INTERTEC Letter of Transmittal 51
The Science You Build On.
Client: Stillwater Area Public Schools Project No: B1602671
Project: Stillwater High School Renovations and Additions
Date: July 05, 2017 Braun Intertec Corporation
11001 Hampshire Ave. S.
Bloomington, MN 55438
To: Kristen Hoheisel Phone: 651-351-3840
Stillwater Area Public Schools Email: hoheiselk@stillwaterschools.org
Independent School District#834
1875 Greeley St S
Stillwater, MN 55082
Re: Stillwater BLVD N, Oak Park Heights, MN
Documents Sent Comments
Concrete Tests Sets 140-142 (28-Day Break)
Copy List
Jared Olson, BKBM Engineers Jack Bronczyk, Kraus-Anderson Construction Company
Daniel Martin, Braun Intertec Corporation Jeff Moore, Kraus-Anderson Construction Company
Steven Martin, Braun Intertec Corporation Laurie Fronk, Kraus-Anderson Construction Company
Aaron Fields, BWBR Architects, Inc. Randy LaFaive, Market&Johnson
Michael Smunty, BWBR Architects, Inc.
Julie Hultman,City of Oak Park Heights
Dustin Phillips, Kraus-Anderson Construction Company
Contact Information:
Sent By: Sarah Madsen
Email: smadsen@braunintertec.com
Phone:
Rev:05/05/2014 Providing engineering and environmental solutions since 1957
BRAUN Compressive Strength of Concrete Report Date:6/28/2017
INTERTEC Test Method:ASTM C39 Sample: 146974
The smeuee You Build On
1826 Buerkle Road Client: Project:
Saint Paul, MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 140 Technician: Rous,Derrick Batched:
Specimen Size: 4"X 8" Cast By: Rous,Derrick Sampled: 07:40 CDT
Specimens In Set: 5 Date Cast: 05/30/17 Cast: 07:55 CDT
Truck/Ticket#: 858/4057298 Sampled From: Chute Truck Empty:
Contractor: Curb Masters Placement Method: Buggy Placement Time:
Location
Placement Location: Paving-Sidewalk
Location Details: Colored slab ends along west edge of new builing addition.
Sample Location/Notes: Slab end Northeast of archway,next to new building addition.
Batch Log Specifications
Supplier: Gemstone Mix Design: 3A3268 Strength: 4500(psi)
Plant: 1 Childs Road St.Paul, Air: 4.5-7.5(%)
MN
On-Site Admixtures: None
Field Measurements
Weather: Cloudy Slump(in): 4-1/4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 52 Concrete Temp(F): 68(ASTM C1064) Air Content: 9.5(ASTM C231)
Load Volume: 8(yd3)
Lab Test Results
Testing Lab: Bloomington, 11001 Hampshire Ave S,Bloomington, MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in,) (lbs) (psi) Type Remark Method
140-1 7 06/06/17 1/6 4.00 12.57 36,880 2,930 5 1A N
140-2 28 06/27/17 1 /27 4.00 12.57 58,990 4,690 3 1B N
140-3 28 06/27/17 1 /27 4.00 12.57 58,340 4,640 2 1B N
140-4 28 06/27/17 _ 1 /27 4.00 12.57 59,480 4,730 3 1B N
140-5 35 H 07/04/17 1 /34
Test Age Average Strengths(psi):7 Day-2930,28 Day-4690
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1 B:The result meets or exceeds the specified compressive strength.
X ,\ \ / / \
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
Steve Martin
06/28/2017
Page 1 of 1
BRAUN Compressive Strength of Concrete Report Date:6/28/2017
p g Sample: 147141
INTERTEC
Test Method:ASTM C39
The Science You Build On.
