August 22, 2017
Applicants: Hy Vee Inc.
5820 Westown Parkway
West Des Moines, Iowa 50266
Owners: Bernard and Loella Nass
5651 Manning Ave.
Stillwater, Minnesota 55082
Thomas Bidon
5757 Manning Ave
Stillwater, Minnesota 55082
RE: Annexation Application /Submission — Dated August 14, 2017
FILE NO: 236.02 - 17.06
The City does appreciate that the submission you provided, however at this time the
City has the following comments:
1. The application is rejected as it is not signed /submitted by the required property
owners as outlined in MN STAT 414.033 Sub 2 (3). Please have all property
owners provide a fully executed Petition for Annexation and development
application with the necessary signatures. The City is refunding your application
fees, minus any consulting fees to date.
2. Consistent eith the City's Annexation Policy, the City prefers to avoid the
creation -tl°te township islands or irregular jurisdictional borders that will create
practical difficulties for the provision of future public services including but not
limited to roadways, utilities, fire protection, police services, or other required
public assets. Therefore, we would strongly encourage you to first secure
partnership with Premier Bank for their land.
3. The application lacks a concept layout demonstrating transportation, utilities
.and/or any other land-use infrastructure and uses. As noted in our letter to Dan
Parks of Westwood Engineering, dated August 8th, 2017. (See attached) The City
would encourage a master plan be submitted for all areas.
4. We would ask that you please provide a letter from Stillwater Township that is
addressed to the City indicating that they are generally amenable to the
detachment and the proposed layout that may be submitted in item #3 above.
While more communication would be necessary, this would be helpful at the
outset of any proposal.
When you are able to provide these criteria, the City can commence a more thorough
review of the proposal, but please note the City will require that the Applicant's provide
the necessary cash security as required to complete necessary studies, including but not
limited to those listed below, all of which would need to be completed prior to any final
annexation action being considered.
1. A small area study will be necessary to plan land use, zoning, utility extensions,
roadway connections.
2. An impartial traffic study should be required to determine the impact of the
potential extension of 58th Street- it's connecting facilities and/or any reasonably
anticipated roadways being proposed.
3. A fiscal impact and assessment of development costs associated with roadways,
trails, ROW acquisition, fire protection, water, storm sewer, sanitary sewer and
any other upgrades to serve a potential annexation area and neighboring lands;
and that all costs and infrastructure deemed necessary by the City to serve the
planned area shall be the sole financial responsibility of the applicant.
If you have any questions please feel free to contact me at 952.221.0547.
Sincerely,
Scott D. Richards— City Planning Consultant to the City of Oak Park Heights
The Planning Company LLC
c: Eric Johnson
2
i
City of Oak Park Heights
14168 Oak Park Blvd. N•Box 2007.Oak Park Heights,MN 55082•Phone(651)439-4439•Fax(651)439-0574
August 8t,2017
Daniel Parks, PE
Westwood Professional Services
7699 Anagram Drive
Eden Prairie,MN 55344-7310 VIA EMAIL ONLY: Dan.Parks@westwoodps.com
RE:Annexation Area
This letter is in follow-up to our meeting last week and might help guide some future conversations as well. While the
concept of a commercial / retail establishment in the annexation area can be positive; there remain numerous
challenges. We would offer the following information as you begin to plan for this endeavor;
1. Consistent with past developments in the City, so costs are not shifted to other taxpayers -the Developer
would be responsible for all public costs associated to serve or are impacted by their development.In essence,
all roadways, (including any Manning access and/or any frontage roads if viable at all), trails, ROW
acquisitions,water, sewer,sanitary and related utilities would be at the sole expense of the Developer. For
these such public elements;the City would perform the design, bidding and construction and would bill ALL
such costs(including all related soft costs)to the Developer.The Developer would be required to post a CASH
ESCROW or Letter of Credit equal to 125%of the cost estimate as supplied by the City Engineer before any
designs are undertaken.A final Developers Agreement would be necessary that would incorporate these and
related items.
2. Developers are also responsible for utility connection fees which are calculated depending on type of land
use.The 2017 rates for such fees on commercial lands is$18,071 /per gross acre and would need to be paid
up-front.
3. Developers are also required to pay Park dedication charges based on the gross land area that are as outlined
in City Ordinance 402.08.E(Excerpt here)and would need to be paid up-front.
R _Com�rcial/lndusbW Dedication R ure=_eats
Developers of commend d/:uduse.ial fidmchm1mg commerci diioduatrud
porticos of Planned Developments, shall be requited to dedicate the
following:
1- At the time the site plan is approved and building permits are issued,
developers shall dedicate to the City for park,trail,playground and
public open space putpoaes,sa amount ofland up to tea(10)pert
of the gross land area within the development,as determined by the
City_
2. In those cases where the City does not require park or open spate
within such developments,the City shall require payment of a cash
dedication equal to ten(10)percent ofthe grass hard area within the
development.
4. The City is unsure if your group controls all the necessary lands for this concept,all land owners—as well the
applicant(if different from the land owner)would be required to sign any development application;making all
parties jointly and severally responsible for any and all City fees,costs,billable hours,etc.So it is vital that all
parties are well aware of these responsibilities.
5. We are aware that Washington County is undertaking a study of Manning Ave and STH 36 with various
overpass and ramp designs.To date we understand that this work might not move forward until 2021 and we
are unsure of when a final design might be adopted—likely not until at least 2020. How this might impact
available lands or access will be important to know and or if the County or State might be also acquiring land.
6. The entire question about annexation into the City and the question of certain lands being contiguous needs
to be clarified. The MN Office of Administrative Hearings—Municipal Boundary Adiustments outlines very
specific protocols,timelines and would require meaningful legal research and paperwork at the Developer's
expense. It may require public hearings,a joint Agreement between the City and the related Township—even
if NOT contested. A link to their website is here: http://www.mba.state.mn.us/and contains several sample
documents. If it is a contested annexation or one that is not acceptable to the Township; anticipate further
costs related to all legal matters and actions.
7. This site will require approval of the Brown's Creek Watershed District; this is a separate and distinct entity
from the City.
8. From a timing stand point the City does appreciate your earnestness to move forward promptly with all your
approval secured desired to be secured by mid-October.Often times,our City moves quickly through the MN
STAT 15.99 process.Unfortunately,as these lands are not in the City- nor has an annexation action officially
initiated, and as there has not yet been a formal application submitted- nor has there yet been any
utility/roadway studies completed,thus...it would seem unlikely that approvals could possibly be accomplished
by mid-October. It would seem completion of a concept approval could be accomplished — perhaps by
December 2017 if all parties moved along—but this too is speculation and is an aggressive timeline.
Finally, the developers of the lands your client (or perhaps their counterparts) may be interested in purchasing /
developing might give some consideration to preparing a MASTER PLAN for all lands lying between Manning Ave and
the Oak Park Heights western City limits—and from STH 36 south to 56th Street. The City usually appreciates an
understanding of how the balance of the land might be developed and/or impacted as the community does not desire
to create remnant or"orphaned" pieces of land that are unsuitable for other reasonable uses. It is through a master
plan that the community could envision the total impacts of the development of this area and what to reasonably expect
in the next decade—this may help to secure additional community buy-in. At the very least,this matter should be given
some careful thought about options for remaining lands.
So,we will look forward to further dialogue on this matter.
Kind Regards,
Eric Johnson
City Administrator
Cc: Scott Richards, City Planner
Mark Vieding,City Attorney
Lee Mann, City Engineer