Loading...
HomeMy WebLinkAboutPL 2003-00218 Water Service Restoration - SS Marina Dock City of Oak Park Heigh'-- METER NO: 1 38 Oak Park Blvd. N. #. 07 0300218 N Oak Park Heights, M 55082-2007 PERMIT No.. 651/439-4439 FAX: 651/439-0574 DATE ISSUED:07/22/2003 Address 6413 St Croix Trl N PIN : 34-030-20-31-0115 Legal Desc :Subdivision N/A :Lot 0 Block 0 Parcel Permit Type :Plumbing Property Type :Commercial Construction Type :Misc Activity Value Of Plumbing 20000 Water Meter Fee $394.00 NOTE: INSTALL PER MANUFACTURER SPECIFICATIONS AND PER ALL CODE AND GOVERNNG AGENCY REQUIREMENTS. PERMIT ISSUED FOR WORK RELATED TO WATER SERVICE RESTORATION TO SUNNYSIDE MARNA DOCKS AND INCLUDES THE CHARGE FOR A 1" WATER METER (W/D RADIO) AND A 2" RE-BUILT WATER METER AND THE 1 1/2" RATE WITH NEW FLANGES. PLEASE NOTE THAT THE CITY WILL INSPECT THE METER INSTALLATION. ALL INSPECTIONS TO THE WATER DOCK SYSTEM ARE TO BE REQUESTED OF AND PERFORMED BY THE STATE OF MN HEALTH DEPT. OWNER PLUMBING-COMMERCIAL $200.00 158 Club PLUMBING STATE SURCHARGE COM $0.50 6913 St Croix Tr N WATER FUND $35.00 Oak Park Hts, MN 55082- WATER METER $394.00 SEWER FUND $35.00 APPLICANT (651/265-0626) Tot al $669.50 ALBERS MECHANICAL CONTRACTORS Paid with check # 4019 200 West Plato Blvd • St. Paul, MN 55107 AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to : (1) the conditions of this permit;(2)the approval plans and specifications;(3)the applicable city approvals,Ordinances,and Codes; and, (4) the State Building Code.This permit is for only the work described, and does not grant permission for additional or related work which requires separate permits.This permit will expire and become null and void if work is not started within 180 days,or if work is suspended or abandoned fora period of 180 days any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the Minnesota State Building Code. SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. dr7N-67—r---"7"1-1M JUL 9 2003 Lill I MINNESOTA DEPARTMENT OF HEALTH \ i Division of Environmental Health REPORT ON PLANS Plans and specifications on plumbing: Sunnyside Marina, 6413 St. Croix Trail North, Stillwater, Washington County, Minnesota, Plan No. 034136 OWNERSHIP: SUBMITTER(S): Albers Mechanical Contractors, 200 West Plato Boulevard, St. Paul, Minnesota 55107 Plans Dated: Date Received: June 25, 2003 Date Reviewed: June 26. 2003 SCOPE: This review is limited to the design of this particular project only insofar as the provisions of the Minnesota Plumbing Code, as amended, apply, and does not cover the water supply or sewerage system to which this plumbing system is connected. The review is based upon the supposition that the data on which the design is based are correct, and that necessary legal authority has been obtained to construct the project. The responsibility for the design of structural features and the efficiency of equipment must be taken by the project designer. Approval is contingent upon satisfactory disposition of any requirements included in this report. Special care should be taken to insure that the material and installation of the plumbing system are in accordance with the provisions of the Minnesota Plumbing Code. A copy of the approved plans and specifications should be retained at the project location for future reference. Enclosed is a copy of the report and transmittal letter to be forwarded to the project owner. INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of the Minnesota Plumbing Code. As specified in Minnesota Rules, part 4715.2830, no plumbing work may be covered prior to completing the required tests and inspections. Provisions must be made for applying an air test at the time of the roughing-in inspection as outlined in Minnesota Rules, part 4715.2820, subpart 2, of the code. A manometer test, as specified in Minnesota Rules, part 4715.2820, subpart 3, is required at the time of the finished plumbing inspection. It is the responsibility of the contractor/installer to notify the Minnesota Department of Health when an installation for a state contract job, licensed facility, or project in an area where there is no local administrative authority is ready for an inspection and test. To schedule inspections, contact the state plumbing standards representative for your region, or call the metro office inspection hotline at 1-800-926- 6216 (7:30 a.m. to 9 a.m.), or 651/215-0836 (8 a.m. to 9 a.m.) on Monday, Wednesday or Friday. REQUIREMENT(S): 1. All plumbing shall be installed in accordance with the Minnesota Plumbing Code (see Minnesota Rules, part 4715.0320). 2. The water piping system shall be disinfected in accordance with Minnesota Rules, part 4715.2250. 3. The plumbing system shall be tested in accordance with Minnesota Rules, part 4715.2820. 4. The installation of reduced pressure zone backflow preventers is permitted only when periodic testing is done by a trained backflow preventer tester acceptable to the administrative authority. Testing intervals shall not exceed one year, and records must be kept. All devices must be tested after initial installation to assure that debris from the piping installation has not interfered with the functioning of the device. The devices shall be overhauled at least once every five years. The installation of new backflow preventers must be at least 12 inches, but not more than 6 feet above the finished floor or ground level. Sunnyside Marina Plumbing Plan No. 034136 Page 2 June 26, 2003 NOTE(S): 1. The scope of this project consists of the replacement of a 4-inch water service line to four existing docks. 2. This facility is served by an existing municipal water service connection. Authorization for construction in accordance with the approved plans may be withdrawn if construction is not undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean that recommendations or requirements for change will not be made at some later time when changed conditions, additional information, or advanced knowledge make improvements necessary. Approved: Colleen A.Erickson Public Health Engineer Environmental Health Services Section P.O. Box 64975 St. Paul,Minnesota 55164-0975 651/215-0839 CAE:sas cc: Project Owner Albers Mechanical Contractors Ms. Cindy Shilts,Building Official/ Plumbing Unit File