HomeMy WebLinkAboutBP 1999-00723 Basement Finish •
CITY BUILDING 391 . 25
CITY PLUMBING
CITY OF OAK PARK HEIGHTS CITY MECHANICAL
PLAN REVIEW FE=
14168 57th Street North STATE SURCrARGE 12 . 50
P.O. Box 2007
Oak Park Heights, MN 53082-2007 SIGN PERMIT
(612)439-4439 CITY UTILITY(METE,)
UTILITY CONNECTION FE=
UTILITY INSPECTION FE_
PERMIT NO. Use METRO S A.C.
BP-99-00723 e Zone R1A
INVESTIGATION FEE
Permit Issued For PARKS CHARGE
BASEMENT FINISH
OTHER
PERMISSION IS HEREBY GRANTED TOTAL • • 75 !#
Owner ANDREW STOHLER Contractor GARY KAFHOLD
5720 NEWBERRY CIRCLE N 21881 POMROY AVE
OAK PARK HEIGHTS MN 55082 SCANDIA MN 55073
439-0130 433-2768
To carry out the work specified on the following described property,upon the express condition that said persons and their agents,employees
and workmen,in such work done,shall conform in all respects to the provisions cf the Building Code.This permit may be revoked at any time upon
the violation of the provisions of said code.
JOB ADDRESS CLASS OF WORK
NUMBER STREET NEN r ADD SIGN ALTER REPAIR MOVE DEMOUSH
NEWBERRY CIRCLE N v I 1
FRCNT or AREA CF
WIDTH SIDE or LENGTH HE:Gi ii NC OF LOT TYPE OF MAX.CCC
IN FEET IN FEET IN FEET STORIES CONST OCCUPANCY LOAC VALUATION
cxCUP ED
V—N R-3 25 ,000
PROPERTY DESCRIPTION: LOT 5 BLOCK 1 AUTUMN RIDGE 1ST ADDITION
AUTHORIZED WORK/SPECIAL CONDITIONS:
WORK SHALL BE PERFORMED PER APPROVED PLAN AND PER MN STATE BUILDING CODE
REQUIREMENTS AS WELL AS IN ACCORDANCE WITH ALL APPLICABLE LOCAL ORDINANCE
REQUIREMENTS .
ISSUE DATE: 2/23/99 EXPIRATION DATE: 2/24/00
The applicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the
requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of
the required inspections 24 hours in advance as noted on Inspection Record Card.
A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY.'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE
WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR
A PERIOD OF 120 DA RM sIF THE PERMIT IS 12 MONTHS FROM DATE OF ISSUE /5) pal f(( bk./ 60,1,, _ Bhc Qd
c9
� X r:� 19 �
f ( Warct)
BUILDING OFFIC',AUAU_HORIZED AGENT Owner or Contractor.
PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE FINE NOT TO EXCEED FIVE HUNDRED DOLLARS(55CC CC)OR IMPRISONMENT FOR NOT
MCRE THAN NINETY(9C)DAYS,OR 30TH