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 141 Technician: Rous,Derrick Batched:
Specimen Size: 4"X 8" Cast By: Rous,Derrick Sampled: 07:45 CDT
Specimens In Set: 5 Date Cast: 05/31/17 Cast: 08:00 CDT
Truck/Ticket#: 829/4058769 Sampled From: Chute Truck Empty:
Contractor: Curbmasters Placement Method: Chute Placement Time:
Location
Placement Location: Paving-Sidewalk
Location Details: Outside colored strips, North of Northwest entrance of new building addition.
Sample Location/Notes: Southeast corner of East strip,closest to entrance of new building addition
Batch Log Specifications
Supplier: Gemstone Mix Design: 3A3268 Strength: 4500(psi)
Plant: 1 Childs Road St.Paul, Air: 4.5-7.5(%)
MN
On-Site Admixtures: None
Field Measurements
Weather: Clear Slump(in): 4(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 50 Concrete Temp(F): 65(ASTM C1064) Air Content: 6.7(ASTM C231)
Load Volume: 8(yd3)
Lab Test Results
Testing Lab: Bloomington,11001 Hampshire Ave S,Bloomington,MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method
141-1 7 06/07/17 1 /6 4.01 12.63 50,140 3,970 5 _ 1A N
141-2 28 06/28/17 1 /27 4.00 12.57 72,260 5,750 2 1B N
141-3 28 06/28/17 1 /27 4.00 12.57 69,060 5,490 2 1B N
141-4 28 06/28/17 1 /27 4.00 12.57 70,220 5,590 _ 3 1B N
141-5 35 H 07/05/17 1 /34
Test Age Average Strengths(psi):7 Day-3970,28 Day-5610
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1B:The result meets or exceeds the specifiedficompressive strength.
X \ / /
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
Steve Martin
06/28/2017
Page 1 of 1
BRAUN Compressive Strength of Concrete Report Date:6/30/2017
INTERTEC Test Method:ASTM C39 Sample: 147343
The Science You Budd On.
1826 Buerkle Road Client: Project:
Saint Paul,MN 55110 Stillwater Area Public Schools B1602671
Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions
St Paul,MN 55117 Stillwater BLVD N
Oak Park Heights,MN
Sample Details
Set#: 142 Technician: Rous,Derrick Batched:
Specimen Size: 4"X 8" Cast By: Rous,Derrick Sampled: 07:45 CDT
Specimens In Set: 5 Date Cast: 06/01/17 Cast: 08:00 CDT
Truck/Ticket#: 875/4060664 Sampled From: Chute Truck Empty:
Contractor: Curb Masters Placement Method: Chute Placement Time:
Location
Placement Location: Paving-Sidewalk
Location Details: Center strip at entrance of North West corner of new building edition.
Sample Location/Notes: South East corner of center strip.
Batch Log Specifications
Supplier: Cemstone Mix Design: 3A3268 Strength: 4500(psi)
Plant: 1 Childs Road St.Paul, Air: 4.5-7.5(%)
MN
On-Site Admixtures: None
Field Measurements
Weather: clear Slump(in): 3-1/2(ASTM C143) Plastic Unit Weight:
Air Temperature(F): 60 Concrete Temp(F): 68(ASTM C1064) Air Content: 6.8(ASTM C231)
Load Volume: 11 (yd3)
Lab Test Results
Testing Lab: Bloomington,11001 Hampshire Ave S,Bloomington, MN,55438
Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping
Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method
142-1 7 06/08/17 1/6 4.00 12.57 56,930 _ 4,530 1 1A N
142-2 28 06/29/17 1 /27 4.00 12.57 73,540 5,850 3 1B N
142-3 28 06/29/17 1 /27 4.00 12.57 75,630 6,020 5 1B N
142-4 28 06/29/17 1 /27 4.00 12.57 75,950 6,040 3 1B N
142-5 35 H 07/06/17 1 /34
Test Age Average Strengths(psi):7 Day-4530,28 Day-5970
Break Remarks Capping Methods
1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps
1 B:The result meets or exceeds the specified compressive strength.
X 2\ \A\ \ / 7
TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6
Steve Martin
06/30/2017
Page 1 of 1