Loading...
HomeMy WebLinkAbout55 BRAUN IITERTE Letter of Transmittal 55 The Science You Build On. Client: Stillwater Area Public Schools Project No: B1602671 Project: Stillwater High School Renovations and Additions Date: September 07, 2017 Braun Intertec Corporation 11001 Hampshire Ave. S. Bloomington, MN 55438 To: Kristen Hoheisel Phone: 651-351-3840 Stillwater Area Public Schools Email: hoheiselk@stillwaterschools.org Independent School District#834 1875 Greeley St S Stillwater, MN 55082 Re: Stillwater BLVD N, Oak Park Heights, MN Documents Sent 'Comments Concrete Tests Set 144(28-Day Break) Copy List Jared Olson, BKBM Engineers Jack Bronczyk, Kraus-Anderson Construction Company Daniel Martin, Braun Intertec Corporation Jeff Moore, Kraus-Anderson Construction Company Steven Martin, Braun Intertec Corporation Laurie Fronk, Kraus-Anderson Construction Company Aaron Fields, BWBR Architects, Inc. Randy LaFaive, Market&Johnson Michael Smunty, BWBR Architects, Inc. Julie Hultman,City of Oak Park Heights Dustin Phillips, Kraus-Anderson Construction Company Contact Information: Sent By: Sarah Madsen Email: smadsen@braunintertec.com Phone: Rev:05/05/2014 Providing engineering and environmental solutions since 1957 BRAUN Compressive Strength of Concrete Report Date:8/18/2017 INTERTEC Test Method:ASTM C39 Sample:153231 T eStle,weY Bu/1d On. 1826 Buerkle Road Client: Project: Saint Paul,MN 55110 Stillwater Area Public Schools B1602671 Phone:651-487-3245 1381 North Rice Street Stillwater High School Renovations and Additions St Paul,MN 55117 Stillwater BLVD N Oak Park Heights,MN Sample Details Set#: 144 Technician: Gavin,Nicholas Batched: Specimen Size: 4"X 8" Cast By: Gavin,Nicholas Sampled: 10:30 CDT Specimens In Set: 5 Date Cast: 07/14/17 Cast: 10:45 CDT Truck/Ticket#: 831 /411617 Sampled From: Chute Truck Empty: Contractor: Market&Johnson INC. Placement Method: Buggy Placement Time: Location Placement Location: Building Interior- Location Details: Slab on grade around pit Sample Location/Notes: Slab on grade around pit Batch Log Specifications Supplier: Cemstone Mix Design: SHS4545 Strength: 4000(psi) Plant: 1 Childs Road St.Paul, Air: Not Required- (%) MN On-Site Admixtures: None Field Measurements Weather: Cloudy Slump(in): 5(ASTM C143) Plastic Unit Weight: Air Temperature(F): 71 Concrete Temp(F): 73(ASTM C1064) Air Content: 2.1 (ASTM C231) Load Volume: 10(yd3) Lab Test Results Testing Lab: Bloomington,11001 Hampshire Ave S,Bloomington, MN,55438 Specimen Test Test Field/Lab Average Cylinder Cylinder Max Load Strength Fracture Break Capping Number Age Days Date Cure Days Diameter(in) Area(in2) (lbs) (psi) Type Remark Method 144-1 7 07/21/17 3/4 4.00 12.57 53,600 4,260 6 1A N 144-2 28 08/11/17 3/25 4.00 12.57 78,540 6,250 4 1B N 144-3 28 08/11/17 3/25 4.00 12.57 76,380 6,080 1 1B N 144-4 28 08/11/17 3/25 4.00 12.57 69,920 5,560 1 1B N 144-5 35 H 08/18/17 3/32 Test Age Average Strengths(psi):7 Day-4260,28 Day-5960 Break Remarks Capping Methods 1A:The test result is for informational purposes. N:ASTM C1231,Unbonded Caps 1B:The result meets or exceeds the specified compressive strength. X ,i \ 7 7 \ \A ti TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 Steve Martin 08/18/2017 Page 1 of 1