HomeMy WebLinkAbout2017-09-14 Stantec Plan & Drainage Design Review - 3rd Submittal Stantec Consulting Services Inc. 2335 Highway 36 West St.Paul MN 55113 Tel: (651) 636-4600 Fax: (651) 636-1311 September 14, 2017 Mr. Eric Johnson,Administrator City of Oak Park Heights 14168 Oak Park Blvd.N.,P.O. Box 2007 Oak Park Heights,MN 55082-2007 Reference: Oak Park Senior Living Phase 5 — Plan and Drainage Design Review, 3rd Submittal Dear Eric, We have reviewed the plans and drainage calculations submitted regarding the proposed Oak Park Senior Living Phase 5 development re-submitted on 8/30/2017. Following are our comments and recommendations: Stormwater/Drainage Stormwater comments provided by Tyler Johnson-Tyler.Johnson@stantec.com. 1. For the proposed storm sewer design calculations,it states"Design flow value is from the 10-year event in HydroCAD model". It appears the design flow from pipe segment POND FES to Ex.CB-1 is 4.05 since that is the outflow from Pond B2 by looking at the proposed HydroCAD model,but the remaining segments of storm sewer design are all located in P6 of the proposed HydroCAD model. How are the design flows being calculated for the remaining pipe segments?Please provide more details for design flows for the remaining pipe segments in the storm sewer design calculations worksheet to ensure the correct design flows are being accounted for. 2. For the storm sewer design flows,it is recommended to ensure a minimum velocity of 3 fps be used when designing storm sewer for the 10-year storm event.This will help flush the pipe segments from debris and help prevent sediment and debris buildup within the storm sewer system. Sheet Ci— Demolition Plan 1. Comments addressed. Sheet C2 — Paving and Dimension Plan 1. Comments addressed. Sheet C2.1, C2.2— Fire Truck Turning Display 1. Fire Department to confirm adequacy of fire lanes and circulation. Desigr vrlth community n mind Mr.Eric Johnson Page 2 of 3 Reference:Oak Park Senior Living Phase 5—Plan and Drainage Design Review, 2' Submittal Sheet C3 -Grading and Erosion Control Plan 1. The stormwater facilities proposed for the site,including facilities that encroach into the pond area at the north end of the property shall be considered private and shall be owned and maintained by the Owner. 2. The City reserves the right to require additional erosion control measures as determined/necessary during the construction of the project. 3. The pond on the north side of the site will need to have sediment that has been deposited in the pond removed. This includes sediment that is currently deposited in the pond from previous phases of the project as well as any sediment that is introduced during the construction of this phase of the project. Sheet C4 -Utility Plan 1. Connections to the City's sewer and water systems shall be per the City's standards and detail plates. The city or its designee shall be present for water and sanitary sewer service connections to the City's systems. Testing will be per City requirements. 2. The watermain,hydrants, storm sewer and sanitary sewer that serve the site will be private and maintained by the owner. Sheet C5 and C6 —Details 1. Comments addressed. General Comments 1. The City reserves the right to inspect the construction of the project. The City or its designee shall be present for water and sanitary sewer service connections to the City's systems. 2. The Owner will need to comply with all requirements of the NPDES Construction Stormwater Permit and the Middle St. Croix Watershed Management Organization. The City reserves the right to require additional erosion control measures as determined/necessary during the construction of the project. 3. Lighting and landscaping to be reviewed by others. 4. The Owner shall be responsible for obtaining all required permits. Des gr with cornrnuni4y in mind (i. Mr.Eric Johnson Page 3 of 3 Reference: Oak Park Senior Living Phase 5—Plan and Drainage Design Review,2nd Submittal If you have any questions or require further information,please do not hesitate to contact me. Regards, STANTEC CONSULTING SERVICES INC. Lee M. Mann, P.E. City Engineer Phone: 651-604-4850 lee.mann@stantec.com cc: Andy Kegley, Public Works Director Julie Hultman, Building Official Scott Richards, City Planner Mark Vierling, City Attorney Lisa Danielson, City Arborist Julie Hultman From: Mann, Lee <Lee.Mann@stantec.com> Sent: Thursday, September 14, 2017 2:05 PM To: Eric Johnson Cc: Andrew Kegley; Julie Hultman; Lisa Danielson; Scott Richards (Scott@PlanningCo.com); Mark Vierling (MVierling@eckberglammers.com) Subject: Oak Park Senior Living Phase 5 Attachments: johnson_mann_2017-09-14_OakParkSrLiving Phases_review.pdf Follow Up Flag: Follow up Flag Status: Flagged Eric, Attached is our review for the latest submittal for Oak Park Senior Living Phase 5. Let me know if you have any questions. Pr MN Principal Stantec 2335 Highway 36 West, St. Paul MN 55113-3819 Phone: (651) 604-4850 Cell: (651) 775-5956 Lee.Mann@stantec.com Stantec The content of this email is the confidential property of Stantec and should not be copied,modified,retransmitted,or used for any purpose except with Stantec's written authorization.If you are not the intended recipient,please delete all copies and notify us immediately. Please consider the environment before printing this email. 1