Loading...
HomeMy WebLinkAbout52 BRAUN I NTE BTEC Letter of Transmittal 52 The Science You Build On. Client: Stillwater Area Public Schools Project No: B1602671 Project: Stillwater High School Renovations and Additions Date: July 14, 2017 Braun Intertec Corporation 11001 Hampshire Ave. S. Bloomington, MN 55438 To: Kristen Hoheisel Phone: 651-351-3840 Stillwater Area Public Schools Email: hoheiselk@stillwaterschools.org Independent School District#834 1875 Greeley St S Stillwater, MN 55082 Re: Stillwater BLVD N, Oak Park Heights, MN 'Documents Sent Comments Concrete Tests Set 139(56-Day Break) 'Copy List Jared Olson, BKBM Engineers Jack Bronczyk, Kraus-Anderson Construction Company Daniel Martin, Braun Intertec Corporation Jeff Moore, Kraus-Anderson Construction Company Steven Martin, Braun Intertec Corporation Laurie Fronk, Kraus-Anderson Construction Company Aaron Fields, BWBR Architects, Inc. Randy LaFaive, Market&Johnson Michael Smunty, BWBR Architects, Inc. Julie Hultman,City of Oak Park Heights Dustin Phillips, Kraus-Anderson Construction Company Contact Information: Sent By: Sarah Madsen Email: smadsen@braunintertec.com Phone: Rev:05/05/2014 Providing engineering and environmental solutions since 1957 BRAUN Compressive Strength of Concrete Report Date:7/7/2Sample017 INTERTEC Test Method:ASTM C39 T1ie Science You Bulk!On. 1826 Buerkle Road Client: Project: Saint Paul,MN 55110 Stillwater Area Public Schools B1602671 Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions St Paul,MN 55117 Stillwater BLVD N Oak Park Heights,MN Sample Details Set#: 139 Technician: Westberg,Arik Batched: 06:19 CDT Specimen Size: 4"X 8" Cast By: Westberg,Arik Sampled: 07:25 CDT Specimens In Set: 5 Date Cast: 05/12/17 Cast: 07:30 CDT Truck/Ticket#: 805/4041 500 Sampled From: Chute Truck Empty: 07:40 CDT Contractor: Curb Masters Inc Placement Method: Buggy Placement Time: 81 (min) Location Placement Location: Paving-Sidewalk Location Details: Colored walkway slabs on the SW corner of school,south and north of Pony Stadium gates. Sample Location/Notes: Colored slab on the south side of gates.First slab on the west from school. Batch Log Specifications Supplier: Cemstone Mix Design: 3A3268 Strength: 4500(psi) Plant: 1 Childs Road St.Paul, Air: 4.5-7.5(%) MN On-Site Admixtures: None Field Measurements Weather: Sunny Slump(in): 5(ASTM C143) Plastic Unit Weight: Air Temperature(F): 46 Concrete Temp(F): 71 (ASTM C1064) Air Content: 7.4(ASTM C231) Load Volume: 10(yd3) Lab Test Results Testing Lab: Bloomington, 11001 Hampshire Ave S,Bloomington,MN,55438 Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping Number Age Days Date Cure Days Diameter(in) Area(int) (lbs) (psi) Type Remark Method 139-1 7 05/19/17 3/4 4.00 12.57 34,740 2,760 2 1A N 139-2 28 06/09/17 3/25 4.01 12.63 58,210 4,610 5 1B N 139-3 28 06/09/17 3/25 4.01 12.63 55,300 4,380 5 1D N 139-4 28 06/09/17 3/25 4.01 12.63 55,660 4,410 5 1D N 139-5 56 H 07/07/17 3/53 4.00 12.57 61,780 4,920 4 1B N Test Age Average Strengths(psi):7 Day-2760,28 Day-4470,56 Day-4920 Break Remarks Capping Methods 1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps 1B:The result meets or exceeds the specified compressive strength. 1 D:The test result fails to meet the specified compressive strength. X /\,\, 1Z \ / / 1 TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 Steve Martin 07/07/2017 Page 1 of 1