January 28, 1999
Mr. Will Zintel
5620 Memorial Avenue North
Stillwater, Minnesota 55082
Re: Kern Center Addition
Utility Improvement Project
Our File No. 55 -98 -802
Dear Mr. Zintel:
As per our meeting on January 21, 1999 we are responding to questions you raised regarding the
proposed water and sewer installation. The following tabulation summarizes these items.
1. Fence enclosure near the back of your lot: We have discussed the 42" RCP storm
sewer installation at this location with the Contractor, Ryan Contracting, Inc. and they
indicated a part of this feature must be removed and replaced. The depth of the new main
at this location is 17.8 feet and the horizontal distance between the fence and the sewer is
12 feet. Therefore, the Contractor indicated that at least 10'-15° of the enclosure would
need to be removed and replaced. That work would be part of the project, however it
would be best if you moved the material from the enclosure prior to the construction.
Offices St. Paul "cc Willmar ana St. Cloud, MN • Milwaukee. WI
ijeUsite _ ts`.rroo.com
Bituminous Driveway: In order to install the proposed main a strip about 10 feet wide
along the entire length will have to be removed and replaced. This work will be part of
the project. It is expected that during the actual installation about (5 working days) that
you would not be able to park vehicles along the new temporary construction easement.
The depth of the gravel and bituminous surfacing will match the existing conditions.
3. Small Trees: The four small trees along the easement will be removed temporarily
stored. and replanted at the existing location.
4. Irrigation System: As you pointed out, there is an irrigation main along the edge of the
pavement with heads that water the sodded drainage swale. The irrigation system will be
removed and replaced as part of the project probably directly through a private contractor
specializing in this work. As stated the existing lawn area that is maintained will be
Bonestroo. Rose. Anderlik and Associates, Inc. Affirmative Action Equal Opoorfunrty Employer
Principals: Otto Bonestroo, RE. • Joseph C. Anderlik. PE. • Ltarvtn L. Sorvala, PE. •
Richard E. Turne- 'E. • Glenn R. Cook, PE • Robert G. Schunicr t. PE. • Jerry A. Bourdon, RE. •
Robert W Rosen e. E. and Susan M. Eberiin. C.PA., Senior Consi1!tants
ASSDCrare Princi4?1 ;: Howard A. Sanford, r?.E. • Keith A. Gordon. P.E. • Robert R. Pfeffe -!e, P.E. •
Richard W. Fos:e- PE • David 0 Loskota. PE. • Robert C. Russek. A.I.A. • Mark A. Hanson, P.E. •
Michael T. Rautrwar'n PE. • Ted K.Fiefd, PE. • Kenneth P Anderson. PE. • i1ark R. Roifs, 'E
Sidney P 'E., L 5 • Robert F Kotsmith • Agnes M. ? r g • \ chael P Rau. 'E •
Allan Rick Schrri a:. PE.
2335 West Highway 36 ® St. Paul, MN 55113 ® 651 -636 -4600 ® Fax: 651-636 -1311
Mr. Will Zintel
5. restored with sodding as part of the project. Finally, the existing drainage swale will be
restored to its existing condition and cross section.
6. Building Services: Prior to any work a representative of this office will meet with y ou to
mutually agree upon the location of each building water and sewer service.
Very truly yours,
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
CG S 4, ,f,,„i -^
Charles A. Erickson
CAE:dh
cc: Mark V i erling
Tom Melena
Dave Hanson
Page 2