BROWN'S CREEK WATERSHED DISTRICT
PERMIT NO. 17-13
Menards Expansion Erosion Control—5800 Krueger Lane N,Oak Park Heights,MN
Property Owner: Troy Anderson,Menards Date: September 11,2017
Address: 5101 Menard Drive Telephone: 716-876-2226
City/Zip: Eau Claire,WI 54703
Project Location: 5800 Krueger Lane N, Oak Park Heights,MN
Affected Rules: Erosion Control (3.0)
Work Authorized: Permission is granted to do the work described in the documents referenced in Table 1 and
consistent with those documents as amended by the terms of this permit. In the event of inconsistencies, the
terms of this permit shall prevail, followed by the more recent document. Any ambiguity shall be resolved in
the manner that best furthers the water resource goals and purposes of Minnesota Statutes Chapters I 03B and
103D
Materials Submitted: Table 1
Materials/Documents Date Revised
Application Form&Fee August 7,2017
Erosion Control Plan&Timeline August 24,2017 September 6,2017
Managers:
Craig Leiser,President • Connie Taillon,Treasurer • Gerald Johnson,Secretary
• Anne Maule Miller,Vice-President • Sharon Schwarze,Vice-President
General Conditions:
1. This permit is a determination that the proposed activity, if conducted in accordance with the conditions herein,
shall comply with the rules and requirements of the BCWD. It does not constitute a finding that the activity complies
with the requirements of any other local, state or federal agency, nor does it convey any property or other right to the
applicant in the permitted activity or the land on which it is to occur. The applicant is responsible for complying with the
requirements of all agencies other than the BCWD, and for ensuring that it holds all property and other rights as are
necessary to carry out the permitted activity.
2. This permit shall expire one year from the date of issuance unless renewed in accordance with Section 1.0 of the
BCWD Rules. No work subject to the terms of the permit may be conducted after permit expiration. The permit may be
transferred only in accordance with Section 1.0.
3. The Owner shall grant access to the site at all reasonable times before, during and after construction to authorized
representatives of the BCWD for inspection of the activities authorized hereunder and compliance with the requirements
of this permit, the BCWD Rules and the statutes relevant thereto. This right of access shall be in addition to the access
authority of the BCWD under existing law.
4. By issuing this permit, the BCWD does not direct the activity authorized herein or warrant the soundness of the
applicant's design or methods in any respect. The BCWD waives no immunity or protection applicable to itself, an
officer,an agent or an employee pursuant to this approval.
5. The address of the applicant as indicated on the permit application shall be the address for any mailing or notice by
the BCWD in administering this permit.
6. Before commencing any activity covered by this permit, the permittee shall sign the permit, indicating familiarity
with its terms; transmit the signed copy to the BCWD by delivery, mail or fax; and confirm BCWD receipt thereof and
payment of all fees and sureties due in accordance with section 8.
Special Conditions:
1. Provide three-day written notice prior to ground disturbance.
6,
Approved by e,6
Date: September 11,2017
Karen KiII,Administrator
I hereby state that I am the owner of the property on which the work authorized by this permit is to
occur, or am the authorized agent of said owner, and that I have read and understand the terms of the
permit and the permittee's responsibilities hereunder.
Date: �/'l
[Signatur�
Athigaggi
[Print name)
Managers:
Craig Leiser,President • Connie Taillon,Treasurer • Gerald Johnson,Secretary
' Anne Maule Miller,Vice-President • Sharon Schwarze,Vice-President
``���:c�-•Kim
4A BROWN'S CREEK WATERSHED DISTRICT Brown's Creek woatershed District
CONSTRUCTION SITE INSPECTION PROGRAM Washington Conservation District
:Fo:• 455 Hayward Ave N
„-� „ Oakdale,MN 55128
�.,1.„'• EROSION & SEDIMENT CONTROL Phone:(651)330-8220 x26
, '� Fax:(651)330-7747
INSPECTION REPORT Cell:(651)331-8316
www.bcwd.org
Troy Anderson
September 15th,2017
BCWD Permit#: 2017-13
Electronic-Mailed 0
Project:Menards Expansion
Dear:Troy,
The Brown's Creek Watershed District(BCWD)conducted an inspection for erosion and
sedimentation control issues at the site noted above on 09/14/2017. The following report
summarizes the field inspection findings and describes areas of compliance/non-compliance with the
BCWD permit Rule 3.0 Erosion control. Our inspections will be using the procedures and protocols
defined in the Minnesota Pollution Control Agency(MPCA)National Pollutant Discharge
Elimination System(NPDES) General Stormwater Permit for Construction Activity.
