Westberg,Arik Batched: 06:19 CDT Specimen Size: 4"X 8" Cast By: Westberg,Arik Sampled: 07:25 CDT Specimens In Set: 5 Date Cast: 05/12/17 Cast: 07:30 CDT Truck/Ticket#: 805/4041500 Sampled From: Chute Truck Empty: 07:40 CDT Contractor: Curb Masters Inc Placement Method: Buggy Placement Time: 81 (min) Location Placement Location: Paving-Sidewalk Location Details: Colored walkway slabs on the SW corner of school,south and north of Pony Stadium gates. Sample Location/Notes: Colored slab on the south side of gates.First slab on the west from school. Batch Log Specifications Supplier: Cemstone Mix Design: 3A3268 Strength: 4500(psi) Plant: 1 Childs Road St.Paul, Air: 4.5-7.5(%) MN On-Site Admixtures: None Field Measurements Weather: Sunny Slump(in): 5(ASTM C143) Plastic Unit Weight: Air Temperature(F): 46 Concrete Temp(F): 71 (ASTM C1064) Air Content: 7.4(ASTM C231) Load Volume: 10(yd3) Lab Test Results Testing Lab: Bloomington,11001 Hampshire Ave S, Bloomington, MN,55438 Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method 139-1 7 05/19/17 3/4 4.00 12.57 34,740 2,760 2 1A N 139-2 28 06/09/17 3/25 4.01 12.63 58,210 4,610 5 1B N 139-3 28 06/09/17 3/25 4.01 12.63 55,300 4,380 5 1D N 139-4 28 06/09/17 3/25 4.01 12.63 55,660 4,410 5 1D N 139-5 35 H 06/16/17 3/32 Test Age Average Strengths(psi):7 Day-2760,28 Day-4470 Break Remarks Capping Methods 1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps 1B:The result meets or exceeds the specified compressive strength. 1 D:The test result fails to meet the specified compressive strength. V \ / /\ TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 - /7 Steve Martin 06/09/2017 Page 1 of 1 BRAUN Compressive Strength of Concrete Report Date:6/9/2017 p g Sample: 146974 I NTE RTEC Test Method:ASTM C39 The Science You Build On. 1826 Buerkle Road Client: Project: Saint Paul,MN 55110 Stillwater Area Public Schools B1602671 Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions St Paul,MN 55117 Stillwater BLVD N Oak Park Heights,MN Sample Details Set#: 140 Technician: Rous,Derrick Batched: Specimen Size: 4"X 8" Cast By: Rous,Derrick Sampled: 07:40 CDT Specimens In Set: 5 Date Cast: 05/30/17 Cast: 07:55 CDT Truck/Ticket#: 858/4057298 Sampled From: Chute Truck Empty: Contractor: Curb Masters Placement Method: Buggy Placement Time: Location Placement Location: Paving-Sidewalk Location Details: Colored slab ends along west edge of new builing addition. Sample Location/Notes: Slab end Northeast of archway,next to new building addition. Batch Log Specifications Supplier: Gemstone Mix Design: 3A3268 Strength: 4500(psi) Plant: 1 Childs Road St.Paul, Air: 4.5-7.5(%) MN On-Site Admixtures: None Field Measurements Weather: Cloudy Slump(in): 4-1/4(ASTM C143) Plastic Unit Weight: Air Temperature(F): 52 Concrete Temp(F): 68(ASTM C1064) Air Content: 9.5(ASTM C231) Load Volume: 8(yd3) Lab Test Results Testing Lab:Bloomington, 11001 Hampshire Ave S,Bloomington,MN,55438 Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method 140-1 7 06/06/17 1/6 4.00 12.57 36,880 2,930 5 1A N 140-2 28 06/27/17 1 /27 140-3 28 06/27/17 1 /27 140-4 28 06/27/17 1/27 140-5 35 H 07/04/17 1/34 Test Age Average Strengths(psi):7 Day-2930 Break Remarks Capping Methods 1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps r / \ TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 Steve Martin 06/09/2017 Page 1 of 1 BRAUN Compressive Strength of Concrete Report Date:6/9/2017 INTERTEC Test Method:ASTM