Loading...
HomeMy WebLinkAbout2000-04-19 NAC MemorandumNORTHWEST ASSOCIATE) CONSULTANTS 1 INC COMMUNITY PLANNING DESIGN MARKET RESEARCH MEMORANDUM TO- Tom Melena FROM: Scott Richards DATE: April 19, 2000 RE- , Oak Park Hei - WATE PUD Concept Plan Review FILE NO- 798.02 - 00.07 The Plannin Commission, at their April 13, 2000 meetin voted unanimousl to recommend the PUD concept plan for propert located on the west side of Memorial Avenue North. The total site is 8.93 acres and is platted into three lots. The area was annexed into the Cit in 1998. The re for concept plan review would allow for construction of one additional buildin on Memorial Avenue with buildin to the rear accessed via private roadwa with turnarounds. The Cit will re the applicant to subdivide the propert so that each buildin footprint and expansion area will be a separate lot, with common ownership of all drive aisles, parkin areas and g reen space. A preliminar plat for this project will be re as part of General Plan review. The applicants were available for q uestions at the meetin No adjacent propert owners spoke at the hearin The Plannin Commission recommended the PUD Concept Plan approval with the conditions found in the Plannin Report as follows: 1. The Cit will re the applicant to create a condominium ownership where the buildin footprints, includin expansion areas will be under individual ownership and the g reen space, parkin and drive aisle areas will be owned in common. The Cit will re submittal of the documents establishin the common ownership and easements sub to review and approval of the Cit En 5775 WAYZATA BOULEVARD, SUITE 555 ST. LOUIS PARK, MINNESOTA 554 1 6 PHONE 61 2-595-9636 FAX 61 2-595-9837 E-MAIL NAC WINTERNET.COM 2. A site plan with private cul -de -sac turnarounds internal to the site will be required by the City subject to review and approval of City staff. 8. The entire perimeter of the parking lots shall include a concrete curb barrier. 4. A revised landscape plan indicating additional green space and landscaping shall be submitted subject to review and approval of the City Arborist. A tree inventory of the site and conformance with the tree replacement standards shall be required and be subject to review and approval of the City Arborist. 5. A utility plan shall be submitted for review and approval of the City Engineer. 6. A phasing plan should be submitted for site development. 7. Grading and drainage plans shall be subject to review and approval of the City Engineer and the Watershed District. 8. A development agreement between the City and applicant shall be subject to review and approval of the City Attorney. 9. Detailed plans to conform with ordinance requirements shall be submitted as part of general plan review including the following: a. Parking lot b. Loading berths C. Lighting d. Landscaping /green space e. Design review f. Preliminary plat g. Comprehensive signage plan h. Site plan review i. Trash enclosures j. Outdoor recreation areas PC Cris Danielson