HomeMy WebLinkAbout2017-10-30 OPH Lt to American Home Remodeling - Permit Void CITY OF
OAK PARK HEIGHTS
14168 Oak Park Boulevard No. • P.O.Box 2007 • Oak Park Heights,MN 55082-2007 • Phone:651/439-4439 • Fax:651/439-0574
October 30, 2017
Mr. Jeff Oswald
American Home Remodeling MN LLC
466 Perro Creek Road
Bayport, MN 55003
Re: Sara Lentz- Basement/Living Room Remodel
13767 55th St. N., Oak Park Heights, MN
Dear Mr. Oswald:
I contacted the number on the enclosed permit application with regard to the
permit being ready for pick up on September 28th and was advised that it would
be collected the following day. To date the permit remains uncollected and is
enclosed and returned to you. The permit in the City's records has been voided.
As you are aware, no work to this project should have occurred per MN State
law. Should you wish to pursue the project at a later date, please remit a new
application and a plan for the work to be performed.
Sincerely,
PLANNING & CODE ENFORCEMENT
Juli ultman
Building Official
Enclosure
c: Sara Lentz- 13767 55th St., N., Oak Park Heights, MN
OPH Property File - 13767 57th St. N.
Tree City U.S.A.
i ',
I I
CITY OF
ill OAK PARK HEIGHTS
141$8 OA PM Blvd. N•Bax 2007.Oak Pak Heights,MN 55062•Phcne(851)435.4430•Fel(651)4390574
BUILDING PERMIT APPLICATION
Contractor: ,.-t c .,„,, �C r^^
Applicants ame: ( .._.,—
Address: LI. Pyr„n C c < K pk .�s o� 3
City/State/Zip: i34 /A.
Phone#: (o5 I-2I( 0?-3/ Fax#
State License#: City License#
Lead Certification# E-Mail
Project Supervisor:
Phone#: E-Mail
Owner: — ce1 L iv.4--a.
Address:
City/State/Zip:
Phone Number: E-Mail
CLASS OF WORK:_New_Addition Remodel V Repair Deck Demolition
Brief Description of work: {3.,•S',.._._,( Li(.,( _. 4)A8 1`
BUILDING INFORMATION: Type of Construction Occupancy Number of Stories
Square Footage Calculations: 1st Story 2nd Story Basement V Other
Max. Occupant Load Fire Sprinklers Required?Yes/ No Sprinkled yes/no
Separate permits are required for electrical,plumbing,and heating. This permit becomes null and void if work or
I
construction authorized has not commenced within 180 days,or if work is suspended or abandoned for a period of
180 days. I hereby certify that I have read and examined this application and know the same to be true and
correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified
herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of
any other stat- • • . regulating construction or the performance of construction.
_/ Date: 9//8//2
Applica Signat l
Project Address ,l 3 7 7 �� �� IV Valuation 0 0
// p,, FOR OFFICIAL USE ONLY --�
Building Permit$ (O 9 Plan Review$ Surcharge $ 1 SAC$
Meter$ Utility Inspections $ Investigation Fee$ Other Fees$
1 TOTAL PERMIT FEE $ ')O ,a 5
9I ) 1)- V c * 46(-- -r °, 553