INSPECTION REPORT
Grade
B-Good This grade describes the overall condition of the site.
Status Erosion Control Res uirenunts
Compliant All exposed soil areas must be stabilized as soon as possible to limit soil erosion but in no case later
than 14 days(or 7 days if within one(1)mile of a special or impaired water and flows to that
special or impaired water)after the construction activity in that portion of the site has temporarily or
permanently ceased.
Comments:
Compliant The normal wetted perimeter of temporary or permanent ditch that drains water must be stabilized
within 24 hrs of connection(200'back from the surface water).
Comments:
Compliant Temporary or permanent energy dissipation must be installed at outlets connected to surface water
(required within 24 hours of connection to a surface water).
Comment.
Status Sediment Control Requirements
Compliant Sediment discharge must be adequately controlled and minimized.
Comments:
Compliant Temporary sedimentation basins required for disturbance over 10 acres,or less than 5 acres if near
NPDES identified special water areas.
Comments:
Compliant-Concern Inlet control devices must be installed and maintained at all inlets.
Comments:Please continue to ensure inlet control devices are installed and maintained
properly.
Compliant Down gradient perimeter controls must be installed and maintained.
Comments:
Compliant Slope breaks must be installed on 3:1 slopes or greater with unbroken slope lengths exceeding 75
feet.
Comments:
Compliant Temporary soil stockpiles must have effective sediment controls and not be placed in a surface
water or storm water conveyance.
Status Maintenance Requirements
Compliant Erosion and sediment control BMP must be adequately maintained.
2
Comments:
Compliant Temporary sedimentation basin maintenance performed(required when collected sediment reaches
'/2 basin volume).
Comments:
Compliant Sediment deposits in ditches or surface waters must be removed within 24-hours.
Comments:-
Compliant Minimization and cleanup of sediment tracking on paved surfaces.
Comments:
Not Applicable Pollution prevention management measures for solid waste,hazardous materials and truck washing
are in place. Comments:
Status Inspection Requirements
Not Inspected Stormwater Pollution Prevention Plan on site. Comments:
Not Inspected Inspections/maintenance forms completed(inspections required 1 time per 7 days or within 24
hours of a precipitation event exceeding 0.5-inches in 24-hours).
Comments:
Status Stormwater Management Requirements
Y Pretreatment prior to discharge to surface water(>1-acre impervious). :
Status Surface water or off-site impacts
Compliant Untreated dewatering causing turbid discharges to surface waters or erosion off site.
Comments:
Under Review Wetland or other water resource impacts.
Compliant Offsite sediment discharges documented.
MAINTENANCE AND COMPLIANCE STATUS SUMMARY
OVERALL SITE GRADE: B-Good
A status described above as non-compliant indicates site conditions that must be addressed in accordance with
the BCWD Permit. Follow-up inspections will be conducted on a regular basis. Please contact Karen Kill at
651-330-8220,extension 26 if you have any questions.
Respectfully,
GRADE DESCRIPTIONS
Jared Fabian A The site is in full-compliance,all practices are in
BCWD Inspector place,and the site is well maintained.
cc: Karen Kill,BCWD B The site is in compliance,but normal maintenance
activities are required.
C The site is not in compliance.Maintenance or
supplemental practices are required.
D The site is not in compliance.Erosion and
sediment control practices are in poor condition and
controllable water resource or off-site impacts are
likely.Contact the District for a follow-up inspection
as soon as correction measures have been taken.
F The site is in severe non-compliance.Controllable
water quality or off-site impacts have occurred.
Enforcement proceedings will be initiated unless
immediate corrective actions are taken.Contact the
District immediately to schedule a follow-up
inspection.
BCWD Construction Stormwater Program
<<Date» BCWD(651)275-1136#26 Inspector: Jared Fabian