C39 Sample: 147141 The Science You Build On. 1826 Buerkle Road Client: Project: Saint Paul, MN 55110 Stillwater Area Public Schools B1602671 Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions St Paul,MN 55117 Stillwater BLVD N Oak Park Heights, MN Sample Details Set#: 141 Technician: Rous, Derrick Batched: Specimen Size: 4"X 8" Cast By: Rous, Derrick Sampled: 07:45 CDT Specimens In Set: 5 Date Cast: 05/31/17 Cast: 08:00 CDT Truck/Ticket#: 829/4058769 Sampled From: Chute Truck Empty: Contractor: Curbmasters Placement Method: Chute Placement Time: Location Placement Location: Paving-Sidewalk Location Details: Outside colored strips,North of Northwest entrance of new building addition. Sample Location/Notes: Southeast corner of East strip,closest to entrance of new building addition Batch Log Specifications Supplier: Gemstone Mix Design: 3A3268 Strength: 4500(psi) Plant: 1 Childs Road St.Paul, Air: 4.5-7.5(%) MN On-Site Admixtures: None Field Measurements Weather: Clear Slump(in): 4(ASTM C143) Plastic Unit Weight: Air Temperature(F): 50 Concrete Temp(F): 65(ASTM C1064) Air Content: 6.7(ASTM C231) Load Volume: 8(yd3) Lab Test Results Testing Lab: Bloomington, 11001 Hampshire Ave S,Bloomington, MN,55438 Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method 141-1 7 06/07/17 1 /6 4.01 12.63 50,140 3,970 5 1A N 141-2 28 06/28/17 1 /27 141-3 28 06/28/17 1 /27 141-4 28 06/28/17 1 /27 141-5 35 H 07/05/17 1 /34 Test Age Average Strengths(psi):7 Day-3970 Break Remarks Capping Methods 1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps X /'\ \ 7N TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 Steve Martin 06/09/2017 Page 1 of 1 BRAUN Compressive Strength of Concrete Report Date:6/9/2017 p g Sample: 147343 I NTE RTEC Test Method:ASTM C39 The scene You Bald Oe. 1826 Buerkle Road Client: Project: Saint Paul,MN 55110 Stillwater Area Public Schools B1602671 Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions St Paul,MN 55117 Stillwater BLVD N Oak Park Heights,MN Sample Details Set#: 142 Technician: Rous,Derrick Batched: Specimen Size: 4"X 8" Cast By: Rous,Derrick Sampled: 07:45 CDT Specimens In Set: 5 Date Cast: 06/01/17 Cast: 08:00 CDT Truck/Ticket#: 875/4060664 Sampled From: Chute Truck Empty: Contractor: Curb Masters Placement Method: Chute Placement Time: Location Placement Location: Paving-Sidewalk Location Details: Center strip at entrance of North West corner of new building edition. Sample Location/Notes: South East corner of center strip. Batch Log Specifications Supplier: Gemstone Mix Design: 3A3268 Strength: 4500(psi) Plant: 1 Childs Road St.Paul, Air: 4.5-7.5(%) MN On-Site Admixtures: None Field Measurements Weather: clear Slump(in): 3-1/2(ASTM C143) Plastic Unit Weight: Air Temperature(F): 60 Concrete Temp(F): 68(ASTM C1064) Air Content: 6.8(ASTM C231) Load Volume: 11 (yd3) Lab Test Results Testing Lab:Bloomington, 11001 Hampshire Ave S,Bloomington,MN,55438 Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping Number Age Days Date Cure Days Diameter(in) Area(int) (lbs) (psi) Type Remark Method 142-1 7 06/08/17 1 /6 4.00 12.57 56,930 4,530 1 1A N 142-2 28 06/29/17 1 /27 142-3 28 06/29/17 1 /27 142-4 28 06/29/17 1 /27 142-5 35 H 07/06/17 1 /34 Test Age Average Strengths(psi):7 Day-4530 Break Remarks Capping Methods 1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps X /\ \ / / TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 Steve Martin 06/09/2017 Page 1 of 1