Loading...
HomeMy WebLinkAbout2018-03-22 Planner Ltr to Applicant Re Application Submittal TPC3601 Thurston Avenue N,Suite 100 �I l 2lIb Anoka,MN 55303 �.l 6 Phone:763.231.5640 ''7 � M Facsimile:763.427.0520 / l �S TPC@ Pla n n i ngCo.com de cc u.+-4.➢.CW March 22,2018 Jeff Weeder Galloway and Company 6162 South Willow Drive,Suite 320 Greenwood Village, CO 80111 RE: Oak Park Heights — Public Storage Building — PUD/CUP and Design Standards Review—5710 Memorial Avenue North FILE NO: 236.02—18.01 Dear Mr.Weeder: The City is in receipt of your application materials submitted on March 12, 2018 for a proposed redevelopment at the existing Public Storage Building at 5710 Memorial Avenue North. The removal of an existing building and replacement with a three-story building will require an amended PUD/CUP and Design Standards review. With this letter we are notifying you that the application is rejected in that the information is significantly lacking in detail. The application forms and fees are being returned to you and are attached with this letter. There are several items that must be provided to deem the application compete: 1. Provide additional detail and clarity on the Utility Plan (C4.1). City Staff had numerous questions on the layout of the utilities and abandonment of certain lines. Questions on what needs to be clarified should be directed to our City Engineer,Lee Mann at 651.604.4850. 2. Provide plans for abandonment of any wells or septic systems on site. 3. Provide an updated lighting plan that includes all light fixtures, existing and proposed on site. All lighting will need to comply with the light standards found in Section 401.15.6.7 of the Zoning Ordinance and the fixtures will need to be full cut off, including the canopy lights. 4. A tree inventory of the trees to be removed must be provided. 5. A sign inventory of any existing signs that will remain must be provided. The sign area of each of the proposed signs must be provided. 6. Provide a justification for the proposed number of parking spaces for the new building based upon experience with a storage facility of this size. 7. Provide calculations of the proposed amount of green space vs hardcover that will remain with the redevelopment and well as the overall building coverage of site. 8. Please indicate if you have submitted plans to Browns Creek Watershed District and where you are at in this process. 9. Provide a snow storage plan. 10.Indicate locations of any mechanical equipment associated with the building and how it will be screened. 11. Provide a percentage of the different types and colors of the proposed building materials. 12.Provide a plan for any trash enclosures proposed for the site. 13.Provide a narrative for sustainable elements that you will incorporate into the building and site with this redevelopment. 14.The Design Guidelines indicate that the primary facades of buildings should be articulated into smaller increments of no more than 30 feet in width. City Staff suggests that additional vertical elements be added to the facades and that at least the east elevation is provided with windows to improve the appearance of the building. A greater articulation of the roof line would also break up the facades. 15.No building color wraps are allowed. The repainting of the building closest to Memorial Avenue as proposed would not be acceptable. Once all the requested materials have been provided, we will invite you and your representatives to a staff meeting at City Hall to discuss these issues and address any questions you may have. It is suggested that you provide the requested information prior to April 10, 2018, and if deemed complete, the application could be considered at the May 10, 2018 meeting. Please contact me with any questions you may have. Sincerely, Scott D. Richards, City Planning Consultant to the City of Oak Park Heights The Planning Company LLC Pc: Julie Hultman, Eric Johnson, Lee Mann 2