Loading...
HomeMy WebLinkAboutBP 1995-00792 New Single Family BUILDING CITY CITY PLUMBING CITY OF OAK PARK HEIGHTS CITY MECHANICAL 901 .71 14168 57th Street North PLAN REVIEW FEE 1 00.00 STATE SURCHARGE P.O.Box 2007 SIGN PERMIT Oak Park Heights,MN 55082-2007 90 CITY UTILITY(METER) 3,854.80 (612)439-4439 UTILITY CONNECTION FEE 30.00 UTILITY INSPECTION FEE 850.00 PERMIT NO. BP-95-00792 Use Zone R1A METROS.A.C. INVESTIGATION FEE Permit Issued For SINGLE FAMILY DWELLING PARKS CHARGE OTHER PERMISSION IS HEREBY GRANTED TOTAL 7,213.76 Owner DOUG JOHNSTON Contractor THOMAS MAURER CONSTRUCTION 5615 NEWGATE AVE N 1000E 146TH ST, #230 OAK PARK HEIGHTS MN 55082 BURNSVILLE, MN 55337 00-0000 953-4414 To carry out the work specified on the following described property,upon the express condition that said persons and their agents,employees and workmen,in such work done,shall conform in all respects to the provisions of the Building Code.This permit may be revoked at any time upon the violation of the provisions of said code. JOB ADDRESS CLASS OF WORK NUMBER STREET NEW ADD SIGN ALTER REPAIR MOVE DEMOLISH Mr.\VG,-'.'.'E A.will_ S FRONT or AREA OF WIDTH SIDE or LENGTH HEIGHT NO.OF LOT TYPE OF MAX.OCT. IN FEET IN FEET STORIES CONST. OCCUPANCY LOAD VALUATION IN FEET OCCUPIED —N R-3 PROPERTY DESCRIPTION: i.CT 3 BLOCK 1 AUTUMN RIDGE 2ND AUTHORIZED WORK/SPECIAL CONDITIONS: lr CONSTRUCT PER APPROVED PLAN. CONSTRUCTION(/ MUST MEET ALL MN STATE BUILDING CODE REQUIREMENTS. 4 1)01,j dor MUST MEET � revs, ,�art/4//c ISSUE DATE: 11/20/95 EXPIRATION DATE: 11/20/96 The aouhcant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the requirements enforced by the City of Oak Park Heights Building Department.I further agree to notify the Building Official of each of the required inspections 24 hours in advance as noted on Inspection Record Card. A CERTIFICATE OF OCCUPANCY MUST BE REOUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY.'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR A P ••'OF 120 DAY 'M OF THE PERMIT IS 12 MONTHS FROM DATE OF ISSUE. GING OFPICALIAIITHORI S AGENT Ogler or Contractor PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE.FINE NOT TO EXCEED FIVE HUNDRED DOLLARS(SEC0.00)OR IMPRISONMENT FOR NOT MORE THAN NINETY 1901 DAYS,OR BOTH.